Integrating Renewable Resources Into the Wholesale Electric Grid: Midwest Independent Transmission System Operator, Inc., Midwest Independent Transmission System Operator, Inc., Midwest Independent Transmission System Operator, Inc., Bonneville Power Administration, Midwest Independent Transmission System Operator, Inc. and Transmission Owners of the Midwest Independent Transmission System Operator, Inc., Midwest Independent Transmission System Operator, Inc.; Ameren Services Company, Northern Indiana Public Service Company v. Midwest Independent Transmission System Operator, Inc., Great Lakes Utilities, Indiana Municipal Power Agency, Missouri Joint Municipal Electric Utility Commission, Missouri River Energy Services, Prairie Power, Inc., Southern Minnesota Municipal Power Agency, Wisconsin Public Power Inc. v. Midwest Independent Transmission System Operator, Inc., Wabash Valley Power Association, Inc. v. Midwest Independent Transmission System Operator, Inc.; Supplemental Notice of Technical Conference, 9611 [E9-4721]

Download as PDF Federal Register / Vol. 74, No. 42 / Thursday, March 5, 2009 / Notices Energy Regulatory Commission, 888 First Street, NE., Washington, DC, 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability, is March 17, 2009. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC, 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E9–4706 Filed 3–4–09; 8:45 am] jlentini on PROD1PC65 with NOTICES BILLING CODE 6717–01–P VerDate Nov<24>2008 16:49 Mar 04, 2009 Jkt 217001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD09–4–000, Docket No. ER04– 691–091, Docket No. ER09–411–000, Docket No. ER09–506–000, Docket No. NJ09–1–000, Docket Nos. ER08–637–000, ER08–637–001, ER08–637–004, ER08–637–005, Docket Nos. ER08–1169–001, ER08–1169–002, Docket Nos. EL07–86–003, EL07–86–004, EL07–86– 005, EL07–86–006, EL07–86–007, EL07–86– 008, Docket Nos. EL07–88–003, EL07–88– 004, EL07–88–005, EL07–88–006, EL07–88– 007, EL08–88–008, Docket Nos. EL07–92– 003, EL07–92–004, EL07–92–005, EL07–92– 006, EL07–92–007, EL07–92–008] Integrating Renewable Resources Into the Wholesale Electric Grid: Midwest Independent Transmission System Operator, Inc., Midwest Independent Transmission System Operator, Inc., Midwest Independent Transmission System Operator, Inc., Bonneville Power Administration, Midwest Independent Transmission System Operator, Inc. and Transmission Owners of the Midwest Independent Transmission System Operator, Inc., Midwest Independent Transmission System Operator, Inc.; Ameren Services Company, Northern Indiana Public Service Company v. Midwest Independent Transmission System Operator, Inc., Great Lakes Utilities, Indiana Municipal Power Agency, Missouri Joint Municipal Electric Utility Commission, Missouri River Energy Services, Prairie Power, Inc., Southern Minnesota Municipal Power Agency, Wisconsin Public Power Inc. v. Midwest Independent Transmission System Operator, Inc., Wabash Valley Power Association, Inc. v. Midwest Independent Transmission System Operator, Inc.; Supplemental Notice of Technical Conference February 27, 2009. As announced in the Notice of Technical Conference issued on February 4, 2009 and the Second Notice of Technical Conference issued on February 20, 2009, a technical conference will be held on Monday, March 2, 2009, from 9 a.m. to 5 p.m. (est), in the Commission Meeting Room of the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Members of the Commission will attend and participate in the conference. Additional docket numbers have been included in the caption above because issues in these proceedings may be related to issues arising during the course of discussions in the technical conference. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 9611 The Commission welcomes industry comments on this subject. The deadline for comments under this docket is April 30, 2009. A free Webcast of the meeting/ conference is available through www.ferc.gov. Anyone with Internet access who desires to listen to this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its Webcast. The Capitol Connection provides technical support for the Webcasts and offers the option of listening to the meeting via phone-bridge for a fee. If you have any questions, visit www.CapitolConnection.org or call 703– 993–3100. Transcripts of the conference will be available immediately for a fee from Ace Reporting Company (202–347–3700 or 1–800–336–6646). They will be available for free on the Commission’s eLibrary system and on the Calendar of Events approximately one week after the conference. Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an e-mail to accessibility@ferc.gov or call toll free 1–866–208–3372 (voice) or (202) 208–1659 (TTY), or send a FAX to 202–208–2106 with the required accommodations. For more information about this conference, please contact: Sarah McKinley at sarah.mckinley@ferc.gov, (202) 502–8368. Kimberly D. Bose, Secretary. [FR Doc. E9–4721 Filed 3–4–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL09–29–000; Docket No. EL09–30–000] NorthWestern Corporation; Mountain States Transmission Intertie, LLC; NorthWestern Corporation; Notice of Technical Conference February 25, 2009. Take notice that the Commission Staff will convene a technical conference in the above-referenced proceedings on Thursday, March 12, 2009, at 1 p.m. (EDT), in a room to be designated at the offices of the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. At the conference, Commission Staff and interested persons will have the E:\FR\FM\05MRN1.SGM 05MRN1

