Midcontinent Express Pipeline LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed MEP Amendment Project and Request for Comments on Environmental Issues, 7685-7687 [E9-3449]
Download as PDF
sroberts on PROD1PC70 with NOTICES
Federal Register / Vol. 74, No. 32 / Thursday, February 19, 2009 / Notices
Revised Volume 1, to be effective 3/13/
09.
Filed Date: 02/10/2009.
Accession Number: 20090211–0074.
Comment Date: 5 p.m. Eastern Time
on Monday, February 23, 2009.
Docket Numbers: RP09–357–000.
Applicants: Venice Gathering System,
L.L.C.,
Description: Venice Gathering System,
LLC submits Second Revised Sheet 117
et al. to FERC Gas Tariff, Original
Volume 1, to be effective 3/1/09.
Filed Date: 02/11/2009.
Accession Number: 20090212–0054.
Comment Date: 5 p.m. Eastern Time
on Monday, February 23, 2009.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
VerDate Nov<24>2008
17:38 Feb 18, 2009
Jkt 217001
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–3463 Filed 2–18–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–06–002]
Midcontinent Express Pipeline LLC;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed MEP Amendment Project
and Request for Comments on
Environmental Issues
February 11, 2009.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the MEP Amendment Project (MEP
Amendment) involving construction
and operation of facilities by
Midcontinent Express Pipeline LLC
(MEP) in Cass County, Texas, and Hinds
County, Mississippi.1 This EA will be
used by the Commission in its decisionmaking process to determine whether
the project is in the public convenience
and necessity.
This notice announces the opening of
the scoping process we will use to
gather input from the public and
interested agencies on the project. Your
input will help the Commission staff
determine which issues need to be
evaluated in the EA. Please note that the
scoping period will close on March 13,
2009.
This notice is being sent to affected
landowners; federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. State and local
government representatives are asked to
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
1 On December 30, 2008, MEP filed its amended
application with the Commission under section 7
of the Natural Gas Act and Part 157 of the
Commission’s regulations. The Commission issued
its Notice of Amendment on January 12, 2009.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
7685
If you are a landowner receiving this
notice, you may be contacted by a MEP
representative about survey permission
and/or the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the project is
approved by the Commission, that
approval conveys with it the right of
eminent domain. Therefore, if easement
negotiations fail to produce an
agreement, the natural gas company
could initiate condemnation
proceedings in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (https://
www.ferc.gov). This fact sheet addresses
a number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is
available for viewing on the FERC
Internet Web site (https://www.ferc.gov).
Summary of the Proposed Project
MEP proposes an expansion and
equipment modifications at the
previously certificated Atlanta
Compressor Station in Cass County,
Texas, and relocation of the previously
certificated Vicksburg Compressor
Station to Hinds County, Mississippi.
MEP is proposing to:
• Substitute two G16 compressor
units for the two previously certificated
G12 compressor units at Atlanta
Compressor Station;
• Increase the land parcel size at the
Atlanta Compressor Station from 30.0
acres to 36.7 acres to encompass an
adjacent block valve that was
certificated under Docket CP08–06–000
for the MEP pipeline; and
• Relocate the previously certificated
Vicksburg Compressor Station
approximately 3.5 miles to the east from
Warren County, Mississippi to Hinds
County, Mississippi. The relocation
would involve acquiring a new 74.8 acre
land parcel. No equipment changes are
proposed at the Vicksburg Compressor
Station.
The specific location of the project
facilities is shown in Appendix 1.2
2 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices are available on the Commission’s Web
site at the ‘‘eLibrary’’ link or from the Commission’s
Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502–8371. For
instructions on connecting to eLibrary, refer to the
last page of this notice. Copies of the appendices
were sent to all those receiving this notice in the
mail.
E:\FR\FM\19FEN1.SGM
19FEN1
7686
Federal Register / Vol. 74, No. 32 / Thursday, February 19, 2009 / Notices
If approved, MEP proposes to
commence construction of the proposed
facilities in September 2009.
