Environmental Impact Statements and Regulations; Availability of EPA Comments, 7889-7890 [E9-3661]
Download as PDF
Federal Register / Vol. 74, No. 33 / Friday, February 20, 2009 / Notices
where clearing is required for
permanent works, approved
construction roads, or excavation
operations, all trees, native shrubbery,
and vegetation will be preserved and
will be protected from damage by
construction operations and equipment.
• All construction equipment and
vehicles will be pressure-washed
(especially the undercarriage) to remove
foreign soil and debris that may
introduce weeds into the Project areas.
• If revegetation is required,
regionally native plants will be used.
Basis for Decision
Western has determined that the
potential environmental impacts from
its connected actions, with
implementation of the mitigation
measures, are expected to be
insignificant. Western did not select the
No Action alternative because it would
not meet the Applicants’ objectives. In
reaching this decision, Western
considered the low environmental
impacts in the U.S. from modifying the
three substations and construction of
one tap facility as connected actions to
the Keystone Oil Pipeline Project.
Dated: February 13, 2009.
Timothy J. Meeks,
Administrator
[FR Doc. E9–3655 Filed 2–19–09; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2008–0717; FRL–8401–4]
Agency Information Collection
Activities; Proposed Collection;
Comment Request; Pressed Wood
Manufacturing Industry Survey; EPA
ICR No. 2328.01, OMB Control No.
2070–new; Extension of Comment
Period
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice; extension of comment
period.
SUMMARY: EPA issued a notice in the
Federal Register of December 24, 2008,
concerning a new Information
Collection Request (ICR) entitled:
‘‘Pressed Wood Manufacturing Industry
Survey’’ and is identified by EPA ICR
No. 2328.01 and OMB Control No.
2070–new, on which EPA was soliciting
comments. This document extends the
comment period for 30 days, from
February 23, 2009 to March 25, 2009.
DATES: Comments, identified by docket
identification (ID) number EPA–HQ–
VerDate Nov<24>2008
17:55 Feb 19, 2009
Jkt 217001
OPPT–2008–0717, must be received on
or before March 25, 2009.
ENVIRONMENTAL PROTECTION
AGENCY
Follow the detailed
instructions as provided under
ADDRESSES in the Federal Register
document of December 24, 2008.
7889
[ER–FRL–8590–7]
ADDRESSES:
FOR FURTHER INFORMATION CONTACT: For
general information contact: Colby
Lintner, Regulatory Coordinator,
Environmental Assistance Division
(7408M), Office of Pollution Prevention
and Toxics, Environmental Protection
Agency, 1200 Pennsylvania Ave., NW.,
Washington, DC 20460–0001; telephone
number: (202) 554–1404; e-mail address:
TSCA-Hotline@epa.gov.
For technical information contact:
William Silagi, Economics, Exposure
and Technology Division (7406M),
Office of Pollution Prevention and
Toxics, Environmental Protection
Agency, 1200 Pennsylvania Ave., NW.,
Washington, DC 20460–0001; telephone
number: (202) 564–8788; fax number:
(202) 564–8893; e-mail address:
silagi.william@epa.gov.
This
document extends the public comment
period established in the Federal
Register of December 24, 2008 (73 FR
79083) (FRL–8393–3). In that document,
EPA announced that it is planning to
submit a request for a new ICR to the
Office of Management and Budget
(OMB) in compliance with the
Paperwork Reduction Act (PRA) (44
U.S.C. 3501 et seq.). The ICR is entitled:
‘‘Pressed Wood Manufacturing Industry
Survey’’ and is identified by EPA ICR
No. 2328.01 and OMB Control No.
2070–new. Before submitting the ICR to
OMB for review and approval, EPA was
soliciting comments on specific aspects
of the proposed information collection.
EPA is hereby extending the comment
period, which was set to end on
February 23, 2009, to March 25, 2009.
To submit comments, or access the
public docket, please follow the detailed
instructions as provided under
ADDRESSES in the December 24, 2008
Federal Register document. If you have
questions, consult the technical person
listed under FOR FURTHER INFORMATION
CONTACT.
SUPPLEMENTARY INFORMATION:
List of Subjects
Environmental protection, Reporting
and recordkeeping requirements.
Dated: January 29, 2009.
