Mississippi L&D #25 Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene and Competing Applications, 6864-6865 [E9-2873]
Download as PDF
6864
Federal Register / Vol. 74, No. 27 / Wednesday, February 11, 2009 / Notices
acres, a capacity of 10,880 acre-feet, and
a maximum pool elevation of 5,500 feet
msl; (5) a 30 foot diameter, 4,710 foot
long penstock; (6) a powerhouse
containing 10 pump/turbine units with
a total installed capacity of 1,100 MW;
(7) a 10.6 mile long, 500 kV
transmission line and; (8) appurtenant
facilities. The proposed project would
have an annual production of 3,212
GWh which would be sold to a local
utility.
Applicant Contact: Brent L. Smith,
P.O. Box 535, Rigby, Idaho, 83442 (208)
745–0834
FERC Contact: Steven Sachs (202)
502–8666
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent and competing
applications may be filed electronically
via the internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13314) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2869 Filed 2–10–09; 8:45 am]
mstockstill on PROD1PC66 with NOTICES
BILLING CODE 6717–01–P
VerDate Nov<24>2008
17:58 Feb 10, 2009
Jkt 217001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13316–000]
Mesa De Los Carros Hydro, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene and Competing Applications
February 4, 2009.
On November 5, 2008, Mesa De Los
Carros Hydro, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Mesa De Los Carros
Pumped Storage Project to be located in
San Miguel County, New Mexico. The
proposed project would be closed loop
and would not be built on an existing
body of water.
The proposed project would consist
of: (1) An upper earthen dam with a
height of 88 feet and a length of 11,880
feet; (2) an upper reservoir with a
surface area of 276 acres, a capacity of
10,394 acre-feet, and a maximum pool
elevation of 6,900 feet msl; (3) a lower
earthen dam with a height of 110 feet
and a length of 9,662 feet; (4) a lower
reservoir with a surface area of 396
acres, a capacity of 11,652 acre-feet, and
a maximum pool elevation of 5,560 feet
msl; (5) a 29 foot diameter, 9,000 foot
long, steel penstock; (6) a powerhouse
containing 10 pump/turbine units with
a total installed capacity of 1,154 MW;
(7) a 19.5 mile long, 500 kV
transmission line and; (8) appurtenant
facilities. The proposed project would
have an annual production of 4,214
GWh which would be sold to a local
utility.
Applicant Contact: Brent L. Smith,
P.O. Box 535, Rigby, Idaho 83442; (208)
745–0834.
FERC Contact: Steven Sachs (202)
502–8666.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent and competing
applications may be filed electronically
via the internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE, Washington, DC 20426.
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13316) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2871 Filed 2–10–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13320–000]
Mississippi L&D #25 Hydro, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene and Competing Applications
February 4, 2009.
On November 3, 2008, Mississippi
L&D #25 Hydro, LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act (FPA), proposing
to study the feasibility of the
Mississippi River Lock & Dam 25 Project
to be located in Lincoln County,
Missouri and Calhoun County, Illinois.
The proposed project would utilize the
existing U.S. Army Corps of Engineers
Lock and Dam 25 on the Mississippi
River.
The proposed project would consist
of: (1) A powerhouse containing 4
turbine/generator units with a total
installed capacity of 80.4 MW; (2) a 6.8
mile long, 34.5 kV transmission line
and; (3) appurtenant facilities. The
proposed project would have an annual
production of 403 GWh which would be
sold to a local utility.
Applicant Contact: Brent L. Smith,
P.O. Box 535, Rigby, Idaho 83442; (208)
745–0834.
FERC Contact: Steven Sachs (202)
502–8666.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent and competing
applications may be filed electronically
via the internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
E:\FR\FM\11FEN1.SGM
11FEN1
Federal Register / Vol. 74, No. 27 / Wednesday, February 11, 2009 / Notices
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13320) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2873 Filed 2–10–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13318–000]
Swan Lake North Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene and
Competing Applications
mstockstill on PROD1PC66 with NOTICES
February 4, 2009.
On November 5, 2008, Swan Lake
North Hydro, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Swan Lake North
Pumped Storage Project to be located in
Klamath County, Oregon on federal land
managed by the Bureau of Land
Management. The proposed project
would be closed loop and would not be
built on an existing body of water.
