Pacific Gas and Electric Company; Notice of Availability of Draft Environmental Assessment, 10566-10567 [E9-5252]

Download as PDF 10566 Federal Register / Vol. 74, No. 46 / Wednesday, March 11, 2009 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filing rwilkins on PROD1PC63 with NOTICES February 27, 2009. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP09–366–001. Applicants: Mississippi Canyon Gas Pipeline, LLC. Description: Mississippi Canyon Gas Pipeline, LLC submits Substitute First Revised Sheet No 85 to FERC Gas Tariff, Third Revised Volume 1. Filed Date: 02/24/2009. Accession Number: 20090225–0217. Comment Date: 5 p.m. Eastern Time on Monday, March 9, 2009. Docket Numbers: RP09–388–000. Applicants: Transwestern Pipeline Company, LLC. Description: Transwestern Pipeline Company, LLC submits Fifth Revised Sheet No 15 to FERC Gas Tariff, Third Revised Volume No 1. Filed Date: 02/24/2009. Accession Number: 20090225–0216. Comment Date: 5 p.m. Eastern Time on Monday, March 9, 2009. Docket Numbers: RP09–389–000. Applicants: Steckman Ridge, LP. Description: Steckman Ridge, LP submits Original Sheet 1 et al to FERC Gas Tariff, Original Volume 1 re Steckman Ridge Storage Project, to be effective 4/1/09. Filed Date: 02/24/2009. Accession Number: 20090225–0218. Comment Date: 5 p.m. Eastern Time on Monday, March 9, 2009. Docket Numbers: RP09–390–000. Applicants: Discovery Gas Transmission LLC. Description: Discovery Gas Transmission LLC submits Sixteenth Revised Sheet No. 20 to its FERC Gas Tariff, Original Volume 1, to be effective 4/1/09. Filed Date: 02/25/2009. Accession Number: 20090226–0208. Comment Date: 5 p.m. Eastern Time on Monday, March 9, 2009. Docket Numbers: RP09–391–000. Applicants: Columbia Gas Transmission, LLC. Description: Columbia Gas Transmission, LLC submits Ninety-First Revised Sheet No. 25 et al. to FERC Gas Tariff, Second Revised Volume No. 1, to be effective 4/1/09. Filed Date: 02/25/2009. Accession Number: 20090226–0207. Comment Date: 5 p.m. Eastern Time on Monday, March 9, 2009. VerDate Nov<24>2008 17:01 Mar 10, 2009 Jkt 217001 Docket Numbers: RP09–392–000. Applicants: Central Kentucky Transmission Company. Description: Central Kentucky Transmission Co submits Seventh Revised Sheet No. 6 to FERC Gas Tariff, Original Volume No. 1, to be effective 4/1/09. Filed Date: 02/25/2009. Accession Number: 20090226–0205. Comment Date: 5 p.m. Eastern Time on Monday, March 9, 2009. Docket Numbers: RP09–393–000. Applicants: Columbia Gas Transmission, LLC. Description: Columbia Gas Transmission, LLC submits Nineteenth Revised Sheet No. 644 to FERC Gas Tariff, Second Revised Volume No. 1, to be effective 4/1/09. Filed Date: 02/25/2009. Accession Number: 20090226–0206. Comment Date: 5 p.m. Eastern Time on Monday, March 9, 2009. Docket Numbers: RP09–394–000. Applicants: KO Transmission Company. Description: KO Transmission Company submits First Revised Sheet 7 et al. to its FERC Gas Tariff, Original Volume 1. Filed Date: 02/25/2009. Accession Number: 20090226–0200. Comment Date: 5 p.m. Eastern Time on Monday, March 9, 2009. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–5149 Filed 3–10–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 77–212] Pacific Gas and Electric Company; Notice of Availability of Draft Environmental Assessment March 4, 2009. In accordance with the National Environmental Policy Act of 1969, as amended, and the Federal Energy Regulatory Commission’s regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Commission has reviewed an application, filed August 26, 2008 and supplemented January 30, 2009, requesting approval of a proposed plan to provide frost protection and late fall irrigation water for commercial crops and hay in the Potter Valley Project area. Commission staff has prepared a draft Environmental Assessment (EA) and in the draft EA, staff analyzed the potential environmental effects of the proposed plan and concludes that approval of the plan, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the draft EA is on file with the Commission and is available for public inspection. The draft EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using E:\FR\FM\11MRN1.SGM 11MRN1 10567 Federal Register / Vol. 74, No. 46 / Wednesday, March 11, 2009 / Notices the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3372, or for TTY, (202) 502–8659. Any comments should be filed within 15 days from the issuance date of this notice, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1–A, Washington, DC 20426. Please affix ‘‘Potter Valley Hydroelectric Project No. 77–212’’ to all comments. Comments may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings (See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link). Kimberly D. Bose, Secretary. [FR Doc. E9–5252 Filed 3–10–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2165–022] Alabama Power Company; Notice of Availability of Final Environmental Assessment March 2, 2009. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for a New Major License for the Warrior River Hydroelectric Project, which includes the Lewis Smith and Bankhead developments. The Lewis Smith development is located in north central Alabama in the headwaters of the Black Warrior River on the Sipsey Fork in Cullman, Walker, and Winston Counties. The Bankhead development is located in west central Alabama downstream of the Lewis Smith development, on the Black Warrior River in Tuscaloosa County. The Lewis Smith development occupies 2,691.44 acres of Federal lands administered by the U.S. Forest Service, and the Bankhead development occupies 18.7 acres of Federal lands administered by the Bureau of Land Management. Staff has prepared a final Environmental Assessment (EA) for the project. The final EA contains staff’s analysis of the potential environmental effects of the project and concludes that relicensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the final EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. For further information, please contact Janet Hutzel at (202) 502–8675 or at janet.hutzel@ferc.gov. Kimberly D. Bose, Secretary. [FR Doc. E9–5214 Filed 3–10–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [EL07–86–008; EL07–88–008; EL07–92–008] Notice of Filing March 2, 2009. rwilkins on PROD1PC63 with NOTICES Ameren Services Company and Indiana Public Service Company v. Midwest Independent System Operator, Inc ................ Great Lakes Utilities. v. Midwest Independent System Operator, Inc ......................................................................................... Wabash Valley Power Association, Inc. v. Midwest Independent System Operator, Inc. .......................................................... Take notice that on February 23, 2009, the Midwest Independent System Operator, Inc. (Midwest ISO) submitted proposed revisions to the Midwest ISO Open Access Transmission, Energy and Operating Reserve Markets Tariff, pursuant to the Commission’s November 10, 2008 Order, Midwest Indep. Trans Sys. Operator, Inc., 125 FERC § 61,161 (2008) (November 10 Order). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as VerDate Nov<24>2008 17:01 Mar 10, 2009 Jkt 217001 appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 EL07–86–008 EL07–88–008 EL07–92–008 receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on March 16, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–5218 Filed 3–10–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Filing March 2, 2009. E:\FR\FM\11MRN1.SGM 11MRN1

