City of Cortez, CO; Notice of Conduit Exemption Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 7411-7412 [E9-3226]
Download as PDF
sroberts on PROD1PC70 with NOTICES
Federal Register / Vol. 74, No. 30 / Tuesday, February 17, 2009 / Notices
squadrons of CH–46Es and MCAS Camp
Pendleton would lose three existing
squadrons of CH–46Es, along with
associated military personnel.
Operations at Marine Corps Base (MCB)
Camp Pendleton, the Bob Stump
Training Range Complex, Marine Corps
Air Ground Combat Center (MCAGCC),
and various Military Training Routes
(MTRs) are included as part of each
basing alternative. A sixth alternative,
No Action, assumes no aircraft would be
replaced, aircraft operations would
continue at the current level, and no
construction/demolition or personnel
changes related to basing the MV–22
aircraft on the West Coast would occur.
Potential impacts were evaluated in
the DEIS under all alternatives for the
following resources: Airfields and
airspace; land use; socioeconomics;
community facilities and services;
ground traffic and transportation; air
quality; noise; infrastructure and
utilities; cultural resources; hazardous
materials management; topography,
geology and soils; water resources;
biological resources; aesthetics and
visual resources; safety and
environmental health; and
environmental justice.
The preferred alternative would result
in an increase of 48 aircraft and 746
personnel at MCAS Miramar and a
reduction of 18 aircraft and 257
personnel at MCAS Camp Pendleton.
New support facilities at MCAS
Miramar include three new hangar
modules, parking apron, four new
fueling pits, and five new wash racks.
New support facilities at MCAS Camp
Pendleton include a new hangar
module, modifications to an existing
hangar, new wash rack, and new
parking apron.
Significant and unavoidable impacts
that cannot be mitigated under the
preferred alternative include traffic
impacts from increased personnel at
MCAS Miramar and land use impacts
from noise compatibility issues at
MCAS Miramar. Potentially significant
but mitigable impacts associated with
the preferred alternative include
seismicity issues associated with
construction at both air stations;
cultural resources issues at MCAS Camp
Pendleton, MCB Camp Pendleton, and
the Bob Stump Training Range
Complex; and biological resources
issues regarding loss of sensitive plant
communities, and rare, and federally
listed threatened or endangered species
from construction at both air stations.
Other alternatives have similar types
and levels of impacts, with the most
extensive significant and unavoidable
impacts occurring from the MCAS
Miramar Full Basing Alternative
VerDate Nov<24>2008
19:45 Feb 13, 2009
Jkt 217001
(Alternative 1) related to the loss of a
large area supporting vernal pool habitat
and associated federally listed species.
Copies of the DEIS can be found on
the project Web site, https://
www.mv22eiswest.net or at the
following locations:
(1) San Diego County Public Library
Fallbrook Branch 124 S. Mission Road
Fallbrook, CA 92028, telephone: 760–
728–2373,
(2) San Diego Public Library Mira
Mesa Branch 8405 New Salem Street
San Diego, CA 92126, telephone: 858–
538–8165,
(3) Yuma County Library Heritage
Branch (Main Library) 350 Third
Avenue Yuma, AZ 85364 telephone:
928–782–1871.
Dated: February 10, 2009.
A. M. Vallandingham,
Lieutenant Commander, Judge Advocate
General’s Corps, U.S. Navy, Federal Register
Liaison Officer.
[FR Doc. E9–3260 Filed 2–13–09; 8:45 am]
BILLING CODE 3810–FF–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13286–000]
Alaska Village Electric Cooperative;
Notice of Preliminary Permit
Applications Accepted for Filing and
Soliciting Comment, Motions To
Intervene, and Competing Applications
On September 16, 2008, Alaska
Village Electric Cooperative filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Kogoluktuk
River Project, to be located on the
Kogoluktuk River, Northwest Arctic
Borough, Alaska.
The proposed Kogoluktuk River
Project consists of: (1) A proposed 500foot-long, 250-foot-high earth filled
gravity dam, (2) a proposed reservoir
having a surface area of 13,440 acres,
with a storage capacity of 335,000 acrefeet, (3) a proposed powerhouse
containing three generating with a total
installed capacity of 4 megawatts, (4) a
proposed 7.5-mile-long, 12.4 kilovolt
transmission line, and (5) appurtenant
facilities. The Alaska Village Electric
Cooperative, project would have an
average annual generation of 16
gigawatt-hours and be sold to a local
utility.
Applicant Contact: Mr. Brent Petrie,
Alaska Village Electric Cooperative,
5534 4831 Eagle Street, Anchorage, AK
99503, phone (907) 565–5358.
Frm 00022
Fmt 4703
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13286) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–3225 Filed 2–13–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
February 6, 2009.
PO 00000
7411
Sfmt 4703
Federal Energy Regulatory
Commission
[Project No. 13322–000]
City of Cortez, CO; Notice of Conduit
Exemption Application Accepted for
Filing and Soliciting Comment,
Motions To Intervene, and Competing
Applications
February 6, 2009.
On November 5, 2008, City of Cortez,
Colorado (Cortez), filed an application
pursuant to 16 U.S.C. 791a–825r of the
Federal Power Act, for conduit
exemption of the Cortez Micro
Hydroelectric Project, to be located on
the raw water supply conduit from the
Dolores Canal to the Cortez’s water
treatment plant in Montezuma County,
Colorado.
The proposed Cortez Micro
Hydroelectric Project consists of: (1) A
proposed powerhouse containing one
generating unit having an installed
capacity of 240 kilowatts, and (2)
appurtenant facilities. The City of
E:\FR\FM\17FEN1.SGM
17FEN1
7412
Federal Register / Vol. 74, No. 30 / Tuesday, February 17, 2009 / Notices
Cortez, Colorado, estimates the project
would have an average annual
generation of 1,400 megawatt-hours that
would be sold to a local utility.
