Pacific Gas and Electric Company; Notice of Availability of Draft Environmental Assessment, 10566-10567 [E9-5252]
Download as PDF
10566
Federal Register / Vol. 74, No. 46 / Wednesday, March 11, 2009 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filing
rwilkins on PROD1PC63 with NOTICES
February 27, 2009.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP09–366–001.
Applicants: Mississippi Canyon Gas
Pipeline, LLC.
Description: Mississippi Canyon Gas
Pipeline, LLC submits Substitute First
Revised Sheet No 85 to FERC Gas Tariff,
Third Revised Volume 1.
Filed Date: 02/24/2009.
Accession Number: 20090225–0217.
Comment Date: 5 p.m. Eastern Time
on Monday, March 9, 2009.
Docket Numbers: RP09–388–000.
Applicants: Transwestern Pipeline
Company, LLC.
Description: Transwestern Pipeline
Company, LLC submits Fifth Revised
Sheet No 15 to FERC Gas Tariff, Third
Revised Volume No 1.
Filed Date: 02/24/2009.
Accession Number: 20090225–0216.
Comment Date: 5 p.m. Eastern Time
on Monday, March 9, 2009.
Docket Numbers: RP09–389–000.
Applicants: Steckman Ridge, LP.
Description: Steckman Ridge, LP
submits Original Sheet 1 et al to FERC
Gas Tariff, Original Volume 1 re
Steckman Ridge Storage Project, to be
effective 4/1/09.
Filed Date: 02/24/2009.
Accession Number: 20090225–0218.
Comment Date: 5 p.m. Eastern Time
on Monday, March 9, 2009.
Docket Numbers: RP09–390–000.
Applicants: Discovery Gas
Transmission LLC.
Description: Discovery Gas
Transmission LLC submits Sixteenth
Revised Sheet No. 20 to its FERC Gas
Tariff, Original Volume 1, to be effective
4/1/09.
Filed Date: 02/25/2009.
Accession Number: 20090226–0208.
Comment Date: 5 p.m. Eastern Time
on Monday, March 9, 2009.
Docket Numbers: RP09–391–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: Columbia Gas
Transmission, LLC submits Ninety-First
Revised Sheet No. 25 et al. to FERC Gas
Tariff, Second Revised Volume No. 1, to
be effective 4/1/09.
Filed Date: 02/25/2009.
Accession Number: 20090226–0207.
Comment Date: 5 p.m. Eastern Time
on Monday, March 9, 2009.
VerDate Nov<24>2008
17:01 Mar 10, 2009
Jkt 217001
Docket Numbers: RP09–392–000.
Applicants: Central Kentucky
Transmission Company.
Description: Central Kentucky
Transmission Co submits Seventh
Revised Sheet No. 6 to FERC Gas Tariff,
Original Volume No. 1, to be effective
4/1/09.
Filed Date: 02/25/2009.
Accession Number: 20090226–0205.
Comment Date: 5 p.m. Eastern Time
on Monday, March 9, 2009.
Docket Numbers: RP09–393–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: Columbia Gas
Transmission, LLC submits Nineteenth
Revised Sheet No. 644 to FERC Gas
Tariff, Second Revised Volume No. 1, to
be effective 4/1/09.
Filed Date: 02/25/2009.
Accession Number: 20090226–0206.
Comment Date: 5 p.m. Eastern Time
on Monday, March 9, 2009.
Docket Numbers: RP09–394–000.
Applicants: KO Transmission
Company.
Description: KO Transmission
Company submits First Revised Sheet 7
et al. to its FERC Gas Tariff, Original
Volume 1.
Filed Date: 02/25/2009.
Accession Number: 20090226–0200.
Comment Date: 5 p.m. Eastern Time
on Monday, March 9, 2009.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–5149 Filed 3–10–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 77–212]
Pacific Gas and Electric Company;
Notice of Availability of Draft
Environmental Assessment
March 4, 2009.
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s regulations,
18 CFR part 380 (Order No. 486, 52 FR
47879), the Commission has reviewed
an application, filed August 26, 2008
and supplemented January 30, 2009,
requesting approval of a proposed plan
to provide frost protection and late fall
irrigation water for commercial crops
and hay in the Potter Valley Project
area. Commission staff has prepared a
draft Environmental Assessment (EA)
and in the draft EA, staff analyzed the
potential environmental effects of the
proposed plan and concludes that
approval of the plan, with appropriate
environmental measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
A copy of the draft EA is on file with
the Commission and is available for
public inspection. The draft EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
E:\FR\FM\11MRN1.SGM
11MRN1
10567
Federal Register / Vol. 74, No. 46 / Wednesday, March 11, 2009 / Notices
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3372, or for TTY,
(202) 502–8659.
