Notice of Filing, 6621-6622 [E9-2688]

Download as PDF Federal Register / Vol. 74, No. 26 / Tuesday, February 10, 2009 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL09–32–000] Integrys Energy Services, Inc., Complainant, v. New Brunswick Power Generation Corporation, Respondent; Notice of Complaint erowe on PROD1PC63 with NOTICES February 3, 2009. Take notice that on February 2, 2009, pursuant to section 206 of the Federal Power Act and section 206 of the Rules and Practice and Procedure, 18 CFR 385.206, Integrys Energy Services, Inc. (Complainant) filed a formal complaint against New Brunswick Power Generation Corporation (Respondent) alleging that the Respondent’s participation in the Northern Maine Independent System Administrator, Inc. (NMISA) market to serve certain retail loads, without submission of information showing that it does not possess market power in the relevant market, is inappropriate and requests that the Commission direct the Respondent to cease any market-based sales in the NMISA region. The Complainant has requested fast track processing of the complaint. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a VerDate Nov<24>2008 14:17 Feb 09, 2009 Jkt 217001 document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on February 23, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–2689 Filed 2–9–09; 8:45 am] BILLING CODE 6717–01–P 6621 Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on February 20, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–2691 Filed 2–9–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [Docket No. ER08–375–003] Federal Energy Regulatory Commission Southern California Edison Company; Notice of Filing [Docket No. EL09–31–000] Notice of Filing February 3, 2009. Take notice that on January 21, 2009, Southern California Edison Company filed additional information regarding the costs included as Construction Work in Progress in its rate base as of February 29, 2008, pursuant to the Commission’s Order on Compliance Filing, Southern California Edison Co., 125 FERC ¶ 61,337 (December 19th 2008) (December Order). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 February 3, 2009. Sun Edison LLC. Take notice that on February 2, 2009, Sun Edison LLC, pursuant to 18 CFR 385.207(a), filed a Petition for Declaratory Order seeking confirmation from the Commission that certain of its subsidiaries’ electricity sales to end use customers do not constitute the sale or transmission of electric energy at wholesale in interstate commerce for purposes of the Federal Power Act and regulations promulgated thereunder, nor jurisdictional rates for purposes of the Public Utility Holding Company Act of 2005 and regulations promulgated thereunder. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. E:\FR\FM\10FEN1.SGM 10FEN1 6622 Federal Register / Vol. 74, No. 26 / Tuesday, February 10, 2009 / Notices This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on March 4, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–2688 Filed 2–9–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER09–554–000] EcoGrove Wind, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization erowe on PROD1PC63 with NOTICES February 3, 2009. This is a supplemental notice in the above-referenced proceeding of EcoGrove Wind, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC, 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability, is February 23, 2009. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor VerDate Nov<24>2008 14:17 Feb 09, 2009 Jkt 217001 must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E9–2692 Filed 2–9–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09–50–000] Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization February 3, 2009. Take notice that on January 21, 2009, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 State Highway 56, Owensboro, Kentucky 42301, filed in Docket No. CP09–50–000, a prior notice request pursuant to sections 157.205 and 157.210 of the Federal Energy Regulatory Commission’s regulations under the Natural Gas Act for authorization to replace a two mile section of the 12-inch diameter XT pipeline by constructing two miles of 20-inch diameter pipeline, located in Johnson County, Missouri, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 toll-free, (866) 208–3676 or TTY, (202) 502–8659. Specifically, Southern Star proposes to replace a two mile section of the 12inch diameter XT pipeline with two miles of 20-inch diameter XM pipeline, near Warrensburg, Missouri, a continuation of its multi-year plan to replace the remaining miles of 12-inch diameter XT pipeline. Southern Star estimates the cost of construction to be $5,096,685. Southern Star asserts that after the proposed pipeline construction is completed, approximately two miles of the 12-inch XT pipeline will be abandoned either in place or by reclaim. Southern Star states that the replacement pipeline will improve reliability and offer flexibility on its system but does not provide any additional firm capacity upstream and will continue to be operated at its current Maximum Allowable Operating Pressure of 570 psi. Any questions regarding the application should be directed to David N. Roberts, Manager, Regulatory Affairs, Southern Star Central Gas Pipeline, Inc., 4700 State Highway 56, Owensboro, Kentucky 42301, or call (270) 852–4654. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E9–2696 Filed 2–9–09; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\10FEN1.SGM 10FEN1

Agencies

[Federal Register Volume 74, Number 26 (Tuesday, February 10, 2009)]
[Notices]
[Pages 6621-6622]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-2688]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL09-31-000]


Notice of Filing

February 3, 2009.
    Sun Edison LLC. Take notice that on February 2, 2009, Sun Edison 
LLC, pursuant to 18 CFR 385.207(a), filed a Petition for Declaratory 
Order seeking confirmation from the Commission that certain of its 
subsidiaries' electricity sales to end use customers do not constitute 
the sale or transmission of electric energy at wholesale in interstate 
commerce for purposes of the Federal Power Act and regulations 
promulgated thereunder, nor jurisdictional rates for purposes of the 
Public Utility Holding Company Act of 2005 and regulations promulgated 
thereunder.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.

[[Page 6622]]

    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on March 4, 2009.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-2688 Filed 2-9-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.