Combined Notice of Filings, 8928-8929 [E9-4222]
Download as PDF
8928
Federal Register / Vol. 74, No. 38 / Friday, February 27, 2009 / Notices
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–4219 Filed 2–26–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
rwilkins on PROD1PC63 with NOTICES2
February 24, 2009.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP96–320–100.
Applicants: Gulf South Pipeline
Company, LP.
Description: Gulf South Pipeline
Company, LP submits a capacity release
agreement containing negotiated rate
provisions executed by Gulf South and
Texla Energy Management, Inc.
Filed Date: 02/20/2009.
Accession Number: 20090223–0016.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Docket Numbers: RP09–306–001.
Applicants: Kern River Gas
Transmission Company.
Description: Kern River Gas
Transmission Company submits Sub.
Fifth Revised Sheet 161 of its FERC Gas
Tariff, Second Revised Volume 1, to be
effective 1/30/08.
Filed Date: 02/20/2009.
Accession Number: 20090223–0015.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Docket Numbers: RP09–375–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: Columbia Gas
Transmission, LLC submits Fourteenth
Revised Sheet 281 et al. to FERC Gas
Tariff Second Revised Volume 1, to be
effective 3/23/09.
Filed Date: 02/20/2009.
Accession Number: 20090223–0013.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Docket Numbers: RP09–376–000.
Applicants: Sabine Pipe Line LLC.
Description: Sabine Pipe Line request
for temporary waiver of certain tariff
provisions and Commission
Regulations.
Filed Date: 02/20/2009.
Accession Number: 20090223–0011.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Docket Numbers: RP09–377–000.
Applicants: Chandeleur Pipe Line
Company.
VerDate Nov<24>2008
16:39 Feb 26, 2009
Jkt 217001
Description: Chandeleur Pipe Line
Company submits Second Revised Sheet
42 to be incorporated into FERC Gas
Tariff, Second Revised Volume 1, to be
effective 3/34/09.
Filed Date: 02/20/2009.
Accession Number: 20090223–0014.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Docket Numbers: RP09–378–000.
Applicants: Sabine Pipe Line LLC.
Description: Sabine Pipe Line submits
First Revised Sheet 287 as part of
Original Volume 1 of Sabine’s FERC Gas
Tariff, to be effective 3/1/09.
Filed Date: 02/20/2009.
Accession Number: 20090223–0012.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Docket Numbers: RP09–379–000.
Applicants: Viking Gas Transmission
Company.
Description: Viking Gas Transmission
Company submits Twenty-Fifth Revised
Sheet 5B of FERC Gas Tariff, First
Revised Volume 1, to be effective 4/1/
09.
Filed Date: 02/20/2009.
Accession Number: 20090223–0023.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Docket Numbers: RP09–380–000.
Applicants: Viking Gas Transmission
Company.
Description: Viking Gas Transmission
Company submits Fourteenth Revised
Sheet 5C of its FERC Gas Tariff First
Revised Volume 1, to be effective 4/1/
09.
Filed Date: 02/20/2009.
Accession Number: 20090223–0022.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Docket Numbers: RP09–381–000.
Applicants: ANR Pipeline Company.
Description: ANA Pipeline Company
submits Fifth Revised Sheet 101 et al. to
FERC Gas Tariff, Second Revised
Volume 1, to be effective 4/1/09.
Filed Date: 02/20/2009.
Accession Number: 20090223–0017.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Docket Numbers: RP09–382–000.
Applicants: ANR Storage Company.
Description: ANR Storage Company
submits Fourth Revised Sheet 131 et al.
to FERC Gas Tariff, Original Volume 1,
to be effective 4/1/09.
Filed Date: 02/20/2009.
Accession Number: 20090223–0018.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Docket Numbers: RP09–383–000.
Applicants: Blue Lake Gas Storage
Company.
Description: Blue Lake Gas Storage
Company submits Third Revised Sheet
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
131 et al. to its FERC Gas Tariff, First
Revised Volume 1, to be effective 4/1/
09.
Filed Date: 02/20/2009.
Accession Number: 20090223–0019.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Docket Numbers: RP09–384–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Gulf South Pipeline
Company, LP submits a potentially nonconforming discounted rate agreement
under Rate Schedule FTS executed by
Gulf South and its customer.
Filed Date: 02/20/2009.
Accession Number: 20090223–0020.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Docket Numbers: RP09–385–000.
Applicants: Caledonia Energy
Partners, LLC.
Description: Caledonia Energy
Partners, LLC submits First Revised
Sheet 43 et al. of its FERC Gas Tariff,
First Revised Volume 1, to be effective
3/23/09.
Filed Date: 02/20/2009.
