Notice of Attendance at Nepool Meetings, 9605-9606 [E9-4714]
Download as PDF
Federal Register / Vol. 74, No. 42 / Thursday, March 5, 2009 / Notices
AGENDA: The Commission will receive
presentations on the following topic:
Voter Registration Databases: Initial
Discussion on Reviewing HAVA
Mandated Guidance.
This hearing will be open to the
public.
PERSON TO CONTACT FOR INFORMATION:
Bryan Whitener. Telephone: (202) 566–
3100.
Alice Miller,
Chief Operating Officer, U.S. Election
Assistance Commission.
[FR Doc. E9–4760 Filed 3–3–09; 11:15 am]
BILLING CODE 6820–KF–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13345–000]
Shearwater Design Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13345–000) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–4716 Filed 3–4–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
jlentini on PROD1PC65 with NOTICES
February 26, 2009.
On December 15, 2008, and
supplemented on February 5, 2009, and
February 24, 2009, Shearwater Design
Inc. filed an application, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Homeowner Tidal Power Electric
Generation Project located on the
Kennebec River in Sagadahoc County,
Maine. The project uses no dam or
impoundment.
The proposed project would consist
of: (1) 6 hydrokinetic turbine units that
would be directly connected to
individual homes, with a total installed
capacity of 60-kilowatts, and (2)
appurtenant facilities. The project is
estimated to have an annual generation
of 150,000-kilowatt-hours, which would
be used by the homeowners and net
metered back into the electricity power
grid.
Applicant Contact: Ms. Dot Kelly,
Shearwater Design Inc., 83 Captain
Perry Drive, Phippsburg, Maine 04562,
phone: (207) 443–4787.
FERC Contact: Kelly T. Houff (202)
502–6393.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
VerDate Nov<24>2008
16:49 Mar 04, 2009
Jkt 217001
Federal Energy Regulatory
Commission
[Project No. 13347–000]
Wells Rural Electric Company; Notice
of Application for Preliminary Permit
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Protests
9605
Suite A, Reno, NV 89511, (775) 852–
1440.
FERC Contact: Jake Tung, (202) 502–
8757.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13347) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–4705 Filed 3–4–09; 8:45 am]
BILLING CODE 6717–01–P
February 25, 2009.
On December 18, 2008, Wells Rural
Electric Company filed an application,
pursuant to section 4(f) of the Federal
Power Act (FPA), to study the proposed
Bishop Creek Dam Water Power Project.
The proposed project would be located
on Bishop Creek or Bishop Creek
Reservoir in Elko, Nevada. The existing
Bishop Dam is federally owned and/or
operated by the Bureau of Land
Management.
The proposed project would consist
of: (1) A new dam of 79-foot high and
crest of 408.7-foot long; (2) a reservoir
holding 17,167-acre-foot of water at
normal pool elevation at 5,923 feet; (3)
a new 4 mile-long, 25-kilovolt
transmission line; (4) a powerhouse
containing one generating unit with one
megawatts (MW) capacity; and (5)
appurtenant facilities. The proposed
project would have the potential for
annual generation of 8.766 gigawatthours (GWh).
Applicant Contact: Mr. Dan Dyer or
Andrew Hammond, Dyer Engineering
Consultants Inc., 5442 Longley Lane,
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Attendance at Nepool
Meetings
February 26, 2009.
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and
Commission staff may attend the
following upcoming NEPOOL meetings:
• NEPOOL Participants Committee;
• March 6 (Manchester, VT);
• April 3 (Boston, MA);
• May 1 (Location TBD);
• June 5 (Location TBD);
• June 23 (Location TBD);
• NEPOOL Markets Committee
Meeting;
• March 10–11 (Marlborough, MA);
• March 25–26 (Location TBD);
• April 6–7 (Westborough, MA);
• May 12–13 (Marlborough, MA);
• June 9–10 (Marlborough, MA).
