Tieton Hydropower, LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 4420-4421 [E9-1469]

Download as PDF 4420 Federal Register / Vol. 74, No. 15 / Monday, January 26, 2009 / Notices Estimated costs to respondents are: 1. For FERC–65, $5,468. [90 hours divided by 2080 hours 2 per year, times $126,384 3 equals $5,468.54]. The average cost per respondent is $182.28. 2. For FERC–65A, $607.62. [10 hours divided by 2080 hours 2 per year, times $126,384 3 equals $607.62]. The average cost per respondent is $60.76. 3. For FERC–65B, $607.62. [10 hours divided by 2080 hours 2 per year, times $126,384 3 equals $607.62]. The average cost per respondent is $60.76. The reporting burden includes the total time, effort, or financial resources expended to generate, maintain, retain, disclose, or provide the information including: (1) Reviewing instructions; (2) developing, acquiring, installing, and utilizing technology and systems for the purposes of collecting, validating, verifying, processing, maintaining, disclosing and providing information; (3) adjusting the existing ways to comply with any previously applicable instructions and requirements; (4) training personnel to respond to a collection of information; (5) searching data sources; (6) completing and reviewing the collection of information; and (7) transmitting, or otherwise disclosing the information. The estimate of cost for respondents is based upon salaries for professional and clerical support, as well as direct and indirect overhead costs. Direct costs include all costs directly attributable to providing this information, such as administrative costs and the cost for information technology. Indirect or overhead costs are costs incurred by an organization in support of its mission. These costs apply to activities which benefit the whole organization rather than any one particular function or activity. Comments are invited on: (1) Whether the proposed collections of information are necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimates of the burden of the proposed collections of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information to be collected; and (4) ways to minimize the burden of the collections of information on those who are to respond, including the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of 2 Number 3 Average of hours an employee works each year. annual salary per employee. VerDate Nov<24>2008 17:20 Jan 23, 2009 Jkt 217001 information technology, e.g. permitting electronic submission of responses. Kimberly D. Bose, Secretary. [FR Doc. E9–1470 Filed 1–23–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3701–089] Tieton Hydropower, LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests January 15, 2009. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Amendment of license to delete certain nonjurisdictional transmission facilities from license. b. Project No: 3701–089. c. Date Filed: November 17, 2008. d. Applicant: Tieton Hydropower, LLC. e. Name of Project: Tieton Hydroelectric Project. f. Location: The project is located at the U.S. Bureau of Reclamation’s Tieton Dam and Reservoir on the Tieton River in Yakima County, Washington. g. Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Chad Ross, Tieton Hydropower, LLC, 925 N Fairgrounds Road, Goldendale, Washington 98206. Tel: (509) 773–4900. i. FERC Contact: Any questions on this notice should be addressed to Ms. Kelly Houff at (202) 502–6393, or e-mail address: Kelly.Houff@ferc.gov. j. Deadline for filing comments and or motions: February 17, 2009. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and instructions on the Commission’s Web site under the ‘‘e-filing’’ link. The Commission strongly encourages electronic filings. Please include the project number P– 3701–089 on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all interveners filing documents with the Commission PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. k. Description of Request: Tieton Hydropower, LLC proposes to delete from the license, a 21-mile-long 115–kV transmission line extending from the Tieton Project to the PacifiCorp Tieton Substation, and the substation originally included in the Tieton Project description. According to the licensee, the line and substation will no longer be primary transmission facilities transmitting power solely for the Tieton Project, but will be used for the transmission of non-Tieton Project power. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3372 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must E:\FR\FM\26JAN1.SGM 26JAN1 Federal Register / Vol. 74, No. 15 / Monday, January 26, 2009 / Notices be received on or before the specified comment date for the particular application. o. Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E9–1469 Filed 1–23–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings # 1 January 15, 2009. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC09–47–000. Applicants: Longview Power. Description: Joint Application for Approval under Section 203 of the FPA and Requests for Expedited Review and Confidential Treatment. Filed Date: 01/09/2009. Accession Number: 20090109–5053. Comment Date: 5 p.m. Eastern Time on Friday, January 30, 2009. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER01–3001–022; ER03–647–013. Applicants: New York Independent System Operator, Inc. Description: Compliance Filing of New York Independent System Operator, Inc. Filed Date: 01/15/2009. Accession Number: 20090115–5038. Comment Date: 5 p.m. Eastern Time on Thursday, February 5, 2009. VerDate Nov<24>2008 17:20 Jan 23, 2009 Jkt 217001 Docket Numbers: ER07–188–005. Applicants: Duke Energy Carolinas, LLC. Description: Duke Energy Carolinas, LLC submits additional information pertaining to the Simultaneous Import Limitation study, in response to FERC’s 12/23/08 request. Filed Date: 01/13/2009. Accession Number: 20090115–0079. Comment Date: 5 p.m. Eastern Time on Tuesday, February 3, 2009. Docket Numbers: ER09–90–001. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc submits revised pages to its Open Access Transmission Tariff, pursuant to Commission’s 12/16/08 Order. Filed Date: 01/13/2009. Accession Number: 20090114–0184. Comment Date: 5 p.m. Eastern Time on Tuesday, February 3, 2009. Docket Numbers: ER09–249–000 Applicants: Public Service Electric and Gas Company. Description: Public Service Electric and Gas Company submits response to the Commission Staff’s request for additional information dated 1/2/08. Filed Date: 01/12/2009. Accession Number: 20090113–0354. Comment Date: 5 p.m. Eastern Time on Monday, February 2, 2009. Docket Numbers: ER09–354–001. Applicants: CAM Energy Trading LLC. Description: CAM Energy Trading, LLC submits correction to Notice of Cancellation of market based rate tariff for CET, revised tariff sheet under ER09–354. Filed Date: 01/09/2009. Accession Number: 20090112–0176. Comment Date: 5 p.m. Eastern Time on Friday, January 23, 2009. Docket Numbers: ER09–370–001. Applicants: EPCOR USA North Carolina LLC. Description: EPCOR USA North Carolina, LLC submits supplements to its Notice of Name Change and Succession filed on 12/1/08. Filed Date: 01/13/2009. Accession Number: 20090114–0185. Comment Date: 5 p.m. Eastern Time on Tuesday, February 3, 2009. Docket Numbers: ER09–474–002. Applicants: PowerSmith Cogeneration Project Limited. Description: PowerSmith Cogeneration Project, Limited Partnership submits Substitute Original Sheet 1 and 2 to FERC Electric Tariff, Original Volume 1. Filed Date: 01/13/2009. Accession Number: 20090114–0186. Comment Date: 5 p.m. Eastern Time on Tuesday, February 3, 2009. PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 4421 Docket Numbers: ER09–535–000. Applicants: Commonwealth Edison Company and Commonwealth. Description: Commonwealth Edison Company of Indiana, Inc. submits revised Attachment H–13 (Network Integration Transmission Service for the ComEd Zone) of the PJM Interconnection, LLC Open Access Transmission Tariff. Filed Date: 01/13/2009. Accession Number: 20090114–0187. Comment Date: 5 p.m. Eastern Time on Tuesday, February 3, 2009. Docket Numbers: ER09–536–000. Applicants: Osceola Windpower, LLC. Description: Osceola Windpower, LLC submits Shared Facilities Agreement with Osceola Windpower II, LLC dated as of 9/30/08 designated as Rate Schedule FERC 1 pursuant to the requirements of Order 888 et al. Filed Date: 01/13/2009. Accession Number: 20090114–0188. Comment Date: 5 p.m. Eastern Time on Tuesday, February 3, 2009. Take notice that the Commission received the following open access transmission tariff filings: Docket Numbers: OA08–67–004. Applicants: Progress Energy, Inc. Description: Progress Energy, Inc. submits Amendment to Order 890–A Compliance Filing. Filed Date: 01/08/2009. Accession Number: 20090108–5084. Comment Date: 5 p.m. Eastern Time on Thursday, January 29, 2009. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be E:\FR\FM\26JAN1.SGM 26JAN1