James Jones,
Acting Assistant Administrator, Office of
Prevention, Pesticides and Toxic Substances.
[FR Doc. E9–2557 Filed 2–19–09; 8:45 am]
BILLING CODE 6560–50–S
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 6, 2008 (73 FR 19833).
Draft EISs
EIS No. 20080072, ERP No. D–IBR–
J39038–C0, Southern Delivery System
Project, Water Supply Development,
Execution of up to 40-year Contracts
for Use of Fryingpan-Arkansas Project
Facilities, Special Use Permit, El Paso
County, CO.
Summary: EPA raised environmental
concerns about potential impacts to
water quality, including the potential to
exacerbate existing water quality
impairments to water bodies within the
Arkansas River Basin and the lack of
mitigation for these impacts. EPA also
raised concerns over the potential for
increased flooding and erosion due to
return flows into Fountain Creek. EPA
strongly encouraged Reclamation to
include mitigation commitments to
offset the water quality impacts in the
Final EIS and Record of Decision. Rating
EC2.
EIS No. 20080333, ERP No. D–IBR–
J39040–CO, Windy Gap Firming
Project, Construct a New Water
Storage Reservoir to Deliver Water to
Front Range and West Slope
Communities and Industries,
Funding, NPDES and U.S. Army COE
Section 404 Permit, Grand and
Larimer Counties, CO.
Summary: EPA expressed
environmental objections to this
proposal because of the potential for the
project to worsen water quality in
already impaired waters without the
assurance of adequate mitigation. EPA
also requested additional information
regarding impacts to water quality and
stream morphology. Rating EO2.
EIS No. 20080343, ERP No. D–FRC–
L03014–OR, Jordan Cove Energy and
Pacific Connector Gas Pipeline
Project, Construction and Operation,
Liquefied Natural Gas (LNG) Import
E:\FR\FM\20FEN1.SGM
20FEN1
7890
Federal Register / Vol. 74, No. 33 / Friday, February 20, 2009 / Notices
Terminal and Natural Gas Pipeline
Facilities, Coos, Douglas, Jackson and
Klamath Counties, OR.
Summary: EPA expressed
environmental concerns about potential
degradation of in-bay resources
associated with the preferred alternative
pipeline route identified in the DEIS
and the level of analysis devoted to key
resources. Rating EO2.
EIS No. 20080386, ERP No. D–COE–
K39116–CA, SanPedro Waterfront
Project, Proposed Specific
Development Project and Associated
Infrastructure Improvements on
Approximately 400 Acres, Currently
Operated by Los Angeles Harbor
Department (LAHD), Located along
the West Side of Los Angeles Harbor’s
Main Channel, from the Vincent
Thomas Bridge to Cabrillo Beach, U.S.
Army Section 10 and 404 and Section
103 Marine Protection, Research, and
Sanctuaries Act Permits, (MPRSA)
City of Los Angeles, CA.
Summary: EPA expressed
environmental concerns about
significant and unavoidable impacts to
air quality and environmental justice
communities, and planned ocean
disposal of sediments. EPA
recommended commitments to conduct
an already planned port-wide health
risk assessment, coordination with the
environmental justice community to
identify additional measures to offset
health impacts, implementation of a
port-wide health impacts assessment to
inform mitigation, and identification of
beneficial reuse opportunities for
sediment. Rating EC2.
EIS No. 20080461, ERP No. D–FRC–
B03007–00, Hubline/East to West
Project, Proposes to Modify its
Existing Natural Gas Transmission
Pipeline System in MA, CT, RI and
NJ.
Summary: EPA does not object to the
proposed project. Rating LO.
EIS No. 20080462, ERP No. D–FRC–
K03031–CA, South Feather Power
Project, (Project No. 2088–068),
Application to Relicense its 104megawatt, South Fork Feather River,
Lost Creek and Slate Creek, Butte,
Yuba and Plumas Counties, CA.
Summary: EPA expressed
environmental concerns about water
quality and construction impacts, and
requested additional information on the
impacts of climate change on the project
and the analysis of cumulative impacts.
Rating EC2.
VerDate Nov<24>2008
17:55 Feb 19, 2009
Jkt 217001
Dated: February 17, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–3661 Filed 2–19–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8590–6]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or http: //www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements.
