9236
Federal Register / Vol. 74, No. 40 / Tuesday, March 3, 2009 / Notices
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 13, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–4423 Filed 3–2–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–65–000]
Columbia Gas Transmission, LLC;
Jefferson Gas, LLC; Notice of
Application
mstockstill on PROD1PC66 with NOTICES
February 24, 2009.
Take notice that on February 12, 2009,
Columbia Gas Transmission, LLC
(Columbia), 5151 San Felipe, Suite
2500, Houston TX 77056, filed,
pursuant to section 7 of the Natural Gas
Act (NGA), an application to abandon
by sale to Jefferson Gas, LLC (Jefferson),
certain natural gas facilities located in
Menifee and Morgan Counties,
Kentucky. Columbia requests that the
Commission find the facilities, when
sold, as exempt from the Commission’s
jurisdiction pursuant to section 1(b) of
the NGA. This filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
VerDate Nov<24>2008
16:42 Mar 02, 2009
Jkt 217001
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Any questions regarding this
Application should be directed to
Fredric J. George, Lead Counsel,
Columbia Gas Transmission LLC, P.O.
Box 1273, Charleston, West Virginia
25325–1273, at (304) 357–2359 or by fax
at (304) 357–3206.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the below listed
comment date, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Motions to intervene, protests and
comments may be filed electronically
via the internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: March 17, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–4424 Filed 3–2–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
February 23, 2009.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER07–521–008.
Applicants: New York Independent
System Operator, Inc.
E:\FR\FM\03MRN1.SGM
03MRN1
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 74, No. 40 / Tuesday, March 3, 2009 / Notices
Description: New York Independent
System Operator, Inc. Submits
Compliance Filing.
Filed Date: 02/18/2009.
Accession Number: 20090219–0291.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 11, 2009.
Docket Numbers: ER07–1332–003.
Applicants: Smoky Hills Wind Farm,
LLC.
Description: Supplemental
Information to April 2008 Change in
Status Filing and Request for Shortened
Notice Period of Smoky Hills Wind
Farm, LLC.
Filed Date: 02/20/2009.
Accession Number: 20090220–5146.
Comment Date: 5 p.m. Eastern Time
on Monday, March 02, 2009.
Docket Numbers: ER08–1377–001.
Applicants: Xcel Energy Services Inc.
Description: Northern States Power
Co—MN & Northern States Power Co—
WI Submits Revised Versions of Certain
Service Agreements to Rate Schedule
Transmission Service Tm–1 Relating to
Implementation of the Midwest ISO
Ancillary Services Market etc.
Filed Date: 02/19/2009.
Accession Number: 20090220–0179.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 12, 2009.
Docket Numbers: ER08–1574–002.
Applicants: ORNI 18, LLC.
Description: ORNI 18, LLC submits
Notice of Non-Material Change in
Status.
Filed Date: 02/19/2009.
Accession Number: 20090219–5044.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 12, 2009.
Docket Numbers: ER08–1591–001.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation Submits
Instant Filing in Compliance with
FERC’s 12/30/08 Letter.
Filed Date: 01/29/2009.
Accession Number: 20090202–0542.
Comment Date: 5 p.m. Eastern Time
on Monday, March 02, 2009.
Docket Numbers: ER09–169–001.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corp Submits
Substitute Second Revised Sheet 20.00
et al. to FERC Electric Tariff, Third
Replacement Volume 1 in Compliance
with the Commission’s 12/30/08 Order.
Filed Date: 01/28/2009.
Accession Number: 20090129–0224.
Comment Date: 5 p.m. Eastern Time
on Monday, March 02, 2009.
Docket Numbers: ER09–507–001.
Applicants: PSEG Power Connecticut
LLC.
VerDate Nov<24>2008
16:42 Mar 02, 2009
Jkt 217001
Description: PSEG Power Connecticut
LLC Submits Revised Reliability Mustrun Agreements with ISO New England
Inc for Power Connecticut’s et al.
Filed Date: 02/18/2009.
Accession Number: 20090219–0286.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 11, 2009.
Docket Numbers: ER09–552–001.
Applicants: Goldfinch Capital
Management, LP.
Description: Goldfinch Capital
Management, LP Submits Petition for
Acceptance of Initial Tariff and Waivers.
Filed Date: 02/19/2009.
Accession Number: 20090220–0297.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 12, 2009.
Docket Numbers: ER09–564–001.
Applicants: PJM Interconnection,
LLC.
Description: PJM Interconnection,
LLC submits Sub. Original Service
Agreement 2085 that Supersedes
Original Service Agreement 2085,
Substituting the Name DPL Energy, LLC
for DP&L in the Agreement.