Agencies

[Federal Register Volume 74, Number 15 (Monday, January 26, 2009)]
[Notices]
[Pages 4420-4421]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-1469]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3701-089]


Tieton Hydropower, LLC; Notice of Application for Amendment of 
License and Soliciting Comments, Motions To Intervene, and Protests

January 15, 2009.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Amendment of license to delete certain non-
jurisdictional transmission facilities from license.
    b. Project No: 3701-089.
    c. Date Filed: November 17, 2008.
    d. Applicant: Tieton Hydropower, LLC.
    e. Name of Project: Tieton Hydroelectric Project.
    f. Location: The project is located at the U.S. Bureau of 
Reclamation's Tieton Dam and Reservoir on the Tieton River in Yakima 
County, Washington.
    g. Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Chad Ross, Tieton Hydropower, LLC, 925 N 
Fairgrounds Road, Goldendale, Washington 98206. Tel: (509) 773-4900.
    i. FERC Contact: Any questions on this notice should be addressed 
to Ms. Kelly Houff at (202) 502-6393, or e-mail address: 
Kelly.Houff@ferc.gov.
    j. Deadline for filing comments and or motions: February 17, 2009.
    All documents (original and eight copies) should be filed with: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426. Comments, protests, and 
interventions may be filed electronically via the Internet in lieu of 
paper; see 18 CFR 385.2001(a)(1)(iii) and instructions on the 
Commission's Web site under the ``e-filing'' link. The Commission 
strongly encourages electronic filings. Please include the project 
number P-3701-089 on any comments or motions filed.
    The Commission's Rules of Practice and Procedure require all 
interveners filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervener files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency. A copy 
of any motion to intervene must also be served upon each representative 
of the Applicant specified in the particular application.
    k. Description of Request: Tieton Hydropower, LLC proposes to 
delete from the license, a 21-mile-long 115-kV transmission line 
extending from the Tieton Project to the PacifiCorp Tieton Substation, 
and the substation originally included in the Tieton Project 
description. According to the licensee, the line and substation will no 
longer be primary transmission facilities transmitting power solely for 
the Tieton Project, but will be used for the transmission of non-Tieton 
Project power.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3372 or e-mail 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must

[[Page 4421]]

be received on or before the specified comment date for the particular 
application.
    o. Any filings must bear in all capital letters the title 
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, 
and the Project Number of the particular application to which the 
filing refers.
    p. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.
    q. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site at https://www.ferc.gov 
under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
 [FR Doc. E9-1469 Filed 1-23-09; 8:45 am]
BILLING CODE 6717-01-P