Land Requirements for Construction
The area that would be temporarily
affected by construction of the Atlanta
Compressor Station would increase over
the previously certificated Project by
10.0 acres to a total of approximately
22.0 acres. The area that would be
permanently affected by operation of the
Atlanta Compressor Station would
increase by 1.4 acres to a total of
approximately 13.1 acres.
Construction of the Vicksburg
Compressor Station would temporarily
impact approximately 31.8 acres.
Permanent land requirements for
operation of the Vicksburg Compressor
Station would impact about
approximately 20.7 acres.
MEP is proposing to locate the
compressor stations adjacent to existing
roadways. MEP is proposing to
construct access roads between the
existing roadways and each area where
the compressor station construction
activity would occur. MEP would retain
a permanent access road for each site
after construction is complete.
sroberts on PROD1PC70 with NOTICES
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, the Commission staff
requests public comments on the scope
of the issues to address in the EA. All
comments received are considered
during the preparation of the EA. State
and local government representatives
are encouraged to notify their
constituents of this proposed action and
encourage them to comment on their
areas of concern.
In the EA we 3 will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils
• Land use
• Water resources, fisheries, and
wetlands
3 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the Office of Energy Projects
(OEP).
VerDate Nov<24>2008
17:38 Feb 18, 2009
Jkt 217001
• Cultural resources
• Vegetation and wildlife
• Air quality and noise
• Endangered and threatened species
• Public safety9
We will also evaluate possible
alternatives to the proposed project or
portions of the proposed project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas.
Our independent analysis of the
issues will be in the EA. Depending on
the comments received during the
scoping process, the EA may be
published and mailed to federal, state,
and local agencies, public interest
groups, interested individuals, affected
landowners, newspapers, libraries, and
the Commission’s official service list for
this proceeding. A comment period will
be allotted for review if the EA is
published. We will consider all
comments on the EA before we make
our recommendations to the
Commission. To ensure your comments
are considered, please carefully follow
the instructions in the public
participation section below.
With this NOI, we are asking federal,
state, and local agencies with
jurisdiction and/or special expertise
with respect to environmental issues to
formally cooperate with us in the
preparation of the EA. These agencies
may choose to participate once they
have evaluated the proposal relative to
their responsibilities. Additional
agencies that would like to request
cooperating agency status should follow
the instructions for filing comments
provided under the Public Participation
section of this NOI.
Currently Identified Environmental
Issues
We have already identified several
issues that we think deserve attention
based on a preliminary review of the
proposed facilities and the
environmental information provided by
MEP. This preliminary list of issues may
be changed based on your comments
and our analysis.
• Disturbance caused by project
construction may contribute to water
and wind erosion of soils.
• Disturbance caused by the project
may cause temporary and permanent
alteration of wildlife habitat.
• Potential impacts on air quality and
potential noise emissions may occur.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the MEP
Amendment Project. Your comments
should focus on the potential
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please send in your comments
so that they will be received in
Washington, DC on or before March 13,
2009.
For your convenience, there are three
methods in which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP08–06–002) with
your submission. The Commission
encourages electronic filing of
comments and has dedicated eFiling
expert staff available to assist you at
202–502–8258 or efiling@ferc.gov.
(1) You may file your comments
electronically by using the Quick
Comment feature, which is located on
the Commission’s internet Web site at
https://www.ferc.gov under the link to
Documents and Filings. A Quick
Comment is an easy method for
interested persons to submit text-only
comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s internet Web site at
https://www.ferc.gov under the link to
Documents and Filings. eFiling involves
preparing your submission in the same
manner as you would if filing on paper,
and then saving the file on your
computer’s hard drive. You will attach
that file as your submission. New
eFiling users must first create an
account by clicking on ‘‘Sign up’’ or
‘‘eRegister.’’ You will be asked to select
the type of filing you are making. A
comment on a particular project is
considered a ‘‘Comment on a Filing;’’ or
(3) You may file your comments via
mail to the Commission by sending an
original and two copies of your letter to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC
20426.
Label one copy of the comments for
the attention of Gas Branch 3, PJ11.3.
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within distances
defined in the Commission’s regulations
of certain aboveground facilities.
