Rockies Express Pipeline LLC; Notice of Technical Conference, 7427 [E9-3344]
Download as PDF
Federal Register / Vol. 74, No. 30 / Tuesday, February 17, 2009 / Notices
Corporation filed a Petition For
Approval of 15 Reliability Standards
that contain changes to the previous
version filed with the Commission, and
to make the revised Reliability
Standards effective immediately.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on February 26, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–3339 Filed 2–13–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sroberts on PROD1PC70 with NOTICES
[Docket No. EF09–5181–000]
Western Area Power Administration;
Notice of Filing
February 6, 2009.
Take notice that on January 13, 2009,
the Deputy Secretary of the Department
VerDate Nov<24>2008
19:45 Feb 13, 2009
Jkt 217001
of Energy submitted Rate Order No.
WAPA–142, confirmed and approved
on an interim basis, effective on
February 1, 2009 Rate Schedule L–F8,
for firm electric service from the
Loveland Area Projects. The ratesetting
Power Repayment Studies for the PickSloan Missouri Basin Program and the
Fryingpan-Arkansas Project contain the
data upon which Rate Order No.
WAPA–142 is based and under the
authority vested in the Federal Energy
Regulatory Commission by Delegation
Order No. 00–037.00, Rate Schedule L–
F8 is submitted for confirmation and
approved on a final basis effective
February 1, 2009, and ending December
31, 2013.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 pm Eastern Time on
March 2, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–3224 Filed 2–13–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
7427
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–208–000]
Rockies Express Pipeline LLC; Notice
of Technical Conference
February 10, 2009.
On February 17, 2009, staff of the
Office of Energy Projects (OEP) will
hold a technical conference for the REX
East Project. Rockies Express Pipeline
LLC requested the Technical Conference
to discuss compliance with
Environmental Condition 147 of the
Commission’s May 30, 2008 Order.1
The technical conference will be held
on Tuesday, February 17, 2009, at 1:00
p.m. (EDT) in Room 3M–2A&B at the
Commission Headquarters, 888 1st
Street, NE., Washington, DC.
Information concerning any changes
to the above may be obtained from the
Commission’s Office of External Affairs
at (202) 502–8004 or toll free at 1–866–
208–FERC (208–3372).
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations please
send an e-mail to accessibility@ferc.gov
or call toll free 866–208–3372 (voice) or
(202) 208–8659 (TTY), or send a FAX to
(202) 208–2106 with the required
accommodations.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–3344 Filed 2–13–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR09–11–000]
Crosstex Mississippi Pipeline, L.P.;
Notice of Petition for Approval of Rates
February 9, 2009.
Take notice that on February 2, 2009,
Crosstex Mississippi Pipeline, L.P.
(CMP) filed a petition for approval of
rates pursuant to section 284.123(b)(2)
of the Commission’s regulations. CMP
requests approval of a decrease in its
maximum system-wide rate for the
interruptible transportation of natural
gas from $0.2927 per MMBtu to $0.2495
per MMBtu, effective February 1, 2009.
In addition, CMP states that it proposes
to retain the actual amount of gas used,
1 Rockies Express Pipeline LLC, 123 FERC
¶ 61,234 (2008)
E:\FR\FM\17FEN1.SGM
17FEN1
Agencies
[Federal Register Volume 74, Number 30 (Tuesday, February 17, 2009)]
[Notices]
[Page 7427]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-3344]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP07-208-000]
Rockies Express Pipeline LLC; Notice of Technical Conference
February 10, 2009.
On February 17, 2009, staff of the Office of Energy Projects (OEP)
will hold a technical conference for the REX East Project. Rockies
Express Pipeline LLC requested the Technical Conference to discuss
compliance with Environmental Condition 147 of the Commission's May 30,
2008 Order.\1\
---------------------------------------------------------------------------
\1\ Rockies Express Pipeline LLC, 123 FERC ] 61,234 (2008)
---------------------------------------------------------------------------
The technical conference will be held on Tuesday, February 17,
2009, at 1:00 p.m. (EDT) in Room 3M-2A&B at the Commission
Headquarters, 888 1st Street, NE., Washington, DC.
Information concerning any changes to the above may be obtained
from the Commission's Office of External Affairs at (202) 502-8004 or
toll free at 1-866-208-FERC (208-3372).
Commission conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations please
send an e-mail to accessibility@ferc.gov or call toll free 866-208-3372
(voice) or (202) 208-8659 (TTY), or send a FAX to (202) 208-2106 with
the required accommodations.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-3344 Filed 2-13-09; 8:45 am]
BILLING CODE 6717-01-P