Midcontinent Express Pipeline LLC; Notice of Application, 7682 [E9-3450]

Download as PDF 7682 Federal Register / Vol. 74, No. 32 / Thursday, February 19, 2009 / Notices application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. Kimberly D. Bose, Secretary. [FR Doc. E9–3447 Filed 2–18–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09–56–000] Midcontinent Express Pipeline LLC; Notice of Application sroberts on PROD1PC70 with NOTICES February 11, 2009. Take notice that on January 29, 2009, Midcontinent Express Pipeline LLC (Midcontinent) 3250 Lacey Road, Suite 700, Downers Grove, Illinois 60515, filed an application in Docket No. CP09–56–000, pursuant to section 7(c) of the Natural Gas Act (NGA) and Part 157 of the Commission’s regulations, requesting a certificate of public convenience and necessity to construct and operate facilities to expand the capacity of its system in Zone 1 by 300,000 Dth per day. Specifically, Midcontinent proposes to increase compression at three certificated compressor stations: (1) Lamar Compressor Station in Lamar County, Texas—one new 6,135 horsepower (hp) unit; (2) Atlanta Compressor Station in Cass County, Texas—two new units totaling 16,360 hp and an increase the certificated level of operation of two compressor units requested in Docket No. CP08–6–002 by a total of 4,090 hp; and (3) Vicksburg Compressor Station in Hinds County, Mississippi—one new 6,135 hp unit. In addition, Midcontinent proposes to add a new inlet filter/ separator at its certificated Perryville VerDate Nov<24>2008 17:38 Feb 18, 2009 Jkt 217001 Compressor Station in Union Parish, Louisiana. Midcontinent requests a determination that rolled-in rate treatment is appropriate for the proposed facilities. Any questions regarding this application should be directed to Bruce H. Newsome, Vice President, Midcontinent Express Pipeline LLC, 3250 Lacey Road, Suite 700, Downers Grove, Illinois 60515, telephone no. (630) 725–3070, and e-mail: bruce_newsome@kindermorgan.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: March 4, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–3450 Filed 2–18–09; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\19FEN1.SGM 19FEN1

Agencies

[Federal Register Volume 74, Number 32 (Thursday, February 19, 2009)]
[Notices]
[Page 7682]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-3450]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP09-56-000]


Midcontinent Express Pipeline LLC; Notice of Application

February 11, 2009.
    Take notice that on January 29, 2009, Midcontinent Express Pipeline 
LLC (Midcontinent) 3250 Lacey Road, Suite 700, Downers Grove, Illinois 
60515, filed an application in Docket No. CP09-56-000, pursuant to 
section 7(c) of the Natural Gas Act (NGA) and Part 157 of the 
Commission's regulations, requesting a certificate of public 
convenience and necessity to construct and operate facilities to expand 
the capacity of its system in Zone 1 by 300,000 Dth per day. 
Specifically, Midcontinent proposes to increase compression at three 
certificated compressor stations: (1) Lamar Compressor Station in Lamar 
County, Texas--one new 6,135 horsepower (hp) unit; (2) Atlanta 
Compressor Station in Cass County, Texas--two new units totaling 16,360 
hp and an increase the certificated level of operation of two 
compressor units requested in Docket No. CP08-6-002 by a total of 4,090 
hp; and (3) Vicksburg Compressor Station in Hinds County, Mississippi--
one new 6,135 hp unit. In addition, Midcontinent proposes to add a new 
inlet filter/separator at its certificated Perryville Compressor 
Station in Union Parish, Louisiana. Midcontinent requests a 
determination that rolled-in rate treatment is appropriate for the 
proposed facilities.
    Any questions regarding this application should be directed to 
Bruce H. Newsome, Vice President, Midcontinent Express Pipeline LLC, 
3250 Lacey Road, Suite 700, Downers Grove, Illinois 60515, telephone 
no. (630) 725-3070, and e-mail: bruce_newsome@kindermorgan.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either complete 
its environmental assessment (EA) and place it into the Commission's 
public record (eLibrary) for this proceeding; or issue a Notice of 
Schedule for Environmental Review. If a Notice of Schedule for 
Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 14 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: March 4, 2009.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-3450 Filed 2-18-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.