Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NSPS for Lime Manufacturing (Renewal), EPA ICR Number 1167.09, OMB Control Number 2060-0063, 7430-7431 [E9-3269]
Download as PDF
sroberts on PROD1PC70 with NOTICES
7430
Federal Register / Vol. 74, No. 30 / Tuesday, February 17, 2009 / Notices
EPA has established a public docket
for this ICR under Docket ID No. EPA–
HQ–OARM–2008–0828, which is
available for online viewing at
www.regulations.gov, or in person
viewing at the EPA Docket Center (EPA/
DC), EPA West, Room 3334, 1301
Constitution Ave., NW., Washington,
DC. The EPA/DC Public Reading Room
is open from 8 a.m. to 4:30 p.m.,
Monday through Friday, excluding legal
holidays. The telephone number for the
Reading Room is 202–566–1744, and the
telephone number for the OEI Docket is
(202) 566–1752.
Use EPA’s electronic docket and
comment system at
www.regulations.gov, to submit or view
public comments, access the index
listing of the contents of the docket, and
to access those documents in the docket
that are available electronically. Once in
the system, select ‘‘docket search,’’ then
key in the docket ID number identified
above. Please note that EPA’s policy is
that public comments, whether
submitted electronically or in paper,
will be made available for public
viewing at www.regulations.gov as EPA
receives them and without change,
unless the comment contains
copyrighted material, confidential
business information (CBI), or other
information whose public disclosure is
restricted by statute. For further
information about the electronic docket,
go to www.regulations.gov.
Title: Background Checks for
Contractor Employees (Renewal).
ICR numbers: EPA ICR No. 2159.03,
OMB Control No. 2030–0043.
ICR Status: This ICR is scheduled to
expire on March 31, 2009. Under OMB
regulations, the Agency may continue to
conduct or sponsor the collection of
information while this submission is
pending at OMB. An Agency may not
conduct or sponsor, and a person is not
required to respond to, a collection of
information, unless it displays a
currently valid OMB control number.
The OMB control numbers for EPA’s
regulations in title 40 of the CFR, after
appearing in the Federal Register when
approved, are listed in 40 CFR part 9,
are displayed either by publication in
the Federal Register or by other
appropriate means, such as on the
related collection instrument or form, if
applicable. The display of OMB control
numbers in certain EPA regulations is
consolidated in 40 CFR part 9.
Abstract: EPA uses contractors to
perform services throughout the nation
with regard to environmental
emergencies involving the release, or
threatened release, of oil, radioactive
materials or hazardous chemicals that
may potentially affect communities and
VerDate Nov<24>2008
19:45 Feb 13, 2009
Jkt 217001
the surrounding environment. Releases
may be accidental, deliberate, or may be
caused by natural disasters. Emergency
responders are available 24 hours-a-day
to an incident, and respond with
necessary personnel and equipment to
eliminate dangers to the public and
environment. Contractors responding to
any of these types of incidents are
responsible for conducting background
checks and applying Governmentestablished suitability criteria in
determining whether employees are
acceptable to perform on given sites or
on specific projects prior to contract
employee performance. The information
to be collected under the ICR for
Background Checks for Contractor
Employees covers citizenship or valid
visa, criminal convictions, weapons
offenses, felony convictions, parties
prohibited from receiving federal
contracts. The Contractor shall maintain
records of all background checks. The
collection of information is required to
obtain or retain a contract with work of
this nature (Title 5, CFR parts 731, 732,
and 736).
Burden Statement: The annual public
reporting and recordkeeping burden for
this collection of information is
estimated to average 0.55 minutes per
response. Burden means the total time,
effort, or financial resources expended
by persons to generate, maintain, retain,
or disclose or provide information to or
for a Federal agency. This includes the
time needed to review instructions;
develop, acquire, install, and utilize
technology and systems for the purposes
of collecting, validating, and verifying
information, processing and
maintaining information, and disclosing
and providing information; adjust the
existing ways to comply with any
previously applicable instructions and
requirements which have subsequently
changed; train personnel to be able to
respond to a collection of information;
search data sources; complete and
review the collection of information;
and transmit or otherwise disclose the
information.
Respondents/Affected Entities:
Entities affected by this action are
contractors involved with Emergency
Response that have significant security
concerns, as determined by the
Contracting Officer on a case-by-case
basis, to provide qualified personnel
that meet the background check
requirements developed by EPA.
Estimated Number of Respondents:
1000 per year.
Frequency of Response: On occasion.
Estimated Total Annual Hour Burden:
550.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
Estimated Total Annual Cost:
$81,410, includes $0 annualized capital
or O&M costs.
Changes in the Estimates: There is a
decrease of 450 hours in the total
estimated burden currently identified in
the OMB Inventory of Approved ICR
Burdens. This decrease is due to just
adjustments to the estimates.