E:\FR\FM\05MRN1.SGM
05MRN1
9606
Federal Register / Vol. 74, No. 42 / Thursday, March 5, 2009 / Notices
jlentini on PROD1PC65 with NOTICES
For additional meeting information,
see https://www.iso-ne.com/committees/
comm_wkgrps/.
The discussions at each of the
meetings described above may address
matters at issue in the following
proceedings:
Docket No. ER07–397, ISO New
England Inc. and the New England
Power Pool Participants Committee
Docket No. ER07–476, ISO New
England Inc. and the New England
Power Pool Participants Committee
Docket No. ER08–41, ISO New
England Inc. and the New England
Power Pool Participants Committee
Docket No. ER08–54, ISO New
England Inc.
Docket No. ER08–633, ISO New
England Inc.
Docket No. ER08–697, ISO New
England Inc. and the New England
Power Pool Participants Committee
Docket No. ER08–1209, ISO New
England Inc. and the New England
Power Pool Participants Committee
Docket No. ER08–1328, New England
Participating Transmission Owners
Participants Committee
Docket No. OA08–58, ISO New
England Inc., et al.
Docket No. EL09–3, Ashburnham
Municipal Light Plant, et al. v. Berkshire
Power Company, LLC, and ISO New
England Inc.
Docket No. EL09–8, Lavand & Lodge,
LLC v. ISO New England, Inc.
Docket No. ER09–197, ISO New
England Inc.
Docket No. ER09–291, ISO New
England Inc.
Docket No. ER09–467, ISO New
England Inc.
Docket No. ER09–584, Bangor HydroElectric Company
Docket No. ER09–640, ISO New
England Inc. and the New England
Power Pool Participants Committee
Docket No. ER09–716, ISO New
England Inc.
For more information, contact Pat
Rooney, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (202) 502–6205 or
patrick.rooney@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–4714 Filed 3–4–09; 8:45 am]
BILLING CODE 6717–01–P
VerDate Nov<24>2008
16:49 Mar 04, 2009
Jkt 217001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Docket Nos. EG09–10–000, EG09–11–000,
EG09–12–000, EG09–13–000, EG09–14–000,
EG09–15–000, EG09–16–000, EG09–17–000]
Majestic Wind Power LLC, Enel
Stillwater, LLC, NRG Texas Power LLC,
FPL Energy Oliver Wind I, LLC, Bull
Creek Wind LLC, Buffalo Ridge I LLC,
Moraine Wind II LLC, Pebble Springs
Wind LLC; Notice of Effectiveness of
Exempt Wholesale Generator Status
February 27, 2009.
Take notice that during the month of
January 2009, the status of the abovecaptioned entities as Exempt Wholesale
Generators Companies became effective
by operation of the Commission’s
regulations 18 CFR 366.7(a).
Kimberly D. Bose.
Secretary.
[FR Doc. E9–4723 Filed 3–4–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–11–000]
Northern Lights 2009–2010 Zone EF
Expansion Project; Notice of
Availability of the Environmental
Assessment for the Proposed Northern
Lights 2009–2010 Zone EF Expansion
Project
February 27, 2009.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) on the
natural gas pipeline facilities proposed
by Northern Natural Gas Company
(Northern) in the above-referenced
docket.
The EA was prepared to satisfy the
requirements of the National
Environmental Policy Act. The staff
concludes that approval of the proposed
project, with appropriate mitigating
measures, would not constitute a major
federal action significantly affecting the
quality of the human environment.
The EA assesses the potential
environmental effects of the
construction and operation of the
proposed pipeline facilities including:
• An approximately 6.37-mile-long
extension of the 30-inch-diameter
Faribault-Farmington D-Line in Rice
and Dakota Counties, Minnesota;
• An approximately 6.06-mile-long
extension of the 20-inch-diameter
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Farmington-North Branch C-Line in
Washington County, Minnesota;
• An approximately 6.04-mile-long
extension of the 20-inch-diameter Elk
River loop in Anoka County, Minnesota;
• The replacement of approximately
9.32 miles of the 3- and 2-inch-diameter
Rockford Branch Line with 22.95 miles
of 16-inch-diameter pipeline in Carver,
Wright, and Hennepin Counties,
Minnesota;
• An approximately 11.21 miles of
the 16-inch-diameter greenfield
Corcoran Branch Line in Hennepin
County, Minnesota;
• A new 15,000 horsepower ISO-rated
greenfield compressor station located
near Albert Lea, Minnesota in Freeborn
County, Minnesota; and
• A new meter station in Hennepin
County, Minnesota.
