Integrating Renewable Resources Into the Wholesale Electric Grid: Midwest Independent Transmission System Operator, Inc., Midwest Independent Transmission System Operator, Inc., Midwest Independent Transmission System Operator, Inc., Bonneville Power Administration, Midwest Independent Transmission System Operator, Inc. and Transmission Owners of the Midwest Independent Transmission System Operator, Inc., Midwest Independent Transmission System Operator, Inc.; Ameren Services Company, Northern Indiana Public Service Company v. Midwest Independent Transmission System Operator, Inc., Great Lakes Utilities, Indiana Municipal Power Agency, Missouri Joint Municipal Electric Utility Commission, Missouri River Energy Services, Prairie Power, Inc., Southern Minnesota Municipal Power Agency, Wisconsin Public Power Inc. v. Midwest Independent Transmission System Operator, Inc., Wabash Valley Power Association, Inc. v. Midwest Independent Transmission System Operator, Inc.; Supplemental Notice of Technical Conference, 9611 [E9-4721]
Download as PDF
Federal Register / Vol. 74, No. 42 / Thursday, March 5, 2009 / Notices
Energy Regulatory Commission, 888
First Street, NE., Washington, DC,
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability, is March 17,
2009.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC,
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list.
They are also available for review in
the Commission’s Public Reference
Room in Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–4706 Filed 3–4–09; 8:45 am]
jlentini on PROD1PC65 with NOTICES
BILLING CODE 6717–01–P
VerDate Nov<24>2008
16:49 Mar 04, 2009
Jkt 217001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD09–4–000, Docket No. ER04–
691–091, Docket No. ER09–411–000, Docket
No. ER09–506–000, Docket No. NJ09–1–000,
Docket Nos. ER08–637–000, ER08–637–001,
ER08–637–004, ER08–637–005, Docket Nos.
ER08–1169–001, ER08–1169–002, Docket
Nos. EL07–86–003, EL07–86–004, EL07–86–
005, EL07–86–006, EL07–86–007, EL07–86–
008, Docket Nos. EL07–88–003, EL07–88–
004, EL07–88–005, EL07–88–006, EL07–88–
007, EL08–88–008, Docket Nos. EL07–92–
003, EL07–92–004, EL07–92–005, EL07–92–
006, EL07–92–007, EL07–92–008]
Integrating Renewable Resources Into
the Wholesale Electric Grid: Midwest
Independent Transmission System
Operator, Inc., Midwest Independent
Transmission System Operator, Inc.,
Midwest Independent Transmission
System Operator, Inc., Bonneville
Power Administration, Midwest
Independent Transmission System
Operator, Inc. and Transmission
Owners of the Midwest Independent
Transmission System Operator, Inc.,
Midwest Independent Transmission
System Operator, Inc.; Ameren
Services Company, Northern Indiana
Public Service Company v. Midwest
Independent Transmission System
Operator, Inc., Great Lakes Utilities,
Indiana Municipal Power Agency,
Missouri Joint Municipal Electric Utility
Commission, Missouri River Energy
Services, Prairie Power, Inc., Southern
Minnesota Municipal Power Agency,
Wisconsin Public Power Inc. v.
Midwest Independent Transmission
System Operator, Inc., Wabash Valley
Power Association, Inc. v. Midwest
Independent Transmission System
Operator, Inc.; Supplemental Notice of
Technical Conference
February 27, 2009.
As announced in the Notice of
Technical Conference issued on
February 4, 2009 and the Second Notice
of Technical Conference issued on
February 20, 2009, a technical
conference will be held on Monday,
March 2, 2009, from 9 a.m. to 5 p.m.
(est), in the Commission Meeting Room
of the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Members of the
Commission will attend and participate
in the conference.
Additional docket numbers have been
included in the caption above because
issues in these proceedings may be
related to issues arising during the
course of discussions in the technical
conference.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
9611
The Commission welcomes industry
comments on this subject. The deadline
for comments under this docket is April
30, 2009.
A free Webcast of the meeting/
conference is available through
www.ferc.gov. Anyone with Internet
access who desires to listen to this event
can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its Webcast.
The Capitol Connection provides
technical support for the Webcasts and
offers the option of listening to the
meeting via phone-bridge for a fee. If
you have any questions, visit
www.CapitolConnection.org or call 703–
993–3100.
Transcripts of the conference will be
available immediately for a fee from Ace
Reporting Company (202–347–3700 or
1–800–336–6646). They will be
available for free on the Commission’s
eLibrary system and on the Calendar of
Events approximately one week after the
conference.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an e-mail to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or (202) 208–1659 (TTY), or send a FAX
to 202–208–2106 with the required
accommodations.