Filed 02/09/2009 Through 02/13/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090035, Draft EIS, AFS, CA,
Tehachapi Renewable Transmission
Project, Construct, Operate and
Maintain New and Upgraded 500 kV
and 220 kV Transmission Lines and
Substations, Special Use
Authorization, Angeles National
Forest, Los Angeles County, CA,
Comment Period Ends: 04/06/2009,
Contact: Justin Seastrand, 626–574–
5278.
EIS No. 20090036, Final EIS, AFS, NM,
Glacier Project, To Maintain and
Promote Native Vegetation,
Communities that are Diverse,
Productive, Healthy, Implementation,
Superior National Forest, Kawishiwi
Ranger District, St. Louis and Lake
Counties, MN, Wait Period Ends: 03/
23/2009, Contact: Susan Duffy, 218–
365–3097.
EIS No. 20090037, Final Supplement,
AFS, MN, Echo Trail Area Forest
Management Project, Updated
Information to Addressing Water
Quality and Watershed Health,
Superior National Forest, Lacroix
Ranger District and Kawishiwi Ranger
District, St. Louis and Lake Counties,
MN, Wait Period Ends: 03/23/2009,
Contact: Carol Booth, 218–666–0020.
EIS No. 20090038, Draft EIS, COE, CA,
PROGRAMMATIC—Los Angeles
Regional Dredge Material
Management Plan, Develop a LongTerm Strategy for Managing Dredged
Sediment for all Harbors within the
Region, City of Long Beach and
County of Los Angeles, CA, Comment
Period Ends: 04/13/2009, Contact:
Larry Smith, 213–452–3846.
EIS No. 20090039, Draft EIS, AFS, SD,
Telegraph Project Area, Proposes to
Implement Multiple Resource
Management Actions, Northern Hills
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
Ranger District, Black Hills National
Forest, Lawrence and Pennington
Counties, SD, Comment Period Ends:
04/06/2009, Contact: Chris Stores,
605–642–4622.
EIS No. 20090040, Draft EIS, COE, CA,
Natomas Levee Improvement Program
Phase 3 Landslides Improvements
Project, Issuing of 408 Permission and
404 Permit, Central Valley Flood
Control Board, Sutter and Sacramento
Counties, CA, Comment Period Ends:
04/06/2009, Contact: Liz Holland,
916–557–6763.
EIS No. 20090041, Final EIS, TVA, TN,
Watts Bar Reservoir Land
Management Plan, Amend and
Update the 2005 Plan, Guide Land
Use Approvals, Private Water Use
Facility, and Resource Management
Decisions, Loudon, Meigs, Rhea and
Roane Counties, TN, Wait Period
Ends: 03/23/2009, Contact: Richard L.
Toennisson, 865–632–8517.
EIS No. 20090042, Final EIS, AFS, MT,
Beaverhead-Deerlodge National Forest
Land and Resource Management Plan,
Implementation, Beaverhead, ButteSilver Bow, Deerlodge, Granite,
Jefferson, and Madison Counties, MT,
Wait Period Ends: 03/23/2009,
Contact: Leaf Magnuson, 406–683–
3950.
EIS No. 20090043, Revised Draft EIS,
AFS, CA, Moonlight and Wheeler
Fires Recovery and Restoration
Project, Analysis of the No-Action and
Action Alternatives, Mt. Hough
Ranger District, Plumas National
Forest, Plumas County, CA, Comment
Period Ends: 04/06/2009, Contact:
Rich Bednarski, 530–283–7641.
EIS No. 20090044, Draft EIS, IBR, CO,
Aspinall Unit Operations—Colorado
River Storage Project, Modifying
Water Flow Operations,
Implementation, Gunnison River,
Gunnison, Montrose, Delta, and Mesa
Counties, CO, Comment Period Ends:
04/24/2009, Contact: Steve McCall,
970–248–0638.
EIS No. 20090045, Draft EIS, USN, 00,
West Coast Basing of the MV–22,
Determining Basing Location(s) and
Providing Efficient Training
Operations, CA, AZ, Comment Period
Ends: 04/06/2009, Contact: Doug
Gilkey, 619–532–3348.