Filed Date: 02/18/2009.
Accession Number: 20090219–0290.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 11, 2009.
Docket Numbers: ER09–594–001.
Applicants: Coaltrain Energy LP.
Description: Coaltrain Energy LP
Submits Substitute Original Sheets 1
and 2 and Revised Attachment A.
Filed Date: 02/19/2009.
Accession Number: 20090220–0296.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 12, 2009.
Docket Numbers: ER09–595–001.
Applicants: Gotham Energy
Marketing, LP.
Description: Gotham Energy
Marketing LP Submits Substitute Tariff
Sheets and Revised Attachment A.
Filed Date: 02/19/2009.
Accession Number: 20090220–0294.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 12, 2009.
Docket Numbers: ER09–596–001.
Applicants: Silverado Energy LP.
Description: Silverado Energy LP
Submits Substitute Original Sheets 1
and 2 and Revised Attachment A.
Filed Date: 02/19/2009.
Accession Number: 20090220–0292.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 12, 2009.
Docket Numbers: ER09–597–001.
Applicants: Rockpile Energy LP.
Description: Rockpile Energy LP
Submits Substitute Tariff Sheets and
Revised Attachment A.
Filed Date: 02/19/2009.
Accession Number: 20090220–0293.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 12, 2009.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
9237
Docket Numbers: ER09–598–001.
Applicants: Big Bog Energy, LP.
Description: Big Bog Energy LP
Submits Substitute Original Sheets 1
and 2 and Revised Attachment A.
Filed Date: 02/19/2009.
Accession Number: 20090220–0295.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 12, 2009.
Docket Numbers: ER09–626–001.
Applicants: Participating
Transmission Owners Administrative
Committee.
Description: SSP Administrative
Committee Request Waiver of Certain
Business Practice Standards of the
NAESB, etc.
Filed Date: 02/18/2009.
Accession Number: 20090219–0287.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 11, 2009.
Docket Numbers: ER09–712–000.
Applicants: High Lonesome Mesa,
LLC.
Description: Petition of High
Lonesome Mesa, LLC for Order
Accepting Market-Based Rate Tariff for
Filing and Granting Waivers and
Blanket Approvals.
Filed Date: 02/18/2009.
Accession Number: 20090219–0292.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 11, 2009.
Docket Numbers: ER09–727–000.
Applicants: Central Illinois Light
Company.
Description: Central Illinois Light
Company Submits Boundary Line
Agreement between AmerenCILCO and
the City of Springfield, IL et al.
requesting an effective date of 4/19/09
for the Boundary Line Agreement.
Filed Date: 02/18/2009.
Accession Number: 20090219–0288.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 11, 2009.
Docket Numbers: ER09–728–000.
Applicants: Twin Cities Energy, LLC.
Description: Twin Cities Energy, LLC
Submits Notice of Succession to the
Tariff of Alberta Power, LLC.
Filed Date: 02/18/2009.
Accession Number: 20090219–0289.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 11, 2009.
Docket Numbers: ER09–729–000.
Applicants: Avista Corporation.
Description: Avista Corp Submits
Revisions to its Electric Tariff Volume
11 for the Sale, Assignments, or Transfer
of Transmission Rights, etc.
Filed Date: 02/19/2009.
Accession Number: 20090220–0291.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 12, 2009.
Docket Numbers: ER09–730–000.
Applicants: PJM Interconnection LLC.
E:\FR\FM\03MRN1.SGM
03MRN1
mstockstill on PROD1PC66 with NOTICES
9238
Federal Register / Vol. 74, No. 40 / Tuesday, March 3, 2009 / Notices
Description: PJM Interconnection
Submits Revised Tariff Sheets of their
Open Access Transmission Tariff.
Filed Date: 02/19/2009.
Accession Number: 20090220–0290.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 12, 2009.
Docket Numbers: ER09–731–000.
Applicants: Illinois Power Company.
Description: Ameren Services
Company Submits Construction
Agreement between AmerenIP and the
Exelon Generation Company, LLC.
Filed Date: 02/19/2009.
