Green Wave Energy Solutions, LLC; Notice Clarifying Deadline for Filing Comments, Motions To Intervene, and Competing Applications, 6275 [E9-2522]
Download as PDF
Federal Register / Vol. 74, No. 24 / Friday, February 6, 2009 / Notices
and Rincon powerhouse; (5) public
recreation facilities at Lake Henshaw
and Lake Wohlford; and (6) appurtenant
facilities and features. The Escondido
project extends from Lake Henshaw at
an elevation of about 2,700 feet to Bear
Valley Powerhouse at an elevation of
750 feet. The Escondido canal currently
consists of approximately 58,404 feet of
gunite lined canal; 3,567 feet of tunnel;
670 feet of metal flume; 2,156 feet of
inverted siphon; and 6,118 feet of
pipeline.
In the revised application, the
applicant proposes to remove the
Warner Ranch well-field, the Rincon
Penstock, and the Rincon powerhouse
from the project.
l. A copy of the updated application
is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
m. With this notice, we are reinitiating consultation with the
California State Historic Preservation
Officer (SHPO), as required by section
106 of the National Historic
Preservation Act, and the regulations of
the Advisory Council on Historic
Preservation, 36, CFR 800.4.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2519 Filed 2–5–09; 8:45 am]
dwashington3 on PROD1PC60 with NOTICES
BILLING CODE 6717–01–P
VerDate Nov<24>2008
14:16 Feb 05, 2009
Jkt 217001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13053–000]
Green Wave Energy Solutions, LLC;
Notice Clarifying Deadline for Filing
Comments, Motions To Intervene, and
Competing Applications
January 29, 2009.
On December 9, 2008, the
Commission issued notice that Green
Wave Energy Solutions, LLC filed an
application on October 19, 2007,
proposing to study the feasibility of the
Green Wave Mendocino Project, to be
located on the Pacific Ocean in
Mendocino County, California. Pursuant
to that notice the deadline for filing
comments, motions to intervene, or
competing applications is 60 days from
December 9, 2008.
The Commission has been requested
to correct any confusion as to the
deadline date. According to 18 CFR
385.2007, when the deadline falls on a
Saturday or Sunday, the notice period
ends at the close of business on the next
business day. This notice clarifies that
the deadline date for filing any
documents is Monday, February 9,
2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2522 Filed 2–5–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12718–002]
Natural Currents Energy Services,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
January 29, 2009.
On November 6, 2008, and
supplemented on December 15, 2008,
Natural Currents Energy Services, LLC
filed an application, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Wards
Island Tidal Energy Project located in
the East River, off the south point of
Wards Island in Hell’s Gate in New York
County, New York. The project uses no
dam or impoundment.
The proposed project would consist of
a hybrid generating station using solar,
wind, and tidal power generators. The
preliminary permit for this project will
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
6275
only deal the hydro portion of this
project and would consist of: (1) A
bridge approximately 60 feet-long
leading to, (2) a barge-mounted power
module equipped with, (3) four
integrated 24 kilowatt vertical-axis
helical turbines, for a total installed
capacity of the tidal component of 96
kilowatts, and (4) interconnection
transmission lines approximately 50 feet
in length. The tidal component of the
project is estimated to have a minimum
annual generation of 420.5 megawatthours per year. Power generated by this
project would contribute to the microloop utility grid to be developed on
Wards Island for servicing the power
needs of the public recreation and park
facilities located there.
Applicant Contact: Mr. Roger Bason,
Natural Currents Energy Services, LLC,
24 Roxanne Boulevard, Highland, New
York 12561, phone: (845) 691–4008.
FERC Contact: Kelly T. Houff (202)
502–6393.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
http:
//www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–12718–002) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–2521 Filed 2–5–09; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\06FEN1.SGM
06FEN1
Agencies
[Federal Register Volume 74, Number 24 (Friday, February 6, 2009)]
[Notices]
[Page 6275]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-2522]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13053-000]
Green Wave Energy Solutions, LLC; Notice Clarifying Deadline for
Filing Comments, Motions To Intervene, and Competing Applications
January 29, 2009.
On December 9, 2008, the Commission issued notice that Green Wave
Energy Solutions, LLC filed an application on October 19, 2007,
proposing to study the feasibility of the Green Wave Mendocino Project,
to be located on the Pacific Ocean in Mendocino County, California.
Pursuant to that notice the deadline for filing comments, motions to
intervene, or competing applications is 60 days from December 9, 2008.
The Commission has been requested to correct any confusion as to
the deadline date. According to 18 CFR 385.2007, when the deadline
falls on a Saturday or Sunday, the notice period ends at the close of
business on the next business day. This notice clarifies that the
deadline date for filing any documents is Monday, February 9, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-2522 Filed 2-5-09; 8:45 am]
BILLING CODE 6717-01-P