For more information about this
conference, please contact: Sarah
McKinley at sarah.mckinley@ferc.gov,
(202) 502–8368.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–4721 Filed 3–4–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL09–29–000; Docket No.
EL09–30–000]
NorthWestern Corporation; Mountain
States Transmission Intertie, LLC;
NorthWestern Corporation; Notice of
Technical Conference
February 25, 2009.
Take notice that the Commission Staff
will convene a technical conference in
the above-referenced proceedings on
Thursday, March 12, 2009, at 1 p.m.
(EDT), in a room to be designated at the
offices of the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
At the conference, Commission Staff
and interested persons will have the
E:\FR\FM\05MRN1.SGM
05MRN1
Agencies
[Federal Register Volume 74, Number 42 (Thursday, March 5, 2009)]
[Notices]
[Page 9611]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-4721]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD09-4-000, Docket No. ER04-691-091, Docket No. ER09-411-
000, Docket No. ER09-506-000, Docket No. NJ09-1-000, Docket Nos. ER08-
637-000, ER08-637-001, ER08-637-004, ER08-637-005, Docket Nos. ER08-
1169-001, ER08-1169-002, Docket Nos. EL07-86-003, EL07-86-004, EL07-86-
005, EL07-86-006, EL07-86-007, EL07-86-008, Docket Nos. EL07-88-003,
EL07-88-004, EL07-88-005, EL07-88-006, EL07-88-007, EL08-88-008, Docket
Nos. EL07-92-003, EL07-92-004, EL07-92-005, EL07-92-006, EL07-92-007,
EL07-92-008]
Integrating Renewable Resources Into the Wholesale Electric Grid:
Midwest Independent Transmission System Operator, Inc., Midwest
Independent Transmission System Operator, Inc., Midwest Independent
Transmission System Operator, Inc., Bonneville Power Administration,
Midwest Independent Transmission System Operator, Inc. and Transmission
Owners of the Midwest Independent Transmission System Operator, Inc.,
Midwest Independent Transmission System Operator, Inc.; Ameren Services
Company, Northern Indiana Public Service Company v. Midwest Independent
Transmission System Operator, Inc., Great Lakes Utilities, Indiana
Municipal Power Agency, Missouri Joint Municipal Electric Utility
Commission, Missouri River Energy Services, Prairie Power, Inc.,
Southern Minnesota Municipal Power Agency, Wisconsin Public Power Inc.
v. Midwest Independent Transmission System Operator, Inc., Wabash
Valley Power Association, Inc. v. Midwest Independent Transmission
System Operator, Inc.; Supplemental Notice of Technical Conference
February 27, 2009.
As announced in the Notice of Technical Conference issued on
February 4, 2009 and the Second Notice of Technical Conference issued
on February 20, 2009, a technical conference will be held on Monday,
March 2, 2009, from 9 a.m. to 5 p.m. (est), in the Commission Meeting
Room of the Federal Energy Regulatory Commission, 888 First Street,
NE., Washington, DC 20426. Members of the Commission will attend and
participate in the conference.
Additional docket numbers have been included in the caption above
because issues in these proceedings may be related to issues arising
during the course of discussions in the technical conference.
The Commission welcomes industry comments on this subject. The
deadline for comments under this docket is April 30, 2009.
A free Webcast of the meeting/conference is available through
www.ferc.gov. Anyone with Internet access who desires to listen to this
event can do so by navigating to www.ferc.gov's Calendar of Events and
locating this event in the Calendar. The event will contain a link to
its Webcast. The Capitol Connection provides technical support for the
Webcasts and offers the option of listening to the meeting via phone-
bridge for a fee. If you have any questions, visit
www.CapitolConnection.org or call 703-993-3100.
Transcripts of the conference will be available immediately for a
fee from Ace Reporting Company (202-347-3700 or 1-800-336-6646). They
will be available for free on the Commission's eLibrary system and on
the Calendar of Events approximately one week after the conference.
Commission conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
send an e-mail to accessibility@ferc.gov or call toll free 1-866-208-
3372 (voice) or (202) 208-1659 (TTY), or send a FAX to 202-208-2106
with the required accommodations.
For more information about this conference, please contact: Sarah
McKinley at sarah.mckinley@ferc.gov, (202) 502-8368.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-4721 Filed 3-4-09; 8:45 am]
BILLING CODE 6717-01-P