Accession Number: 20090220–0298.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 12, 2009.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
VerDate Nov<24>2008
16:42 Mar 02, 2009
Jkt 217001
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–4383 Filed 3–2–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2413–110]
Georgia Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
February 24, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project use
of project lands.
b. Project No.: 2413–110.
c. Date Filed: February 2, 2009.
d. Applicant: Georgia Power
Company.
e. Name of Project: Wallace
Hydroelectric Project.
f. Location: The proposal would be
located on the Clarks Fork Creek, in
Morgan County, Georgia and the project
occupies U.S. lands within the Oconee
National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Herbie Johnson,
Georgia Power Company, 125 Wallace
Dam Road, NE., Eatonton, Georgia
31024; (706) 485–8704.
i. FERC Contact: Gina Krump,
Telephone (202) 502–6704, and e-mail:
Gina.Krump@ferc.gov.
j. Deadline for Filing Comments,
Motions to Intervene, and Protest:
March 24, 2009.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: Georgia
Power Company (GPC) is requesting to
permit construction of two bridge
crossings over the Clarks Fork Creek, a
minor tributary stream of Lake Oconee.
The proposal would consist of a foot/
golf cart path crossing impacting .05
acres of project lands, and a roadway
bridge impacting .48 acres of project
lands. The bridges are in association
with a planned residential development
and golf course known as ‘‘Kingston on
Lake Oconee’’ on privately owned lands
outside of the project boundary. No
dredging is proposed in association with
the application. The licensee has
consulted the U.S. Army Corps of
Engineers, U.S. Fish and Wildlife
Service, and state and local agencies on
its application.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call (866) 208–3372 or email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
E:\FR\FM\03MRN1.SGM
03MRN1
Agencies
[Federal Register Volume 74, Number 40 (Tuesday, March 3, 2009)]
[Notices]
[Pages 9236-9238]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-4383]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
February 23, 2009.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER07-521-008.
Applicants: New York Independent System Operator, Inc.
[[Page 9237]]
Description: New York Independent System Operator, Inc. Submits
Compliance Filing.
Filed Date: 02/18/2009.
Accession Number: 20090219-0291.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 11, 2009.
Docket Numbers: ER07-1332-003.
Applicants: Smoky Hills Wind Farm, LLC.
Description: Supplemental Information to April 2008 Change in
Status Filing and Request for Shortened Notice Period of Smoky Hills
Wind Farm, LLC.
Filed Date: 02/20/2009.
Accession Number: 20090220-5146.
Comment Date: 5 p.m. Eastern Time on Monday, March 02, 2009.
Docket Numbers: ER08-1377-001.
Applicants: Xcel Energy Services Inc.
Description: Northern States Power Co--MN & Northern States Power
Co--WI Submits Revised Versions of Certain Service Agreements to Rate
Schedule Transmission Service Tm-1 Relating to Implementation of the
Midwest ISO Ancillary Services Market etc.
Filed Date: 02/19/2009.
Accession Number: 20090220-0179.
Comment Date: 5 p.m. Eastern Time on Thursday, March 12, 2009.
Docket Numbers: ER08-1574-002.
Applicants: ORNI 18, LLC.
Description: ORNI 18, LLC submits Notice of Non-Material Change in
Status.
Filed Date: 02/19/2009.
Accession Number: 20090219-5044.
Comment Date: 5 p.m. Eastern Time on Thursday, March 12, 2009.
Docket Numbers: ER08-1591-001.
Applicants: California Independent System Operator Corporation.
Description: California Independent System Operator Corporation
Submits Instant Filing in Compliance with FERC's 12/30/08 Letter.
Filed Date: 01/29/2009.
Accession Number: 20090202-0542.
Comment Date: 5 p.m. Eastern Time on Monday, March 02, 2009.
Docket Numbers: ER09-169-001.
Applicants: California Independent System Operator Corporation.
Description: California Independent System Operator Corp Submits
Substitute Second Revised Sheet 20.00 et al. to FERC Electric Tariff,
Third Replacement Volume 1 in Compliance with the Commission's 12/30/08
Order.
Filed Date: 01/28/2009.
Accession Number: 20090129-0224.
Comment Date: 5 p.m. Eastern Time on Monday, March 02, 2009.
Docket Numbers: ER09-507-001.
Applicants: PSEG Power Connecticut LLC.
Description: PSEG Power Connecticut LLC Submits Revised Reliability
Must-run Agreements with ISO New England Inc for Power Connecticut's et
al.
Filed Date: 02/18/2009.
Accession Number: 20090219-0286.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 11, 2009.
Docket Numbers: ER09-552-001.
Applicants: Goldfinch Capital Management, LP.
Description: Goldfinch Capital Management, LP Submits Petition for
Acceptance of Initial Tariff and Waivers.
Filed Date: 02/19/2009.
Accession Number: 20090220-0297.
Comment Date: 5 p.m. Eastern Time on Thursday, March 12, 2009.
Docket Numbers: ER09-564-001.
Applicants: PJM Interconnection, LLC.