Accession Number: 20090223–0021.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 4, 2009.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
E:\FR\FM\27FEN1.SGM
27FEN1
Federal Register / Vol. 74, No. 38 / Friday, February 27, 2009 / Notices
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–4222 Filed 2–26–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Discussion Questions. The Staff’s
Response to Discussion Questions has
been revised to organize better the
previous information posted with
respect to the December 3, 2008
technical conference and to add
additional information. In addition, the
dates on which each item is revised will
be listed so that viewers can more easily
determine the new items that have been
added as the document is revised.
Because these documents will be
updated and revised on a regular basis,
a Secretary’s Notice will not be
published for every change made on the
eTariff Web site. Instead, an RSS feed
has been established for the Web site so
that software companies and vendors
can be alerted when information on the
site is revised. Anyone may subscribe to
the RSS feed which is located at
https://www.ferc.gov/xml/etariff.xml.
For further information, please
contact Keith Pierce at 202–502–8525 or
by sending an e-mail to
ETariff@ferc.gov.
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E9–4245 Filed 2–26–09; 8:45 am]
[Docket No. RM01–5–000]
BILLING CODE 6717–01–P
Electronic Tariff Filings; Notice of
Posting of Information and
Establishment of RSS Feed
DEPARTMENT OF ENERGY
February 23, 2009.
Federal Energy Regulatory
Commission
rwilkins on PROD1PC63 with NOTICES2
714,1
In Order No.
the Commission
adopted regulations requiring that, as of
April 1, 2010, tariff and tariff related
filings must be made electronically
according to a set of protocols and
standards. A Web site (https://
www.ferc.gov/docs-filing/etariff.asp)
and an e-mail address (etariff@ferc.gov)
have been established to provide
information, and respond to questions,
about the protocols and standards.
The information on the Web site
needs to be updated and revised from
time to time. Answers to the questions
received through e-mail also may be of
value to software providers and
companies other than the requester. In
order to ensure that all vendors and
providers have access to this
information, the questions and answers
will be posted on the Web site under the
‘‘Staff’s Response to Discussion
Questions’’ link. Similar questions may
be grouped together with a single
response.
The following revised documents are
being posted: Preliminary FERC eTariff
Rules Table, Type of Filing, Attachment
Reference Code, and Staff’s Response to
1 Electronic Tariff Filings, Order No. 714, 73 FR
57515 (Oct. 3, 2008), 124 FERC ¶ 61,270 (Sept. 19,
2008).
VerDate Nov<24>2008
16:39 Feb 26, 2009
Jkt 217001
[Docket Nos. CP04–47–001 and CP05–396–
001]
Sabine Pass LNG, L.P.; Notice of
Availability of the Environmental
Assessment for the Proposed Sabine
Pass LNG Export Project
February 23, 2009.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) on the
liquefied natural gas (LNG) facilities
proposed by Sabine Pass LNG, L.P.
(Sabine Pass) in the above-referenced
docket.
The EA was prepared to satisfy the
requirements of the National
Environmental Policy Act. The FERC
staff concludes that approval of the
proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
In order to operate its facility for the
purpose of exporting LNG, Sabine Pass
is proposing to modify four 24-inch
diameter check valves located on
Transfer Arms A and D on the East and
West Jetty Platforms. The modifications
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
8929
to the check valves would allow LNG to
flow in the direction for ship loading
from the LNG Storage Tanks.
The terminal operations currently
utilize the Phase I facilities under
Docket CP04–47–000. Until the Phase II
facilities under Docket CP05–396–000
are fully operational, LNG export
operations would be limited to one
transfer arm at a maximum rate of 6,000
cubic meters per hour (m3/hr). Once the
Phase II facilities are fully operational,
two transfer arms on one Jetty would be
used for exporting LNG at a loading rate
of 12,000 m3/hr.
The terminal would be able to operate
in a dual import/export capacity or
solely as an import terminal depending
on market conditions. In a dual
operational capacity that utilizes Phase
I and II facilities, one jetty would be
dedicated for loading and the other for
unloading. However, the valve
modifications and unloading arms
would not be permanent and could
either be returned to full unloading or
kept in-place to allow for dual import/
export functionality.
No other modifications to equipment,
plant processes, or safety systems would
be required to facilitate export
operations. Additionally, no new
environmental resources and no new
stakeholders would be affected.
The EA has been placed in the public
files of the FERC. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First Street,
NE., Room 2A, Washington, DC 20426,
(202) 502–8371.
Copies of the EA have been mailed to
Federal, State, and local agencies;
public interest groups; interested
individuals and affected landowners;
newspapers and libraries; and parties to
this proceeding.
Any person wishing to comment on
the EA may do so. To ensure
consideration prior to a Commission
decision on the proposal, it is important
that we receive your comments before
the date specified below.
You can make a difference by
providing us with your specific
comments or concerns about the Sabine
Export Project. Your comments should
focus on the potential environmental
effects, reasonable alternatives, and
measures to avoid or lessen
environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please send in your comments
so that they will be received in
Washington, DC on or before March 23,
2009.