Dated: February 9, 2009.
John Moses,
Acting Director, Collection Strategies
Division.
[FR Doc. E9–3268 Filed 2–13–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2008–0363; FRL–8773–9]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; NSPS for Lime Manufacturing
(Renewal), EPA ICR Number 1167.09,
OMB Control Number 2060–0063
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice.
SUMMARY: In compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.), this document announces
that an Information Collection Request
(ICR) has been forwarded to the Office
of Management and Budget (OMB) for
review and approval. This is a request
to renew an existing approved
collection. The ICR which is abstracted
below describes the nature of the
collection and the estimated burden and
cost.
DATES: Additional comments may be
submitted on or before March 19, 2009.
ADDRESSES: Submit your comments,
referencing docket ID number EPAOECA–2008–0363, to (1) EPA online
using www.regulations.gov (our
preferred method), or by e-mail to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center (EPA/DC), Environmental
Protection Agency, Enforcement and
Compliance Docket and Information
Center, mail code 2201T, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460, and (2) OMB at:
Office of Information and Regulatory
Affairs, Office of Management and
Budget (OMB), Attention: Desk Officer
for EPA, 725 17th Street, NW.,
Washington, DC 20503.
FOR FURTHER INFORMATION CONTACT:
Sounjay Gairola, Office of Enforcement
and Compliance Assurance,
Environmental Protection Agency, 1200
Pennsylvania Avenue, NW.,
E:\FR\FM\17FEN1.SGM
17FEN1
sroberts on PROD1PC70 with NOTICES
Federal Register / Vol. 74, No. 30 / Tuesday, February 17, 2009 / Notices
Washington, DC 20460; telephone
number: (202) 564–4003; e-mail
address: gairola.sounjay@epa.gov.
SUPPLEMENTARY INFORMATION: EPA has
submitted the following ICR to OMB for
review and approval according to the
procedures prescribed in 5 CFR 1320.12.
On May 30, 2008 (73 FR 31088), EPA
sought comments on this ICR pursuant
to 5 CFR 1320.8(d). EPA received no
comments. Any additional comments on
this ICR should be submitted to EPA
and OMB within 30 days of this notice.
EPA has established a public docket
for this ICR under docket ID number
EPA–HQ–OECA–2008–0363, which is
available for public viewing online at
https://www.regulations.gov, or in person
viewing at the Enforcement and
Compliance Docket in the EPA Docket
Center (EPA/DC), EPA West, Room
3334, 1301 Constitution Avenue, NW.,
Washington, DC. The EPA Docket
Center Public Reading Room is open
from 8:30 a.m. to 4:30 p.m., Monday
through Friday, excluding legal
holidays. The telephone number for the
Reading Room is (202) 566–1744, and
the telephone number for the
Enforcement and Compliance Docket is
(202) 566–1927.
Use EPA’s electronic docket and
comment system at https://
www.regulations.gov, to submit or view
public comments, access the index
listing of the contents of the docket, and
to access those documents in the docket
that are available electronically. Once in
the system, select ‘‘docket search,’’ then
key in the docket ID number identified
above. Please note that EPA’s policy is
that public comments, whether
submitted electronically or in paper,
will be made available for public
viewing at https://www.regulations.gov,
as EPA receives them and without
change, unless the comment contains
copyrighted material, Confidential
Business Information (CB)I, or other
information whose public disclosure is
restricted by statute. For further
information about the electronic docket,
go to www.regulations.gov.
Title: NSPS for Lime Manufacturing
(Renewal).
ICR Numbers: EPA ICR Number
1167.09, OMB Control Number 2060–
0063.
ICR Status: This ICR is scheduled to
expire on April 30, 2009. Under OMB
regulations, the Agency may continue to
conduct or sponsor the collection of
information while this submission is
pending at OMB. An Agency may not
conduct or sponsor, and a person is not
required to respond to, a collection of
information unless it displays a
currently valid OMB control number.
VerDate Nov<24>2008
19:45 Feb 13, 2009
Jkt 217001
The OMB control numbers for EPA’s
regulations in title 40 of the CFR, after
appearing in the Federal Register when
approved, are listed in 40 CFR part 9,
and displayed either by publication in
the Federal Register or by other
appropriate means, such as on the
related collection instrument or form, if
applicable. The display of OMB control
numbers in certain EPA regulations is
consolidated in 40 CFR part 9.
Abstract: The New Source
Performance Standards (NSPS) for Lime
Manufacturing (40 CFR Part 60, Subpart
HH) were proposed on May 3, 1977,
promulgated on April 26, 1984, and
amended on October 17, 2000. The
affected entities are subject to the
General Provisions of the NSPS at 40
CFR part 60, subpart A and any changes,
or additions to the General Provisions
specified at 40 CFR part 60, subpart HH.