Description: PJM Interconnection, LLC submits Sub. Original Service
Agreement 2085 that Supersedes Original Service Agreement 2085,
Substituting the Name DPL Energy, LLC for DP&L in the Agreement.
Filed Date: 02/18/2009.
Accession Number: 20090219-0290.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 11, 2009.
Docket Numbers: ER09-594-001.
Applicants: Coaltrain Energy LP.
Description: Coaltrain Energy LP Submits Substitute Original Sheets
1 and 2 and Revised Attachment A.
Filed Date: 02/19/2009.
Accession Number: 20090220-0296.
Comment Date: 5 p.m. Eastern Time on Thursday, March 12, 2009.
Docket Numbers: ER09-595-001.
Applicants: Gotham Energy Marketing, LP.
Description: Gotham Energy Marketing LP Submits Substitute Tariff
Sheets and Revised Attachment A.
Filed Date: 02/19/2009.
Accession Number: 20090220-0294.
Comment Date: 5 p.m. Eastern Time on Thursday, March 12, 2009.
Docket Numbers: ER09-596-001.
Applicants: Silverado Energy LP.
Description: Silverado Energy LP Submits Substitute Original Sheets
1 and 2 and Revised Attachment A.
Filed Date: 02/19/2009.
Accession Number: 20090220-0292.
Comment Date: 5 p.m. Eastern Time on Thursday, March 12, 2009.
Docket Numbers: ER09-597-001.
Applicants: Rockpile Energy LP.
Description: Rockpile Energy LP Submits Substitute Tariff Sheets
and Revised Attachment A.
Filed Date: 02/19/2009.
Accession Number: 20090220-0293.
Comment Date: 5 p.m. Eastern Time on Thursday, March 12, 2009.
Docket Numbers: ER09-598-001.
Applicants: Big Bog Energy, LP.
Description: Big Bog Energy LP Submits Substitute Original Sheets 1
and 2 and Revised Attachment A.
Filed Date: 02/19/2009.
Accession Number: 20090220-0295.
Comment Date: 5 p.m. Eastern Time on Thursday, March 12, 2009.
Docket Numbers: ER09-626-001.
Applicants: Participating Transmission Owners Administrative
Committee.
Description: SSP Administrative Committee Request Waiver of Certain
Business Practice Standards of the NAESB, etc.
Filed Date: 02/18/2009.
Accession Number: 20090219-0287.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 11, 2009.
Docket Numbers: ER09-712-000.
Applicants: High Lonesome Mesa, LLC.
Description: Petition of High Lonesome Mesa, LLC for Order
Accepting Market-Based Rate Tariff for Filing and Granting Waivers and
Blanket Approvals.
Filed Date: 02/18/2009.
Accession Number: 20090219-0292.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 11, 2009.
Docket Numbers: ER09-727-000.
Applicants: Central Illinois Light Company.
Description: Central Illinois Light Company Submits Boundary Line
Agreement between AmerenCILCO and the City of Springfield, IL et al.
requesting an effective date of 4/19/09 for the Boundary Line
Agreement.
Filed Date: 02/18/2009.
Accession Number: 20090219-0288.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 11, 2009.
Docket Numbers: ER09-728-000.
Applicants: Twin Cities Energy, LLC.
Description: Twin Cities Energy, LLC Submits Notice of Succession
to the Tariff of Alberta Power, LLC.
Filed Date: 02/18/2009.
Accession Number: 20090219-0289.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 11, 2009.
Docket Numbers: ER09-729-000.
Applicants: Avista Corporation.
Description: Avista Corp Submits Revisions to its Electric Tariff
Volume 11 for the Sale, Assignments, or Transfer of Transmission
Rights, etc.
Filed Date: 02/19/2009.
Accession Number: 20090220-0291.
Comment Date: 5 p.m. Eastern Time on Thursday, March 12, 2009.
Docket Numbers: ER09-730-000.
Applicants: PJM Interconnection LLC.
[[Page 9238]]
Description: PJM Interconnection Submits Revised Tariff Sheets of
their Open Access Transmission Tariff.
Filed Date: 02/19/2009.
Accession Number: 20090220-0290.
Comment Date: 5 p.m. Eastern Time on Thursday, March 12, 2009.
Docket Numbers: ER09-731-000.
Applicants: Illinois Power Company.
Description: Ameren Services Company Submits Construction Agreement
between AmerenIP and the Exelon Generation Company, LLC.
Filed Date: 02/19/2009.
Accession Number: 20090220-0298.
Comment Date: 5 p.m. Eastern Time on Thursday, March 12, 2009.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-4383 Filed 3-2-09; 8:45 am]
BILLING CODE 6717-01-P