Agencies

[Federal Register Volume 74, Number 42 (Thursday, March 5, 2009)]
[Notices]
[Page 9611]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-4721]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. AD09-4-000, Docket No. ER04-691-091, Docket No. ER09-411-
000, Docket No. ER09-506-000, Docket No. NJ09-1-000, Docket Nos. ER08-
637-000, ER08-637-001, ER08-637-004, ER08-637-005, Docket Nos. ER08-
1169-001, ER08-1169-002, Docket Nos. EL07-86-003, EL07-86-004, EL07-86-
005, EL07-86-006, EL07-86-007, EL07-86-008, Docket Nos. EL07-88-003, 
EL07-88-004, EL07-88-005, EL07-88-006, EL07-88-007, EL08-88-008, Docket 
Nos. EL07-92-003, EL07-92-004, EL07-92-005, EL07-92-006, EL07-92-007, 
EL07-92-008]


Integrating Renewable Resources Into the Wholesale Electric Grid: 
Midwest Independent Transmission System Operator, Inc., Midwest 
Independent Transmission System Operator, Inc., Midwest Independent 
Transmission System Operator, Inc., Bonneville Power Administration, 
Midwest Independent Transmission System Operator, Inc. and Transmission 
Owners of the Midwest Independent Transmission System Operator, Inc., 
Midwest Independent Transmission System Operator, Inc.; Ameren Services 
Company, Northern Indiana Public Service Company v. Midwest Independent 
Transmission System Operator, Inc., Great Lakes Utilities, Indiana 
Municipal Power Agency, Missouri Joint Municipal Electric Utility 
Commission, Missouri River Energy Services, Prairie Power, Inc., 
Southern Minnesota Municipal Power Agency, Wisconsin Public Power Inc. 
v. Midwest Independent Transmission System Operator, Inc., Wabash 
Valley Power Association, Inc. v. Midwest Independent Transmission 
System Operator, Inc.; Supplemental Notice of Technical Conference

February 27, 2009.
    As announced in the Notice of Technical Conference issued on 
February 4, 2009 and the Second Notice of Technical Conference issued 
on February 20, 2009, a technical conference will be held on Monday, 
March 2, 2009, from 9 a.m. to 5 p.m. (est), in the Commission Meeting 
Room of the Federal Energy Regulatory Commission, 888 First Street, 
NE., Washington, DC 20426. Members of the Commission will attend and 
participate in the conference.
    Additional docket numbers have been included in the caption above 
because issues in these proceedings may be related to issues arising 
during the course of discussions in the technical conference.
    The Commission welcomes industry comments on this subject. The 
deadline for comments under this docket is April 30, 2009.
    A free Webcast of the meeting/conference is available through 
www.ferc.gov. Anyone with Internet access who desires to listen to this 
event can do so by navigating to www.ferc.gov's Calendar of Events and 
locating this event in the Calendar. The event will contain a link to 
its Webcast. The Capitol Connection provides technical support for the 
Webcasts and offers the option of listening to the meeting via phone-
bridge for a fee. If you have any questions, visit 
www.CapitolConnection.org or call 703-993-3100.
    Transcripts of the conference will be available immediately for a 
fee from Ace Reporting Company (202-347-3700 or 1-800-336-6646). They 
will be available for free on the Commission's eLibrary system and on 
the Calendar of Events approximately one week after the conference.
    Commission conferences are accessible under section 508 of the 
Rehabilitation Act of 1973. For accessibility accommodations, please 
send an e-mail to accessibility@ferc.gov or call toll free 1-866-208-
3372 (voice) or (202) 208-1659 (TTY), or send a FAX to 202-208-2106 
with the required accommodations.
    For more information about this conference, please contact: Sarah 
McKinley at sarah.mckinley@ferc.gov, (202) 502-8368.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-4721 Filed 3-4-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.