California Independent System Operator Corporation; Notice of FERC Staff Attendance, 10570 [E9-5226]

Download as PDF 10570 Federal Register / Vol. 74, No. 46 / Wednesday, March 11, 2009 / Notices Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on March 16, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–5216 Filed 3–10–09; 8:45 am] available on the CAISO’s Web site, https://www.caiso.com. March 9, 2009—MRTU Parallel Operations Touchpoint. March 10, 2009—MRTU Parallel Operations Touchpoint. Systems Interface User Group. 2010 Local Capacity Technical Study Meeting. March 11, 2009—Congestion Revenue Rights. Settlements and Market Clearing User Group. March 12, 2009—MRTU Parallel Operations Touchpoint. Joint Market Surveillance Committee and Stakeholder Meeting. March 16, 2009—MRTU Parallel Operations Touchpoint. March 17, 2009— MRTU Parallel Operations Touchpoint. Systems Interface User Group. March 18, 2009—Settlements and Market Clearing User Group Congestion Revenue Rights. March 19, 2009— MRTU Parallel Operations Touchpoint. March 20, 2009—Participating Intermittent Resource Program Meeting. Sponsored by the CAISO, the teleconferences and meetings are open to all market participants, and staff’s attendance is part of the Commission’s ongoing outreach efforts. The teleconferences and meetings may discuss matters at issue in the abovecaptioned dockets. For further information, contact Saeed Farrokhpay at saeed.farrokhpay@ferc.gov; (916) 294– 0322 or Maury Kruth at maury.kruth@ferc.gov, (916) 294–0275. Kimberly D. Bose, Secretary. [FR Doc. E9–5226 Filed 3–10–09; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southeastern Power Administration [Docket Nos. ER06–615–000; ER07–1257– 000; ER08–1113–000; ER08–1178–000; OA08–62–000] California Independent System Operator Corporation; Notice of FERC Staff Attendance rwilkins on PROD1PC63 with NOTICES March 3, 2009. The Federal Energy Regulatory Commission (Commission) hereby gives notice that on the following dates members of its staff will participate in teleconferences and meetings to be conducted by the California Independent System Operator (CAISO). The agenda and other documents for the teleconferences and meetings are VerDate Nov<24>2008 17:01 Mar 10, 2009 Jkt 217001 Jim Woodruff Project AGENCY: Southeastern Power Administration, DOE. ACTION: Notice of proposed rate adjustment. SUMMARY: Southeastern proposes new rate schedules JW–1–I and JW–2–F to replace Wholesale Power Rate Schedules JW–1–H and JW–2–E for a five-year period from September 20, 2009 to September 19, 2014. Rate schedule JW–1–I is applicable to Southeastern power sold to existing preference customers in the Florida Power Corporation service (Progress PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 Energy) area. Rate schedule JW–2–F is applicable to Florida Power Corporation. DATES: Written comments are due on or before June 9, 2009. A public information and public comment forum will be held at Courtyard by Marriott Tallahassee Capital, in Tallahassee, Florida, at 10 a.m. on April 23, 2009. Persons desiring to speak at the forum are requested to notify Southeastern at least seven (7) days before the forum is scheduled so that a list of forum participants can be prepared. Others present may speak if time permits. Persons desiring to attend the forum should notify Southeastern at least seven (7) days before the forum is scheduled. If Southeastern has not been notified by close of business on April 16, 2009, that at least one person intends to be present at the forum, the forum will be canceled with no further notice. ADDRESSES: Written comments should be submitted to: Kenneth E. Legg, Administrator, Southeastern Power Administration, Department of Energy, 1166 Athens Tech Road, Elberton, Georgia 30635–6711. The public comment Forum will meet at the Courtyard by Marriott Tallahassee Capital, 1018 Apalachee Parkway, Tallahassee, Florida, 32301, Phone (850) 222–8822. FOR FURTHER INFORMATION CONTACT: Leon Jourolmon, Assistant Administrator, Finance and Marketing Division, Southeastern Power Administration, Department of Energy, 1166 Athens Tech Road, Elberton, Georgia 30635–6711, (706) 213–3800. SUPPLEMENTARY INFORMATION: Existing rate schedules are supported by a July 2004 Repayment Study and other supporting data contained in FERC Docket No. EF04–3031–000. A repayment study prepared in February 2009 shows that the existing rates are not adequate to meet repayment criteria. A revised repayment study with a revenue increase of $5,575,000, or 70.6 percent, for Fiscal Year 2009, through the end of the study, demonstrates that all costs are paid within their repayment life. The increase is primarily due to drought and higher energy prices for purchase power and higher Corps of Engineers operation and maintenance expense. Southeastern is proposing to raise rates to recover this additional revenue. In the proposed rate schedule JW–1– I, which is available to preference customers, the capacity charge has been raised from $6.95 per kilowatt per month to $12.62 per kilowatt per month. The energy charge has been increased E:\FR\FM\11MRN1.SGM 11MRN1

Agencies

[Federal Register Volume 74, Number 46 (Wednesday, March 11, 2009)]
[Notices]
[Page 10570]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-5226]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. ER06-615-000; ER07-1257-000; ER08-1113-000; ER08-1178-000; 
OA08-62-000]


California Independent System Operator Corporation; Notice of 
FERC Staff Attendance

March 3, 2009.
    The Federal Energy Regulatory Commission (Commission) hereby gives 
notice that on the following dates members of its staff will 
participate in teleconferences and meetings to be conducted by the 
California Independent System Operator (CAISO). The agenda and other 
documents for the teleconferences and meetings are available on the 
CAISO's Web site, https://www.caiso.com.
    March 9, 2009--MRTU Parallel Operations Touchpoint.
    March 10, 2009--MRTU Parallel Operations Touchpoint.
    Systems Interface User Group.
    2010 Local Capacity Technical Study Meeting.
    March 11, 2009--Congestion Revenue Rights.
    Settlements and Market Clearing User Group.
    March 12, 2009--MRTU Parallel Operations Touchpoint.
    Joint Market Surveillance Committee and Stakeholder Meeting.
    March 16, 2009--MRTU Parallel Operations Touchpoint.
    March 17, 2009-- MRTU Parallel Operations Touchpoint.
    Systems Interface User Group.
    March 18, 2009--Settlements and Market Clearing User Group
    Congestion Revenue Rights.
    March 19, 2009-- MRTU Parallel Operations Touchpoint.
    March 20, 2009--Participating Intermittent Resource Program 
Meeting.
    Sponsored by the CAISO, the teleconferences and meetings are open 
to all market participants, and staff's attendance is part of the 
Commission's ongoing outreach efforts. The teleconferences and meetings 
may discuss matters at issue in the above-captioned dockets.
    For further information, contact Saeed Farrokhpay at 
saeed.farrokhpay@ferc.gov; (916) 294-0322 or Maury Kruth at 
maury.kruth@ferc.gov, (916) 294-0275.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-5226 Filed 3-10-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.