Agencies

[Federal Register Volume 74, Number 46 (Wednesday, March 11, 2009)]
[Notices]
[Pages 10566-10567]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-5252]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 77-212]


Pacific Gas and Electric Company; Notice of Availability of Draft 
Environmental Assessment

March 4, 2009.
    In accordance with the National Environmental Policy Act of 1969, 
as amended, and the Federal Energy Regulatory Commission's regulations, 
18 CFR part 380 (Order No. 486, 52 FR 47879), the Commission has 
reviewed an application, filed August 26, 2008 and supplemented January 
30, 2009, requesting approval of a proposed plan to provide frost 
protection and late fall irrigation water for commercial crops and hay 
in the Potter Valley Project area. Commission staff has prepared a 
draft Environmental Assessment (EA) and in the draft EA, staff analyzed 
the potential environmental effects of the proposed plan and concludes 
that approval of the plan, with appropriate environmental measures, 
would not constitute a major federal action significantly affecting the 
quality of the human environment.
    A copy of the draft EA is on file with the Commission and is 
available for public inspection. The draft EA may also be viewed on the 
Commission's Web site at https://www.ferc.gov using

[[Page 10567]]

the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov 
or toll-free at 1-866-208-3372, or for TTY, (202) 502-8659.
    Any comments should be filed within 15 days from the issuance date 
of this notice, and should be addressed to the Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Room 1-A, 
Washington, DC 20426. Please affix ``Potter Valley Hydroelectric 
Project No. 77-212'' to all comments. Comments may be filed 
electronically via the Internet in lieu of paper. The Commission 
strongly encourages electronic filings (See 18 CFR 385.2001(a)(1)(iii) 
and the instructions on the Commission's Web site under the ``eFiling'' 
link).

Kimberly D. Bose,
Secretary.
[FR Doc. E9-5252 Filed 3-10-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.