E:\FR\FM\19FEN1.SGM
19FEN1
Federal Register / Vol. 74, No. 32 / Thursday, February 19, 2009 / Notices
If you do not want to send comments
at this time but still want to remain on
our mailing list, please return the
Information Request (Appendix 2). If
you do not return the Information
Request, you will be taken off the
mailing list.
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor,’’ which is an
official party to the proceeding.
Intervenors play a more formal role in
the process and are able to file briefs,
appear at hearings, and be heard by the
courts if they choose to appeal the
Commission’s final ruling. An
intervenor formally participates in a
Commission proceeding by filing a
request to intervene. Instructions for
becoming an intervenor are included in
the User’s Guide under the ‘‘e-filing’’
link on the Commission’s Web site.
sroberts on PROD1PC70 with NOTICES
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits,
if applicable, will be posted on the
Commission’s calendar located at
https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–3449 Filed 2–18–09; 8:45 am]
BILLING CODE 6717–01–P
VerDate Nov<24>2008
17:38 Feb 18, 2009
Jkt 217001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP04–36–005]
Weaver’s Cove Energy, LLC; Notice of
Filing
February 11, 2009.
Take notice that on January 30, 2009,
Weaver’s Cove Energy, LLC (Weaver’s
Cove) filed an application, pursuant to
Section 3 of the Natural Gas Act (NGA)
and Parts 153 and 380 of the
Commission’s Rules and Regulations, to
amend its certificate issued on July 15,
2005 in Docket No. CP04–36–000.
Weaver’s Cove requests authority to site,
construct, and operate an offshore berth
for receiving and unloading LNG for the
approved LNG terminal, in Mount Hope
Bay in Massachusetts waters. The
application is on file with the
Commission and open for public
inspection. This filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Weaver’s Cove proposes to construct,
and operate: (1) An offshore berth for
receiving and unloading LNG tankers in
Mount Hope Bay in Massachusetts
waters, (2) an LNG transfer system with
buried submarine LNG transfer lines
incorporating insulated ‘‘pipe-in-pipe’’
technology (PiP) to transfer LNG from
the offshore berth to the LNG storage
tank at the certificated terminal in Fall
River, Massachusetts, and (3) associated
minor piping and equipment changes at
the terminal to accommodate the PiP
transfer system. The proposed offshore
berth is located approximately four
miles from the certificated LNG
terminal. The proposed location is
approximately one mile from the nearest
shoreline and two miles south of the
Braga Bridge. Weaver’s Cove proposes to
begin construction in June 2011 and
meet an in-service date in December
2014.
Any questions regarding the
application are to be directed to Marcia
MacClary, Weaver’s Cove Energy, LLC,
One New Street, Fall River, MA 02720,
(508) 675–9470, or Bruce Kiely, Baker
Botts L.L.P., 1299 Pennsylvania Ave.,
NW., Washington, DC 20004, (202) 639–
7711.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
7687
On April 29, 2008, the Commission
staff granted Weaver’s Cove’s request to
use the National Environmental Policy
Act (NEPA) Pre-Filing Process and
assigned Docket No. PF08–18–000 to
staff activities involving the offshore
berth project. Now, as of the filing of
this application on January 30, 2009, the
NEPA Pre-Filing Process for this project
has ended. From this time forward, this
proceeding will be conducted in Docket
No. CP04–36–005, as noted in the
caption of this Notice.
Any person wishing to obtain legal
status by becoming a party to the
proceedings for this project should, on
or before the below listed comment
date, file with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, a
motion to intervene in accordance with
the requirements of the Commission’s
Rules of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
Persons may also wish to comment
further only on the environmental
review of this project. Environmental
commenters will be placed on the
Commission’s environmental mailing
list, will receive copies of
environmental documents issued by the
Commission, and will be notified of
meetings associated with the
Commission’s environmental review
process. Those persons, organizations,
and agencies who submitted comments
during the NEPA Pre-Filing Process in
Docket No. PF08–18–000 are already on
the Commission staff’s environmental
mailing list for the proceeding in the
above dockets and may file additional
comments on or before the below listed
comment date. Environmental
commenters will not be required to
serve copies of filed documents on all
other parties. However, environmental
commenters are also not parties to the
proceeding and will not receive copies
of all documents filed by other parties
or non-environmental documents issued
by the Commission. Further, they will
not have the right to seek court review
of any final order by Commission in this
proceeding.
