California Independent System Operator Corporation; Notice of FERC Staff Attendance, 10570 [E9-5226]
Download as PDF
10570
Federal Register / Vol. 74, No. 46 / Wednesday, March 11, 2009 / Notices
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 16, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–5216 Filed 3–10–09; 8:45 am]
available on the CAISO’s Web site,
https://www.caiso.com.
March 9, 2009—MRTU Parallel
Operations Touchpoint.
March 10, 2009—MRTU Parallel
Operations Touchpoint.
Systems Interface User Group.
2010 Local Capacity Technical Study
Meeting.
March 11, 2009—Congestion Revenue
Rights.
Settlements and Market Clearing User
Group.
March 12, 2009—MRTU Parallel
Operations Touchpoint.
Joint Market Surveillance Committee
and Stakeholder Meeting.
March 16, 2009—MRTU Parallel
Operations Touchpoint.
March 17, 2009— MRTU Parallel
Operations Touchpoint.
Systems Interface User Group.
March 18, 2009—Settlements and
Market Clearing User Group
Congestion Revenue Rights.
March 19, 2009— MRTU Parallel
Operations Touchpoint.
March 20, 2009—Participating
Intermittent Resource Program Meeting.
Sponsored by the CAISO, the
teleconferences and meetings are open
to all market participants, and staff’s
attendance is part of the Commission’s
ongoing outreach efforts. The
teleconferences and meetings may
discuss matters at issue in the abovecaptioned dockets.
For further information, contact Saeed
Farrokhpay at
saeed.farrokhpay@ferc.gov; (916) 294–
0322 or Maury Kruth at
maury.kruth@ferc.gov, (916) 294–0275.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–5226 Filed 3–10–09; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Southeastern Power Administration
[Docket Nos. ER06–615–000; ER07–1257–
000; ER08–1113–000; ER08–1178–000;
OA08–62–000]
California Independent System
Operator Corporation; Notice of FERC
Staff Attendance
rwilkins on PROD1PC63 with NOTICES
March 3, 2009.
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that on the following dates
members of its staff will participate in
teleconferences and meetings to be
conducted by the California
Independent System Operator (CAISO).
The agenda and other documents for the
teleconferences and meetings are
VerDate Nov<24>2008
17:01 Mar 10, 2009
Jkt 217001
Jim Woodruff Project
AGENCY: Southeastern Power
Administration, DOE.
ACTION: Notice of proposed rate
adjustment.
SUMMARY: Southeastern proposes new
rate schedules JW–1–I and JW–2–F to
replace Wholesale Power Rate
Schedules JW–1–H and JW–2–E for a
five-year period from September 20,
2009 to September 19, 2014. Rate
schedule JW–1–I is applicable to
Southeastern power sold to existing
preference customers in the Florida
Power Corporation service (Progress
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Energy) area. Rate schedule JW–2–F is
applicable to Florida Power
Corporation.
DATES: Written comments are due on or
before June 9, 2009. A public
information and public comment forum
will be held at Courtyard by Marriott
Tallahassee Capital, in Tallahassee,
Florida, at 10 a.m. on April 23, 2009.
Persons desiring to speak at the forum
are requested to notify Southeastern at
least seven (7) days before the forum is
scheduled so that a list of forum
participants can be prepared. Others
present may speak if time permits.
Persons desiring to attend the forum
should notify Southeastern at least
seven (7) days before the forum is
scheduled. If Southeastern has not been
notified by close of business on April
16, 2009, that at least one person
intends to be present at the forum, the
forum will be canceled with no further
notice.
ADDRESSES: Written comments should
be submitted to: Kenneth E. Legg,
Administrator, Southeastern Power
Administration, Department of Energy,
1166 Athens Tech Road, Elberton,
Georgia 30635–6711. The public
comment Forum will meet at the
Courtyard by Marriott Tallahassee
Capital, 1018 Apalachee Parkway,
Tallahassee, Florida, 32301, Phone (850)
222–8822.
FOR FURTHER INFORMATION CONTACT:
Leon Jourolmon, Assistant
Administrator, Finance and Marketing
Division, Southeastern Power
Administration, Department of Energy,
1166 Athens Tech Road, Elberton,
Georgia 30635–6711, (706) 213–3800.
SUPPLEMENTARY INFORMATION: Existing
rate schedules are supported by a July
2004 Repayment Study and other
supporting data contained in FERC
Docket No. EF04–3031–000. A
repayment study prepared in February
2009 shows that the existing rates are
not adequate to meet repayment criteria.
A revised repayment study with a
revenue increase of $5,575,000, or 70.6
percent, for Fiscal Year 2009, through
the end of the study, demonstrates that
all costs are paid within their repayment
life. The increase is primarily due to
drought and higher energy prices for
purchase power and higher Corps of
Engineers operation and maintenance
expense. Southeastern is proposing to
raise rates to recover this additional
revenue.
In the proposed rate schedule JW–1–
I, which is available to preference
customers, the capacity charge has been
raised from $6.95 per kilowatt per
month to $12.62 per kilowatt per month.
The energy charge has been increased
E:\FR\FM\11MRN1.SGM
11MRN1
Agencies
[Federal Register Volume 74, Number 46 (Wednesday, March 11, 2009)]
[Notices]
[Page 10570]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-5226]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER06-615-000; ER07-1257-000; ER08-1113-000; ER08-1178-000;
OA08-62-000]
California Independent System Operator Corporation; Notice of
FERC Staff Attendance
March 3, 2009.
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that on the following dates members of its staff will
participate in teleconferences and meetings to be conducted by the
California Independent System Operator (CAISO). The agenda and other
documents for the teleconferences and meetings are available on the
CAISO's Web site, https://www.caiso.com.
March 9, 2009--MRTU Parallel Operations Touchpoint.
March 10, 2009--MRTU Parallel Operations Touchpoint.
Systems Interface User Group.
2010 Local Capacity Technical Study Meeting.
March 11, 2009--Congestion Revenue Rights.
Settlements and Market Clearing User Group.
March 12, 2009--MRTU Parallel Operations Touchpoint.
Joint Market Surveillance Committee and Stakeholder Meeting.
March 16, 2009--MRTU Parallel Operations Touchpoint.
March 17, 2009-- MRTU Parallel Operations Touchpoint.
Systems Interface User Group.
March 18, 2009--Settlements and Market Clearing User Group
Congestion Revenue Rights.
March 19, 2009-- MRTU Parallel Operations Touchpoint.
March 20, 2009--Participating Intermittent Resource Program
Meeting.
Sponsored by the CAISO, the teleconferences and meetings are open
to all market participants, and staff's attendance is part of the
Commission's ongoing outreach efforts. The teleconferences and meetings
may discuss matters at issue in the above-captioned dockets.
For further information, contact Saeed Farrokhpay at
saeed.farrokhpay@ferc.gov; (916) 294-0322 or Maury Kruth at
maury.kruth@ferc.gov, (916) 294-0275.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-5226 Filed 3-10-09; 8:45 am]
BILLING CODE 6717-01-P