Northern proposes to expand the
capacity of its facilities in these areas to
transport an additional 135,000
decatherms per day of natural gas for
incremental firm winter service.
The EA has been placed in the public
files of the FERC. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First Street,
NE., Room 2A, Washington, DC 20426,
(202) 502–8371.
Copies of the EA have been mailed to
federal, state and local agencies, public
interest groups, interested individuals,
newspapers, and parties to this
proceeding.
Any person wishing to comment on
the EA may do so. To ensure
consideration prior to a Commission
decision on the proposal, it is important
that we receive your comments before
the date specified below.
Please note that the Commission
strongly encourages electronic filing of
any comments or interventions or
protests to this proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s
Guide. Before you can file comments
you will need to create a free account
which can be created by clicking on
‘‘Sign-up.’’
If you are filing written comments,
please carefully follow these
instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your comments to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426;
E:\FR\FM\05MRN1.SGM
05MRN1
Agencies
[Federal Register Volume 74, Number 42 (Thursday, March 5, 2009)]
[Notices]
[Pages 9605-9606]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-4714]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Attendance at Nepool Meetings
February 26, 2009.
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission and Commission staff may attend the following
upcoming NEPOOL meetings:
NEPOOL Participants Committee;
March 6 (Manchester, VT);
April 3 (Boston, MA);
May 1 (Location TBD);
June 5 (Location TBD);
June 23 (Location TBD);
NEPOOL Markets Committee Meeting;
March 10-11 (Marlborough, MA);
March 25-26 (Location TBD);
April 6-7 (Westborough, MA);
May 12-13 (Marlborough, MA);
June 9-10 (Marlborough, MA).
[[Page 9606]]
For additional meeting information, see https://www.iso-ne.com/
committees/comm_wkgrps/.
The discussions at each of the meetings described above may address
matters at issue in the following proceedings:
Docket No. ER07-397, ISO New England Inc. and the New England Power
Pool Participants Committee
Docket No. ER07-476, ISO New England Inc. and the New England Power
Pool Participants Committee
Docket No. ER08-41, ISO New England Inc. and the New England Power
Pool Participants Committee
Docket No. ER08-54, ISO New England Inc.
Docket No. ER08-633, ISO New England Inc.
Docket No. ER08-697, ISO New England Inc. and the New England Power
Pool Participants Committee
Docket No. ER08-1209, ISO New England Inc. and the New England
Power Pool Participants Committee
Docket No. ER08-1328, New England Participating Transmission Owners
Participants Committee
Docket No. OA08-58, ISO New England Inc., et al.
Docket No. EL09-3, Ashburnham Municipal Light Plant, et al. v.
Berkshire Power Company, LLC, and ISO New England Inc.
Docket No. EL09-8, Lavand & Lodge, LLC v. ISO New England, Inc.
Docket No. ER09-197, ISO New England Inc.
Docket No. ER09-291, ISO New England Inc.
Docket No. ER09-467, ISO New England Inc.
Docket No. ER09-584, Bangor Hydro-Electric Company
Docket No. ER09-640, ISO New England Inc. and the New England Power
Pool Participants Committee
Docket No. ER09-716, ISO New England Inc.
For more information, contact Pat Rooney, Office of Energy Markets
Regulation, Federal Energy Regulatory Commission at (202) 502-6205 or
patrick.rooney@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-4714 Filed 3-4-09; 8:45 am]
BILLING CODE 6717-01-P