Motions to intervene, protests and
comments may be filed electronically
E:\FR\FM\19FEN1.SGM
19FEN1
Agencies
[Federal Register Volume 74, Number 32 (Thursday, February 19, 2009)]
[Notices]
[Pages 7685-7687]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-3449]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-06-002]
Midcontinent Express Pipeline LLC; Notice of Intent To Prepare an
Environmental Assessment for the Proposed MEP Amendment Project and
Request for Comments on Environmental Issues
February 11, 2009.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the MEP Amendment Project (MEP
Amendment) involving construction and operation of facilities by
Midcontinent Express Pipeline LLC (MEP) in Cass County, Texas, and
Hinds County, Mississippi.\1\ This EA will be used by the Commission in
its decision-making process to determine whether the project is in the
public convenience and necessity.
---------------------------------------------------------------------------
\1\ On December 30, 2008, MEP filed its amended application with
the Commission under section 7 of the Natural Gas Act and Part 157
of the Commission's regulations. The Commission issued its Notice of
Amendment on January 12, 2009.
---------------------------------------------------------------------------
This notice announces the opening of the scoping process we will
use to gather input from the public and interested agencies on the
project. Your input will help the Commission staff determine which
issues need to be evaluated in the EA. Please note that the scoping
period will close on March 13, 2009.
This notice is being sent to affected landowners; federal, state,
and local government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. State and local
government representatives are asked to notify their constituents of
this planned project and encourage them to comment on their areas of
concern.
If you are a landowner receiving this notice, you may be contacted
by a MEP representative about survey permission and/or the acquisition
of an easement to construct, operate, and maintain the proposed
facilities. The company would seek to negotiate a mutually acceptable
agreement. However, if the project is approved by the Commission, that
approval conveys with it the right of eminent domain. Therefore, if
easement negotiations fail to produce an agreement, the natural gas
company could initiate condemnation proceedings in accordance with
state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' is available for
viewing on the FERC Web site (https://www.ferc.gov). This fact sheet
addresses a number of typically asked questions, including the use of
eminent domain and how to participate in the Commission's proceedings.
It is available for viewing on the FERC Internet Web site (https://
www.ferc.gov).
Summary of the Proposed Project
MEP proposes an expansion and equipment modifications at the
previously certificated Atlanta Compressor Station in Cass County,
Texas, and relocation of the previously certificated Vicksburg
Compressor Station to Hinds County, Mississippi. MEP is proposing to:
Substitute two G16 compressor units for the two previously
certificated G12 compressor units at Atlanta Compressor Station;
Increase the land parcel size at the Atlanta Compressor
Station from 30.0 acres to 36.7 acres to encompass an adjacent block
valve that was certificated under Docket CP08-06-000 for the MEP
pipeline; and
Relocate the previously certificated Vicksburg Compressor
Station approximately 3.5 miles to the east from Warren County,
Mississippi to Hinds County, Mississippi. The relocation would involve
acquiring a new 74.8 acre land parcel. No equipment changes are
proposed at the Vicksburg Compressor Station.
The specific location of the project facilities is shown in
Appendix 1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices are
available on the Commission's Web site at the ``eLibrary'' link or
from the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
Copies of the appendices were sent to all those receiving this
notice in the mail.
---------------------------------------------------------------------------
[[Page 7686]]
If approved, MEP proposes to commence construction of the proposed
facilities in September 2009.
Land Requirements for Construction
The area that would be temporarily affected by construction of the
Atlanta Compressor Station would increase over the previously
certificated Project by 10.0 acres to a total of approximately 22.0
acres. The area that would be permanently affected by operation of the
Atlanta Compressor Station would increase by 1.4 acres to a total of
approximately 13.1 acres.
Construction of the Vicksburg Compressor Station would temporarily
impact approximately 31.8 acres. Permanent land requirements for
operation of the Vicksburg Compressor Station would impact about
approximately 20.7 acres.