The proposed project would consist
of: (1) An upper earthen dam with a
height of 70 feet and a length of 11,850
feet; (2) an upper reservoir with a
surface area of 260 acres, a capacity of
8,300 acre-feet, and a maximum pool
elevation of 5,500 feet msl; (3) a lower
earthen dam with a height of 80 feet and
a length of 8,415 feet; (4) a lower
reservoir with a surface area of 215
acres, a capacity of 8,820 acre-feet, and
a maximum pool elevation of 4,200 feet
msl; (5) a 29 foot diameter, 5,860 foot
long, steel penstock; (6) a powerhouse
containing 10 pump/turbine units with
a total installed capacity of 1,144 MW;
( 7) a 12.5 mile long, 500 kV
VerDate Nov<24>2008
17:58 Feb 10, 2009
Jkt 217001
transmission line and; (8) appurtenant
facilities. The proposed project would
have an annual production of 3,340
GWh which would be sold to a local
utility.
Applicant Contact: Brent L. Smith,
P.O. Box 535, Rigby, Idaho, 83442 (208)
745–0834.
FERC Contact: Steven Sachs (202)
502–8666.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent and competing
applications may be filed electronically
via the internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13318) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2872 Filed 2–10–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13315–000]
Yegua Mesa Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene and
Competing Applications
February 4, 2009.
On November 5, 2008, Yegua Mesa
Hydro, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Yegua Mesa Pumped
Storage Project to be located in San
Miguel County, New Mexico on federal
land administered by the Bureau of
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
6865
Land Management. The proposed
project would be closed loop and would
not be built on an existing body of
water.
The proposed project would consist
of: (1) An upper earthen dam with a
height of 94 feet and a length of 11,088
feet; (2) an upper reservoir with a
surface area of 380 acres, a capacity of
9,868 acre-feet, and a maximum pool
elevation of 6,800 feet msl; (3) a lower
earthen dam with a height of 99 feet and
a length of 5,597 feet; (4) a lower
reservoir with a surface area of 380
acres, a capacity of 9,365 acre-feet, and
a maximum pool elevation of 5,380 feet
msl; (5) a 27 foot diameter, 9,690 foot
long penstock; (6) a powerhouse
containing 10 pump/turbine units with
a total installed capacity of 1,100 MW;
( 7) a 14 mile long, 500 kV transmission
line; and (8) appurtenant facilities. The
proposed project would have an annual
production of 3,993 GWh which would
be sold to a local utility.
Applicant Contact: Brent L. Smith,
P.O. Box 535, Rigby, Idaho 83442, (208)
745–0834.
FERC Contact: Steven Sachs (202)
502–8666.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent and competing
applications may be filed electronically
via the internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13315) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2870 Filed 2–10–09; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\11FEN1.SGM
11FEN1
Agencies
[Federal Register Volume 74, Number 27 (Wednesday, February 11, 2009)]
[Notices]
[Pages 6864-6865]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-2873]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13320-000]
Mississippi L&D 25 Hydro, LLC; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene and Competing Applications
February 4, 2009.
On November 3, 2008, Mississippi L&D 25 Hydro, LLC filed
an application, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Mississippi River Lock
& Dam 25 Project to be located in Lincoln County, Missouri and Calhoun
County, Illinois. The proposed project would utilize the existing U.S.
Army Corps of Engineers Lock and Dam 25 on the Mississippi River.
The proposed project would consist of: (1) A powerhouse containing
4 turbine/generator units with a total installed capacity of 80.4 MW;
(2) a 6.8 mile long, 34.5 kV transmission line and; (3) appurtenant
facilities. The proposed project would have an annual production of 403
GWh which would be sold to a local utility.
Applicant Contact: Brent L. Smith, P.O. Box 535, Rigby, Idaho
83442; (208) 745-0834.
FERC Contact: Steven Sachs (202) 502-8666.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent and competing
applications may be filed electronically via the internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
[[Page 6865]]
on the Commission's Web site under the ``e-Filing'' link. If unable to
be filed electronically, documents may be paper-filed. To paper-file,
an original and eight copies should be mailed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
For more information on how to submit these types of filings please
go to the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of the Commission's Web site at http:/
/www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13320) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-2873 Filed 2-10-09; 8:45 am]