Any comments should be filed within
15 days from the issuance date of this
notice, and should be addressed to the
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Room 1–A, Washington, DC 20426.
Please affix ‘‘Potter Valley Hydroelectric
Project No. 77–212’’ to all comments.
Comments may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings (See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link).
Kimberly D. Bose,
Secretary.
[FR Doc. E9–5252 Filed 3–10–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2165–022]
Alabama Power Company; Notice of
Availability of Final Environmental
Assessment
March 2, 2009.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for a New Major License for the Warrior
River Hydroelectric Project, which
includes the Lewis Smith and Bankhead
developments.
The Lewis Smith development is
located in north central Alabama in the
headwaters of the Black Warrior River
on the Sipsey Fork in Cullman, Walker,
and Winston Counties. The Bankhead
development is located in west central
Alabama downstream of the Lewis
Smith development, on the Black
Warrior River in Tuscaloosa County.
The Lewis Smith development occupies
2,691.44 acres of Federal lands
administered by the U.S. Forest Service,
and the Bankhead development
occupies 18.7 acres of Federal lands
administered by the Bureau of Land
Management. Staff has prepared a final
Environmental Assessment (EA) for the
project.
The final EA contains staff’s analysis
of the potential environmental effects of
the project and concludes that
relicensing the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the final EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. You may also register
online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified
via e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, please
contact Janet Hutzel at (202) 502–8675
or at janet.hutzel@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–5214 Filed 3–10–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[EL07–86–008; EL07–88–008; EL07–92–008]
Notice of Filing
March 2, 2009.
rwilkins on PROD1PC63 with NOTICES
Ameren Services Company and Indiana Public Service Company v. Midwest Independent System Operator, Inc ................
Great Lakes Utilities. v. Midwest Independent System Operator, Inc .........................................................................................
Wabash Valley Power Association, Inc. v. Midwest Independent System Operator, Inc. ..........................................................
Take notice that on February 23, 2009,
the Midwest Independent System
Operator, Inc. (Midwest ISO) submitted
proposed revisions to the Midwest ISO
Open Access Transmission, Energy and
Operating Reserve Markets Tariff,
pursuant to the Commission’s
November 10, 2008 Order, Midwest
Indep. Trans Sys. Operator, Inc., 125
FERC § 61,161 (2008) (November 10
Order).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
VerDate Nov<24>2008
17:01 Mar 10, 2009
Jkt 217001
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
EL07–86–008
EL07–88–008
EL07–92–008
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 16, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–5218 Filed 3–10–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Filing
March 2, 2009.
E:\FR\FM\11MRN1.SGM
11MRN1
Agencies
[Federal Register Volume 74, Number 46 (Wednesday, March 11, 2009)]
[Notices]
[Pages 10566-10567]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-5252]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 77-212]
Pacific Gas and Electric Company; Notice of Availability of Draft
Environmental Assessment
March 4, 2009.
In accordance with the National Environmental Policy Act of 1969,
as amended, and the Federal Energy Regulatory Commission's regulations,
18 CFR part 380 (Order No. 486, 52 FR 47879), the Commission has
reviewed an application, filed August 26, 2008 and supplemented January
30, 2009, requesting approval of a proposed plan to provide frost
protection and late fall irrigation water for commercial crops and hay
in the Potter Valley Project area. Commission staff has prepared a
draft Environmental Assessment (EA) and in the draft EA, staff analyzed
the potential environmental effects of the proposed plan and concludes
that approval of the plan, with appropriate environmental measures,
would not constitute a major federal action significantly affecting the
quality of the human environment.
A copy of the draft EA is on file with the Commission and is
available for public inspection. The draft EA may also be viewed on the
Commission's Web site at https://www.ferc.gov using
[[Page 10567]]
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3372, or for TTY, (202) 502-8659.
Any comments should be filed within 15 days from the issuance date
of this notice, and should be addressed to the Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Room 1-A,
Washington, DC 20426. Please affix ``Potter Valley Hydroelectric
Project No. 77-212'' to all comments. Comments may be filed
electronically via the Internet in lieu of paper. The Commission
strongly encourages electronic filings (See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the Commission's Web site under the ``eFiling''
link).
Kimberly D. Bose,
Secretary.
[FR Doc. E9-5252 Filed 3-10-09; 8:45 am]
BILLING CODE 6717-01-P