Notice of Filing, 6621-6622 [E9-2688]
Download as PDF
Federal Register / Vol. 74, No. 26 / Tuesday, February 10, 2009 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL09–32–000]
Integrys Energy Services, Inc.,
Complainant, v. New Brunswick Power
Generation Corporation, Respondent;
Notice of Complaint
erowe on PROD1PC63 with NOTICES
February 3, 2009.
Take notice that on February 2, 2009,
pursuant to section 206 of the Federal
Power Act and section 206 of the Rules
and Practice and Procedure, 18 CFR
385.206, Integrys Energy Services, Inc.
(Complainant) filed a formal complaint
against New Brunswick Power
Generation Corporation (Respondent)
alleging that the Respondent’s
participation in the Northern Maine
Independent System Administrator, Inc.
(NMISA) market to serve certain retail
loads, without submission of
information showing that it does not
possess market power in the relevant
market, is inappropriate and requests
that the Commission direct the
Respondent to cease any market-based
sales in the NMISA region.
The Complainant has requested fast
track processing of the complaint.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
VerDate Nov<24>2008
14:17 Feb 09, 2009
Jkt 217001
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on February 23, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2689 Filed 2–9–09; 8:45 am]
BILLING CODE 6717–01–P
6621
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on February 20, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2691 Filed 2–9–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. ER08–375–003]
Federal Energy Regulatory
Commission
Southern California Edison Company;
Notice of Filing
[Docket No. EL09–31–000]
Notice of Filing
February 3, 2009.
Take notice that on January 21, 2009,
Southern California Edison Company
filed additional information regarding
the costs included as Construction Work
in Progress in its rate base as of
February 29, 2008, pursuant to the
Commission’s Order on Compliance
Filing, Southern California Edison Co.,
125 FERC ¶ 61,337 (December 19th
2008) (December Order).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
February 3, 2009.
Sun Edison LLC. Take notice that on
February 2, 2009, Sun Edison LLC,
pursuant to 18 CFR 385.207(a), filed a
Petition for Declaratory Order seeking
confirmation from the Commission that
certain of its subsidiaries’ electricity
sales to end use customers do not
constitute the sale or transmission of
electric energy at wholesale in interstate
commerce for purposes of the Federal
Power Act and regulations promulgated
thereunder, nor jurisdictional rates for
purposes of the Public Utility Holding
Company Act of 2005 and regulations
promulgated thereunder.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
E:\FR\FM\10FEN1.SGM
10FEN1
6622
Federal Register / Vol. 74, No. 26 / Tuesday, February 10, 2009 / Notices
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 4, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2688 Filed 2–9–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER09–554–000]
EcoGrove Wind, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
erowe on PROD1PC63 with NOTICES
February 3, 2009.
This is a supplemental notice in the
above-referenced proceeding of
EcoGrove Wind, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC,
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability, is February 23,
2009.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
VerDate Nov<24>2008
14:17 Feb 09, 2009
Jkt 217001
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2692 Filed 2–9–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–50–000]
Southern Star Central Gas Pipeline,
Inc.; Notice of Request Under Blanket
Authorization
February 3, 2009.
Take notice that on January 21, 2009,
Southern Star Central Gas Pipeline, Inc.
(Southern Star), 4700 State Highway 56,
Owensboro, Kentucky 42301, filed in
Docket No. CP09–50–000, a prior notice
request pursuant to sections 157.205
and 157.210 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act for
authorization to replace a two mile
section of the 12-inch diameter XT
pipeline by constructing two miles of
20-inch diameter pipeline, located in
Johnson County, Missouri, all as more
fully set forth in the application, which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically, Southern Star proposes
to replace a two mile section of the 12inch diameter XT pipeline with two
miles of 20-inch diameter XM pipeline,
near Warrensburg, Missouri, a
continuation of its multi-year plan to
replace the remaining miles of 12-inch
diameter XT pipeline. Southern Star
estimates the cost of construction to be
$5,096,685. Southern Star asserts that
after the proposed pipeline construction
is completed, approximately two miles
of the 12-inch XT pipeline will be
abandoned either in place or by reclaim.
Southern Star states that the
replacement pipeline will improve
reliability and offer flexibility on its
system but does not provide any
additional firm capacity upstream and
will continue to be operated at its
current Maximum Allowable Operating
Pressure of 570 psi.
Any questions regarding the
application should be directed to David
N. Roberts, Manager, Regulatory Affairs,
Southern Star Central Gas Pipeline, Inc.,
4700 State Highway 56, Owensboro,
Kentucky 42301, or call (270) 852–4654.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2696 Filed 2–9–09; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\10FEN1.SGM
10FEN1
Agencies
[Federal Register Volume 74, Number 26 (Tuesday, February 10, 2009)]
[Notices]
[Pages 6621-6622]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-2688]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL09-31-000]
Notice of Filing
February 3, 2009.
Sun Edison LLC. Take notice that on February 2, 2009, Sun Edison
LLC, pursuant to 18 CFR 385.207(a), filed a Petition for Declaratory
Order seeking confirmation from the Commission that certain of its
subsidiaries' electricity sales to end use customers do not constitute
the sale or transmission of electric energy at wholesale in interstate
commerce for purposes of the Federal Power Act and regulations
promulgated thereunder, nor jurisdictional rates for purposes of the
Public Utility Holding Company Act of 2005 and regulations promulgated
thereunder.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
[[Page 6622]]
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on March 4, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-2688 Filed 2-9-09; 8:45 am]
BILLING CODE 6717-01-P