Buckeye Water Conservation and Drainage District; Notice of Conduit Exemption Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 10562 [E9-5251]

Download as PDF 10562 Federal Register / Vol. 74, No. 46 / Wednesday, March 11, 2009 / Notices valri.lightner@ee.doe.gov or T.J. Heibel at (410) 997–7778 ext. 223; e-mail: theibel@bcs-hq.com You must make your request for an oral statement at least 5 business days before the meeting. Members of the public will be heard in the order in which they sign up at the beginning of the meeting. Reasonable provision will be made to include the scheduled oral statements on the agenda. The Chair of the Committee will make every effort to hear the views of all interested parties. If you would like to file a written statement with the Committee, you may do so either before or after the meeting. The Chair will conduct the meeting to facilitate the orderly conduct of business. This notice is being published less than 15 days before the date of the meeting due to programmatic issues. Minutes: The minutes of the meeting will be available for public review and copying at https:// www.brdisolutions.com/publications/ default.aspx#meetings. Issued at Washington, DC on March 4, 2009. Rachel Samuel, Deputy Committee Management Officer. [FR Doc. E9–5074 Filed 3–10–09; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13348–000] Buckeye Water Conservation and Drainage District; Notice of Conduit Exemption Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications rwilkins on PROD1PC63 with NOTICES March 4, 2009. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Application for Exemption for Small Conduit Facility. b. Project No: 13348–000. c. Date Filed: December 19, 2008. d. Applicant: Buckeye Water Conservation and Drainage District. e. Name of Project: South Extension Canal Project. f. Location: The project is located near the town of Buckeye in Maricopa County, Arizona. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a—825r. h. Applicant Contact: Mr. Ed Gerak, General Manager, Buckeye Water Conservation and Drainage District, P.O. VerDate Nov<24>2008 17:01 Mar 10, 2009 Jkt 217001 Box 1726, Buckeye, AZ 85326, (623) 386–2196. i. FERC Contact: Anthony DeLuca, (202) 502–6632 j. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 45 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13348) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3372. k. Description of Request: Buckeye Water Conservation and Drainage District (BWCDD) requests Commission approval for exemption for small conduit hydroelectric facility. This proposal consists of adding a steel tube penstock, one Schneider Linear Hydroengine (SLH), and a draft tube to a recently improved impoundment structure located on a BWCDD canal known as the South Extension Canal (SEC). The canal is operated for the distribution of water for agricultural purposes and there are no consumptive water supply facilities associated with the SEC project. The hydraulic capacity of the plant will be 0.52 cubic meters per second (18.4 cubic feet per second) and SLH will have an estimated average annual generation of 32,000 kWh. Kimberly D. Bose, Secretary. [FR Doc. E9–5251 Filed 3–10–09; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER09–747–000] Robbins Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization March 3, 2009. This is a supplemental notice in the above-referenced proceeding, of Robbins Energy LLC’s application for marketbased rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability is March 23, 2009. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC E:\FR\FM\11MRN1.SGM 11MRN1

Agencies

[Federal Register Volume 74, Number 46 (Wednesday, March 11, 2009)]
[Notices]
[Page 10562]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-5251]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13348-000]


Buckeye Water Conservation and Drainage District; Notice of 
Conduit Exemption Application Accepted for Filing and Soliciting 
Comment, Motions To Intervene, and Competing Applications

March 4, 2009.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Application for Exemption for Small Conduit 
Facility.
    b. Project No: 13348-000.
    c. Date Filed: December 19, 2008.
    d. Applicant: Buckeye Water Conservation and Drainage District.
    e. Name of Project: South Extension Canal Project.
    f. Location: The project is located near the town of Buckeye in 
Maricopa County, Arizona.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a--825r.
    h. Applicant Contact: Mr. Ed Gerak, General Manager, Buckeye Water 
Conservation and Drainage District, P.O. Box 1726, Buckeye, AZ 85326, 
(623) 386-2196.
    i. FERC Contact: Anthony DeLuca, (202) 502-6632
    j. Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 45 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or 
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13348) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3372.
    k. Description of Request: Buckeye Water Conservation and Drainage 
District (BWCDD) requests Commission approval for exemption for small 
conduit hydroelectric facility. This proposal consists of adding a 
steel tube penstock, one Schneider Linear Hydroengine (SLH), and a 
draft tube to a recently improved impoundment structure located on a 
BWCDD canal known as the South Extension Canal (SEC). The canal is 
operated for the distribution of water for agricultural purposes and 
there are no consumptive water supply facilities associated with the 
SEC project. The hydraulic capacity of the plant will be 0.52 cubic 
meters per second (18.4 cubic feet per second) and SLH will have an 
estimated average annual generation of 32,000 kWh.

Kimberly D. Bose,
Secretary.
 [FR Doc. E9-5251 Filed 3-10-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.