Amended Notices
EIS No. 20090018, Draft EIS, AFS, ID,
Lakeview-Reeder Fuels Reduction
Project, Proposed Fuels Reduction
and Road Treatment Activities, Idaho
Panhandle National Forests, Priest
Lake Ranger District, Bonner County,
ID, Comment Period Ends: 03/30/
2009, Contact: David Cobb, 208–443–
2512.
E:\FR\FM\20FEN1.SGM
20FEN1
Agencies
[Federal Register Volume 74, Number 33 (Friday, February 20, 2009)]
[Notices]
[Pages 7889-7890]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-3661]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8590-7]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7146.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 6, 2008 (73 FR
19833).
Draft EISs
EIS No. 20080072, ERP No. D-IBR-J39038-C0, Southern Delivery System
Project, Water Supply Development, Execution of up to 40-year Contracts
for Use of Fryingpan-Arkansas Project Facilities, Special Use Permit,
El Paso County, CO.
Summary: EPA raised environmental concerns about potential impacts
to water quality, including the potential to exacerbate existing water
quality impairments to water bodies within the Arkansas River Basin and
the lack of mitigation for these impacts. EPA also raised concerns over
the potential for increased flooding and erosion due to return flows
into Fountain Creek. EPA strongly encouraged Reclamation to include
mitigation commitments to offset the water quality impacts in the Final
EIS and Record of Decision. Rating EC2.
EIS No. 20080333, ERP No. D-IBR-J39040-CO, Windy Gap Firming Project,
Construct a New Water Storage Reservoir to Deliver Water to Front Range
and West Slope Communities and Industries, Funding, NPDES and U.S. Army
COE Section 404 Permit, Grand and Larimer Counties, CO.
Summary: EPA expressed environmental objections to this proposal
because of the potential for the project to worsen water quality in
already impaired waters without the assurance of adequate mitigation.
EPA also requested additional information regarding impacts to water
quality and stream morphology. Rating EO2.
EIS No. 20080343, ERP No. D-FRC-L03014-OR, Jordan Cove Energy and
Pacific Connector Gas Pipeline Project, Construction and Operation,
Liquefied Natural Gas (LNG) Import
[[Page 7890]]
Terminal and Natural Gas Pipeline Facilities, Coos, Douglas, Jackson
and Klamath Counties, OR.
Summary: EPA expressed environmental concerns about potential
degradation of in-bay resources associated with the preferred
alternative pipeline route identified in the DEIS and the level of
analysis devoted to key resources. Rating EO2.
EIS No. 20080386, ERP No. D-COE-K39116-CA, SanPedro Waterfront Project,
Proposed Specific Development Project and Associated Infrastructure
Improvements on Approximately 400 Acres, Currently Operated by Los
Angeles Harbor Department (LAHD), Located along the West Side of Los
Angeles Harbor's Main Channel, from the Vincent Thomas Bridge to
Cabrillo Beach, U.S. Army Section 10 and 404 and Section 103 Marine
Protection, Research, and Sanctuaries Act Permits, (MPRSA) City of Los
Angeles, CA.
Summary: EPA expressed environmental concerns about significant and
unavoidable impacts to air quality and environmental justice
communities, and planned ocean disposal of sediments. EPA recommended
commitments to conduct an already planned port-wide health risk
assessment, coordination with the environmental justice community to
identify additional measures to offset health impacts, implementation
of a port-wide health impacts assessment to inform mitigation, and
identification of beneficial reuse opportunities for sediment. Rating
EC2.
EIS No. 20080461, ERP No. D-FRC-B03007-00, Hubline/East to West
Project, Proposes to Modify its Existing Natural Gas Transmission
Pipeline System in MA, CT, RI and NJ.
Summary: EPA does not object to the proposed project. Rating LO.
EIS No. 20080462, ERP No. D-FRC-K03031-CA, South Feather Power Project,
(Project No. 2088-068), Application to Relicense its 104-megawatt,
South Fork Feather River, Lost Creek and Slate Creek, Butte, Yuba and
Plumas Counties, CA.
Summary: EPA expressed environmental concerns about water quality
and construction impacts, and requested additional information on the
impacts of climate change on the project and the analysis of cumulative
impacts. Rating EC2.
Dated: February 17, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-3661 Filed 2-19-09; 8:45 am]
BILLING CODE 6560-50-P