MEP is proposing to locate the compressor stations adjacent to
existing roadways. MEP is proposing to construct access roads between
the existing roadways and each area where the compressor station
construction activity would occur. MEP would retain a permanent access
road for each site after construction is complete.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
This process is referred to as ``scoping.'' The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this Notice of Intent, the Commission staff
requests public comments on the scope of the issues to address in the
EA. All comments received are considered during the preparation of the
EA. State and local government representatives are encouraged to notify
their constituents of this proposed action and encourage them to
comment on their areas of concern.
In the EA we \3\ will discuss impacts that could occur as a result
of the construction and operation of the proposed project under these
general headings:
---------------------------------------------------------------------------
\3\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------
Geology and soils
Land use
Water resources, fisheries, and wetlands
Cultural resources
Vegetation and wildlife
Air quality and noise
Endangered and threatened species
Public safety9
We will also evaluate possible alternatives to the proposed project
or portions of the proposed project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission. To ensure your comments are
considered, please carefully follow the instructions in the public
participation section below.
With this NOI, we are asking federal, state, and local agencies
with jurisdiction and/or special expertise with respect to
environmental issues to formally cooperate with us in the preparation
of the EA. These agencies may choose to participate once they have
evaluated the proposal relative to their responsibilities. Additional
agencies that would like to request cooperating agency status should
follow the instructions for filing comments provided under the Public
Participation section of this NOI.
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by MEP. This preliminary list of
issues may be changed based on your comments and our analysis.
Disturbance caused by project construction may contribute
to water and wind erosion of soils.
Disturbance caused by the project may cause temporary and
permanent alteration of wildlife habitat.
Potential impacts on air quality and potential noise
emissions may occur.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the MEP Amendment Project. Your comments
should focus on the potential environmental effects, reasonable
alternatives, and measures to avoid or lessen environmental impacts.
The more specific your comments, the more useful they will be. To
ensure that your comments are timely and properly recorded, please send
in your comments so that they will be received in Washington, DC on or
before March 13, 2009.
For your convenience, there are three methods in which you can use
to submit your comments to the Commission. In all instances please
reference the project docket number (CP08-06-002) with your submission.
The Commission encourages electronic filing of comments and has
dedicated eFiling expert staff available to assist you at 202-502-8258
or efiling@ferc.gov.
(1) You may file your comments electronically by using the Quick
Comment feature, which is located on the Commission's internet Web site
at https://www.ferc.gov under the link to Documents and Filings. A Quick
Comment is an easy method for interested persons to submit text-only
comments on a project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's internet Web site at
https://www.ferc.gov under the link to Documents and Filings. eFiling
involves preparing your submission in the same manner as you would if
filing on paper, and then saving the file on your computer's hard
drive. You will attach that file as your submission. New eFiling users
must first create an account by clicking on ``Sign up'' or
``eRegister.'' You will be asked to select the type of filing you are
making. A comment on a particular project is considered a ``Comment on
a Filing;'' or
(3) You may file your comments via mail to the Commission by
sending an original and two copies of your letter to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First St., NE., Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of Gas Branch 3,
PJ11.3.
Environmental Mailing List
An effort is being made to send this notice to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project. This includes all landowners who are
potential right-of-way grantors, whose property may be used temporarily
for project purposes, or who own homes within distances defined in the
Commission's regulations of certain aboveground facilities.
[[Page 7687]]
If you do not want to send comments at this time but still want to
remain on our mailing list, please return the Information Request
(Appendix 2). If you do not return the Information Request, you will be
taken off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor,'' which is an official party to the
proceeding. Intervenors play a more formal role in the process and are
able to file briefs, appear at hearings, and be heard by the courts if
they choose to appeal the Commission's final ruling. An intervenor
formally participates in a Commission proceeding by filing a request to
intervene. Instructions for becoming an intervenor are included in the
User's Guide under the ``e-filing'' link on the Commission's Web site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (https://www.ferc.gov) using the eLibrary link.
Click on the eLibrary link, click on ``General Search'' and enter the
docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits, if applicable, will be
posted on the Commission's calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-3449 Filed 2-18-09; 8:45 am]
BILLING CODE 6717-01-P