Owners or operators of the affected
facilities must make an initial
notification, performance tests, periodic
reports, and maintain records of the
occurrence and duration of any startup,
shutdown, or malfunction in the
operation of an affected facility, or any
period during which the monitoring
system is inoperative. Reports, at a
minimum, are required semiannually.
Burden Statement: The annual public
reporting and recordkeeping burden for
this collection of information is
estimated to average 46 hours per
response. Burden means the total time,
effort, or financial resources expended
by persons to generate, maintain, retain,
or disclose or provide information to or
for a Federal agency. This includes the
time needed to review instructions;
develop, acquire, install, and utilize
technology and systems for the purposes
of collecting, validating, and verifying
information, processing and
maintaining information, and disclosing
and providing information; adjust the
existing ways to comply with any
previously applicable instructions and
requirements which have subsequently
changed; train personnel to be able to
respond to a collection of information;
search data sources; complete and
review the collection of information;
and transmit or otherwise disclose the
information.
Respondents/Affected Entities: Lime
production facilities.
Estimated Number of Respondents:
41.
Frequency of Response: Initially,
occasionally, and semiannually.
Estimated Total Annual Hour Burden:
3,773.
Estimated Total Annual Cost:
$366,056: which includes $304,556 in
Labor costs, $61,500 in O&M costs, and
no annualized capital/startup costs.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
7431
Changes in the Estimates: There is no
change in the total estimated burden
currently identified in the OMB
Inventory of Approved ICR Burdens.
Apparent differences of less than $500
are attributable to rounding; in previous
years, O&M costs were rounded to the
nearest thousand; this ICR presents
more exact figures.
Dated: February 10, 2009.
John Moses,
Acting-Director, Collection Strategies
Division.
[FR Doc. E9–3269 Filed 2–13–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2008–0376; FRL–8773–8]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; NSPS for Hot Mix Asphalt
Facilities (Renewal), EPA ICR Number
1127.09, OMB Control Number 2060–
0083
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice.
SUMMARY: In compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.), this document announces
that an Information Collection Request
(ICR) has been forwarded to the Office
of Management and Budget (OMB) for
review and approval. This is a request
to renew an existing approved
collection. The ICR which is abstracted
below describes the nature of the
collection and the estimated burden and
cost.
DATES: Additional comments may be
submitted on or before March 19, 2009.
ADDRESSES: Submit your comments,
referencing docket ID number EPA–
OECA–2008–0376, to (1) EPA online
using www.regulations.gov (our
preferred method), or by e-mail to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center (EPA/DC), Environmental
Protection Agency, Enforcement and
Compliance Docket and Information
Center, mail code 2201T, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460; and (2) OMB at:
Office of Information and Regulatory
Affairs, Office of Management and
Budget (OMB), Attention: Desk Officer
for EPA, 725 17th Street, NW.,
Washington, DC 20503.
FOR FURTHER INFORMATION CONTACT:
Sounjay Gairola, Office of Enforcement
and Compliance Assurance,
Environmental Protection Agency, 1200
E:\FR\FM\17FEN1.SGM
17FEN1
Agencies
[Federal Register Volume 74, Number 30 (Tuesday, February 17, 2009)]
[Notices]
[Pages 7430-7431]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-3269]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[EPA-HQ-OECA-2008-0363; FRL-8773-9]
Agency Information Collection Activities; Submission to OMB for
Review and Approval; Comment Request; NSPS for Lime Manufacturing
(Renewal), EPA ICR Number 1167.09, OMB Control Number 2060-0063
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501
et seq.), this document announces that an Information Collection
Request (ICR) has been forwarded to the Office of Management and Budget
(OMB) for review and approval. This is a request to renew an existing
approved collection. The ICR which is abstracted below describes the
nature of the collection and the estimated burden and cost.
DATES: Additional comments may be submitted on or before March 19,
2009.
ADDRESSES: Submit your comments, referencing docket ID number EPA-OECA-
2008-0363, to (1) EPA online using www.regulations.gov (our preferred
method), or by e-mail to docket.oeca@epa.gov, or by mail to: EPA Docket
Center (EPA/DC), Environmental Protection Agency, Enforcement and
Compliance Docket and Information Center, mail code 2201T, 1200
Pennsylvania Avenue, NW., Washington, DC 20460, and (2) OMB at: Office
of Information and Regulatory Affairs, Office of Management and Budget
(OMB), Attention: Desk Officer for EPA, 725 17th Street, NW.,
Washington, DC 20503.