Applicant Contact: Mr. Jack
Nickerson, Public Works Director, City
of Cortez, Colorado, Service Center, 110
W. Progress Circle, Cortez, CO 81321,
phone (970) 565–7320.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 45
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at http:
//www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at http:
//www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13322) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–3226 Filed 2–13–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E9–3341 Filed 2–13–09; 8:45 am]
[Project No. 13330–000]
City of Quincy, Illinois; Notice of
Competing Preliminary Permit
Application Accepted for Filing and
Soliciting Comments and Motions To
Intervene
sroberts on PROD1PC70 with NOTICES
February 10, 2009.
On November 12, 2009, the City of
Quincy, Illinois filed an application,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Mississippi River Lock
& Dam 25 Project to be located on the
Mississippi River in Calhoun County,
Illinois and Lincoln County, Missouri.
VerDate Nov<24>2008
19:45 Feb 13, 2009
The proposed project would utilize the
existing U.S. Army Corps of Engineers
Lock & Dam 25.
The proposed project would consist
of: (1) A powerhouse containing 30
turbine/generator units with a total
installed capacity of 15 MW; (2) a 3.1 or
6.8 mile long, 34.5 kV transmission line
and (3) appurtenant facilities. The
annual production would be 82.1 GWh,
which would be sold to a local utility.
Applicant Contact: Kenneth Cantrell,
Director of Administrative Services, 730
Maine Street, Quincy, IL 62301 (217)
228–4500
FERC Contact: Steven Sachs (202)
502–8666
Competing Application: This
application competes with Project No.
13320–000 filed November 3, 2008.
Competing applications must be filed on
or before April 6, 2009.
Deadline for filing comments, motions
to intervene: 60 days from the issuance
of this notice. Comments, motions to
intervene, notices of intent and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. If unable
to be filed electronically, documents
may be paper-filed. To paper-file, an
original and eight copies should be
mailed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ ling of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13330) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Jkt 217001
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP09–54–000; PF08–9–000]
Ruby Pipeline, L.L.C.; Notice of
Application
February 9, 2009.
Take notice that on January 27, 2009,
Ruby Pipeline, L.L.C. (Ruby) Post Office
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Box 1087, Colorado Springs, Colorado
80944, filed in the above referenced
docket an application pursuant to
section 7(c) of the Natural Gas Act
(NGA) and Parts 157 and 284 of the
Commission’s regulations, for an order
granting a certificate of public
convenience and necessity authorizing
the construction and operation of a new
interstate natural gas pipeline system
extending from Opal, Wyoming to
Malin, Oregon and blanket
transportation and construction
certificates pursuant to Parts 284 and
157 of the Commission’s regulations,
respectively, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@gerc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Specifically, Ruby proposes to
construct and operate: (i) A new, 675.2
mile, 42-inch diameter pipeline
extending westward from Opal,
Wyoming through the states of Utah and
Nevada to a terminus at the Malin Hub
in Oregon; (ii) a 2.6 mile, 42-inch
diameter lateral extending from the
Malin Hub to the Oregon/California
border; (iii) the 69,000 horsepower
Roberson Creek Compressor Station
located in Lincoln County, Wyoming;
(iv) the 28,668 horsepower Wildcat Hills
Compressor Station located in Box Elder
County, Utah; (v) the 39,662 horsepower
Wieland Flat Compressor Station
located in Elko County, Nevada; (vi) the
19,831 horsepower Desert Valley
Compressor Station located in
Humboldt County, Nevada; and (vii)
various receipt points located in Lincoln
County, Wyoming and various bidirectional delivery points located in
Humboldt County, Nevada and Klamath
County, Oregon. Ruby’s proposed
pipeline would be capable of
transporting up to 1,500,000 MMBtu/d
of natural gas from the Rocky Mountains
to the Malin Hub. Ruby estimates that
the facilities will cost approximately
$2.96 billion. Ruby would provide open
access firm and interruptible
transportation on the pipeline pursuant
to its Pro Forma Tariff for which it seeks
approval.
Any questions concerning this
application may be directed to Richard
Derryberry, Director, Regulatory Affairs,
Ruby Pipeline, L.L.C., P.O. Box 1087,
E:\FR\FM\17FEN1.SGM
17FEN1
Agencies
[Federal Register Volume 74, Number 30 (Tuesday, February 17, 2009)]
[Notices]
[Pages 7411-7412]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-3226]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13322-000]
City of Cortez, CO; Notice of Conduit Exemption Application
Accepted for Filing and Soliciting Comment, Motions To Intervene, and
Competing Applications
February 6, 2009.
On November 5, 2008, City of Cortez, Colorado (Cortez), filed an
application pursuant to 16 U.S.C. 791a-825r of the Federal Power Act,
for conduit exemption of the Cortez Micro Hydroelectric Project, to be
located on the raw water supply conduit from the Dolores Canal to the
Cortez's water treatment plant in Montezuma County, Colorado.
The proposed Cortez Micro Hydroelectric Project consists of: (1) A
proposed powerhouse containing one generating unit having an installed
capacity of 240 kilowatts, and (2) appurtenant facilities. The City of
[[Page 7412]]
Cortez, Colorado, estimates the project would have an average annual
generation of 1,400 megawatt-hours that would be sold to a local
utility.
Applicant Contact: Mr. Jack Nickerson, Public Works Director, City
of Cortez, Colorado, Service Center, 110 W. Progress Circle, Cortez, CO
81321, phone (970) 565-7320.
FERC Contact: Robert Bell, (202) 502-6062.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 45 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at http: //www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at http: //
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13322) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-3226 Filed 2-13-09; 8:45 am]