Buckeye Water Conservation and Drainage District; Notice of Conduit Exemption Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 10562 [E9-5251]
Download as PDF
10562
Federal Register / Vol. 74, No. 46 / Wednesday, March 11, 2009 / Notices
valri.lightner@ee.doe.gov or T.J. Heibel
at (410) 997–7778 ext. 223; e-mail:
theibel@bcs-hq.com You must make
your request for an oral statement at
least 5 business days before the meeting.
Members of the public will be heard in
the order in which they sign up at the
beginning of the meeting. Reasonable
provision will be made to include the
scheduled oral statements on the
agenda. The Chair of the Committee will
make every effort to hear the views of
all interested parties. If you would like
to file a written statement with the
Committee, you may do so either before
or after the meeting. The Chair will
conduct the meeting to facilitate the
orderly conduct of business. This notice
is being published less than 15 days
before the date of the meeting due to
programmatic issues.
Minutes: The minutes of the meeting
will be available for public review and
copying at https://
www.brdisolutions.com/publications/
default.aspx#meetings.
Issued at Washington, DC on March 4,
2009.
Rachel Samuel,
Deputy Committee Management Officer.
[FR Doc. E9–5074 Filed 3–10–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13348–000]
Buckeye Water Conservation and
Drainage District; Notice of Conduit
Exemption Application Accepted for
Filing and Soliciting Comment,
Motions To Intervene, and Competing
Applications
rwilkins on PROD1PC63 with NOTICES
March 4, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Application for
Exemption for Small Conduit Facility.
b. Project No: 13348–000.
c. Date Filed: December 19, 2008.
d. Applicant: Buckeye Water
Conservation and Drainage District.
e. Name of Project: South Extension
Canal Project.
f. Location: The project is located near
the town of Buckeye in Maricopa
County, Arizona.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a—825r.
h. Applicant Contact: Mr. Ed Gerak,
General Manager, Buckeye Water
Conservation and Drainage District, P.O.
VerDate Nov<24>2008
17:01 Mar 10, 2009
Jkt 217001
Box 1726, Buckeye, AZ 85326, (623)
386–2196.
i. FERC Contact: Anthony DeLuca,
(202) 502–6632
j. Deadline for filing comments,
motions to intervene, competing
applications (without notices of intent),
or notices of intent to file competing
applications: 45 days from the issuance
of this notice. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. If unable
to be filed electronically, documents
may be paper-filed. To paper-file, an
original and eight copies should be
mailed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13348) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
k. Description of Request: Buckeye
Water Conservation and Drainage
District (BWCDD) requests Commission
approval for exemption for small
conduit hydroelectric facility. This
proposal consists of adding a steel tube
penstock, one Schneider Linear
Hydroengine (SLH), and a draft tube to
a recently improved impoundment
structure located on a BWCDD canal
known as the South Extension Canal
(SEC). The canal is operated for the
distribution of water for agricultural
purposes and there are no consumptive
water supply facilities associated with
the SEC project. The hydraulic capacity
of the plant will be 0.52 cubic meters
per second (18.4 cubic feet per second)
and SLH will have an estimated average
annual generation of 32,000 kWh.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–5251 Filed 3–10–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER09–747–000]
Robbins Energy LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
March 3, 2009.
This is a supplemental notice in the
above-referenced proceeding, of Robbins
Energy LLC’s application for marketbased rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is March 23,
2009.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
E:\FR\FM\11MRN1.SGM
11MRN1
Agencies
[Federal Register Volume 74, Number 46 (Wednesday, March 11, 2009)]
[Notices]
[Page 10562]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-5251]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13348-000]
Buckeye Water Conservation and Drainage District; Notice of
Conduit Exemption Application Accepted for Filing and Soliciting
Comment, Motions To Intervene, and Competing Applications
March 4, 2009.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for Exemption for Small Conduit
Facility.
b. Project No: 13348-000.
c. Date Filed: December 19, 2008.
d. Applicant: Buckeye Water Conservation and Drainage District.
e. Name of Project: South Extension Canal Project.
f. Location: The project is located near the town of Buckeye in
Maricopa County, Arizona.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a--825r.
h. Applicant Contact: Mr. Ed Gerak, General Manager, Buckeye Water
Conservation and Drainage District, P.O. Box 1726, Buckeye, AZ 85326,
(623) 386-2196.
i. FERC Contact: Anthony DeLuca, (202) 502-6632
j. Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 45 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13348) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
k. Description of Request: Buckeye Water Conservation and Drainage
District (BWCDD) requests Commission approval for exemption for small
conduit hydroelectric facility. This proposal consists of adding a
steel tube penstock, one Schneider Linear Hydroengine (SLH), and a
draft tube to a recently improved impoundment structure located on a
BWCDD canal known as the South Extension Canal (SEC). The canal is
operated for the distribution of water for agricultural purposes and
there are no consumptive water supply facilities associated with the
SEC project. The hydraulic capacity of the plant will be 0.52 cubic
meters per second (18.4 cubic feet per second) and SLH will have an
estimated average annual generation of 32,000 kWh.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-5251 Filed 3-10-09; 8:45 am]
BILLING CODE 6717-01-P