FOR FURTHER INFORMATION CONTACT: Sounjay Gairola, Office of Enforcement
and Compliance Assurance, Environmental Protection Agency, 1200
Pennsylvania Avenue, NW.,
[[Page 7431]]
Washington, DC 20460; telephone number: (202) 564-4003; e-mail address:
gairola.sounjay@epa.gov.
SUPPLEMENTARY INFORMATION: EPA has submitted the following ICR to OMB
for review and approval according to the procedures prescribed in 5 CFR
1320.12. On May 30, 2008 (73 FR 31088), EPA sought comments on this ICR
pursuant to 5 CFR 1320.8(d). EPA received no comments. Any additional
comments on this ICR should be submitted to EPA and OMB within 30 days
of this notice.
EPA has established a public docket for this ICR under docket ID
number EPA-HQ-OECA-2008-0363, which is available for public viewing
online at https://www.regulations.gov, or in person viewing at the
Enforcement and Compliance Docket in the EPA Docket Center (EPA/DC),
EPA West, Room 3334, 1301 Constitution Avenue, NW., Washington, DC. The
EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30
p.m., Monday through Friday, excluding legal holidays. The telephone
number for the Reading Room is (202) 566-1744, and the telephone number
for the Enforcement and Compliance Docket is (202) 566-1927.
Use EPA's electronic docket and comment system at https://
www.regulations.gov, to submit or view public comments, access the
index listing of the contents of the docket, and to access those
documents in the docket that are available electronically. Once in the
system, select ``docket search,'' then key in the docket ID number
identified above. Please note that EPA's policy is that public
comments, whether submitted electronically or in paper, will be made
available for public viewing at https://www.regulations.gov, as EPA
receives them and without change, unless the comment contains
copyrighted material, Confidential Business Information (CB)I, or other
information whose public disclosure is restricted by statute. For
further information about the electronic docket, go to
www.regulations.gov.
Title: NSPS for Lime Manufacturing (Renewal).
ICR Numbers: EPA ICR Number 1167.09, OMB Control Number 2060-0063.
ICR Status: This ICR is scheduled to expire on April 30, 2009.
Under OMB regulations, the Agency may continue to conduct or sponsor
the collection of information while this submission is pending at OMB.
An Agency may not conduct or sponsor, and a person is not required to
respond to, a collection of information unless it displays a currently
valid OMB control number. The OMB control numbers for EPA's regulations
in title 40 of the CFR, after appearing in the Federal Register when
approved, are listed in 40 CFR part 9, and displayed either by
publication in the Federal Register or by other appropriate means, such
as on the related collection instrument or form, if applicable. The
display of OMB control numbers in certain EPA regulations is
consolidated in 40 CFR part 9.
Abstract: The New Source Performance Standards (NSPS) for Lime
Manufacturing (40 CFR Part 60, Subpart HH) were proposed on May 3,
1977, promulgated on April 26, 1984, and amended on October 17, 2000.
The affected entities are subject to the General Provisions of the NSPS
at 40 CFR part 60, subpart A and any changes, or additions to the
General Provisions specified at 40 CFR part 60, subpart HH.
Owners or operators of the affected facilities must make an initial
notification, performance tests, periodic reports, and maintain records
of the occurrence and duration of any startup, shutdown, or malfunction
in the operation of an affected facility, or any period during which
the monitoring system is inoperative. Reports, at a minimum, are
required semiannually.
Burden Statement: The annual public reporting and recordkeeping
burden for this collection of information is estimated to average 46
hours per response. Burden means the total time, effort, or financial
resources expended by persons to generate, maintain, retain, or
disclose or provide information to or for a Federal agency. This
includes the time needed to review instructions; develop, acquire,
install, and utilize technology and systems for the purposes of
collecting, validating, and verifying information, processing and
maintaining information, and disclosing and providing information;
adjust the existing ways to comply with any previously applicable
instructions and requirements which have subsequently changed; train
personnel to be able to respond to a collection of information; search
data sources; complete and review the collection of information; and
transmit or otherwise disclose the information.
Respondents/Affected Entities: Lime production facilities.
Estimated Number of Respondents: 41.
Frequency of Response: Initially, occasionally, and semiannually.
Estimated Total Annual Hour Burden: 3,773.
Estimated Total Annual Cost: $366,056: which includes $304,556 in
Labor costs, $61,500 in O&M costs, and no annualized capital/startup
costs.
Changes in the Estimates: There is no change in the total estimated
burden currently identified in the OMB Inventory of Approved ICR
Burdens. Apparent differences of less than $500 are attributable to
rounding; in previous years, O&M costs were rounded to the nearest
thousand; this ICR presents more exact figures.
Dated: February 10, 2009.
John Moses,
Acting-Director, Collection Strategies Division.
[FR Doc. E9-3269 Filed 2-13-09; 8:45 am]
BILLING CODE 6560-50-P