E:\FR\FM\27FEN1.SGM
27FEN1
Agencies
[Federal Register Volume 74, Number 38 (Friday, February 27, 2009)]
[Notices]
[Pages 8928-8929]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-4222]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
February 24, 2009.
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Docket Numbers: RP96-320-100.
Applicants: Gulf South Pipeline Company, LP.
Description: Gulf South Pipeline Company, LP submits a capacity
release agreement containing negotiated rate provisions executed by
Gulf South and Texla Energy Management, Inc.
Filed Date: 02/20/2009.
Accession Number: 20090223-0016.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Docket Numbers: RP09-306-001.
Applicants: Kern River Gas Transmission Company.
Description: Kern River Gas Transmission Company submits Sub. Fifth
Revised Sheet 161 of its FERC Gas Tariff, Second Revised Volume 1, to
be effective 1/30/08.
Filed Date: 02/20/2009.
Accession Number: 20090223-0015.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Docket Numbers: RP09-375-000.
Applicants: Columbia Gas Transmission, LLC.
Description: Columbia Gas Transmission, LLC submits Fourteenth
Revised Sheet 281 et al. to FERC Gas Tariff Second Revised Volume 1, to
be effective 3/23/09.
Filed Date: 02/20/2009.
Accession Number: 20090223-0013.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Docket Numbers: RP09-376-000.
Applicants: Sabine Pipe Line LLC.
Description: Sabine Pipe Line request for temporary waiver of
certain tariff provisions and Commission Regulations.
Filed Date: 02/20/2009.
Accession Number: 20090223-0011.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Docket Numbers: RP09-377-000.
Applicants: Chandeleur Pipe Line Company.
Description: Chandeleur Pipe Line Company submits Second Revised
Sheet 42 to be incorporated into FERC Gas Tariff, Second Revised Volume
1, to be effective 3/34/09.
Filed Date: 02/20/2009.
Accession Number: 20090223-0014.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Docket Numbers: RP09-378-000.
Applicants: Sabine Pipe Line LLC.
Description: Sabine Pipe Line submits First Revised Sheet 287 as
part of Original Volume 1 of Sabine's FERC Gas Tariff, to be effective
3/1/09.
Filed Date: 02/20/2009.
Accession Number: 20090223-0012.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Docket Numbers: RP09-379-000.
Applicants: Viking Gas Transmission Company.
Description: Viking Gas Transmission Company submits Twenty-Fifth
Revised Sheet 5B of FERC Gas Tariff, First Revised Volume 1, to be
effective 4/1/09.
Filed Date: 02/20/2009.
Accession Number: 20090223-0023.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Docket Numbers: RP09-380-000.
Applicants: Viking Gas Transmission Company.
Description: Viking Gas Transmission Company submits Fourteenth
Revised Sheet 5C of its FERC Gas Tariff First Revised Volume 1, to be
effective 4/1/09.
Filed Date: 02/20/2009.
Accession Number: 20090223-0022.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Docket Numbers: RP09-381-000.
Applicants: ANR Pipeline Company.
Description: ANA Pipeline Company submits Fifth Revised Sheet 101
et al. to FERC Gas Tariff, Second Revised Volume 1, to be effective 4/
1/09.
Filed Date: 02/20/2009.
Accession Number: 20090223-0017.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Docket Numbers: RP09-382-000.
Applicants: ANR Storage Company.
Description: ANR Storage Company submits Fourth Revised Sheet 131
et al. to FERC Gas Tariff, Original Volume 1, to be effective 4/1/09.
Filed Date: 02/20/2009.
Accession Number: 20090223-0018.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Docket Numbers: RP09-383-000.
Applicants: Blue Lake Gas Storage Company.
Description: Blue Lake Gas Storage Company submits Third Revised
Sheet 131 et al. to its FERC Gas Tariff, First Revised Volume 1, to be
effective 4/1/09.
Filed Date: 02/20/2009.
Accession Number: 20090223-0019.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Docket Numbers: RP09-384-000.
Applicants: Gulf South Pipeline Company, LP.
Description: Gulf South Pipeline Company, LP submits a potentially
non-conforming discounted rate agreement under Rate Schedule FTS
executed by Gulf South and its customer.
Filed Date: 02/20/2009.
Accession Number: 20090223-0020.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Docket Numbers: RP09-385-000.
Applicants: Caledonia Energy Partners, LLC.
Description: Caledonia Energy Partners, LLC submits First Revised
Sheet 43 et al. of its FERC Gas Tariff, First Revised Volume 1, to be
effective 3/23/09.
Filed Date: 02/20/2009.
Accession Number: 20090223-0021.
Comment Date: 5 p.m. Eastern Time on Wednesday, March 4, 2009.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies
[[Page 8929]]
of the intervention or protest to the Federal Energy Regulatory
Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-4222 Filed 2-26-09; 8:45 am]
BILLING CODE 6717-01-P