Tuscarora Gas Transmission Company; Notice Deferring Technical Conference, 3588 [E9-1017]
Download as PDF
3588
Federal Register / Vol. 74, No. 12 / Wednesday, January 21, 2009 / Notices
mstockstill on PROD1PC66 with NOTICES
Filed Date: 01/06/2009.
Accession Number: 20090107–0324.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
[Docket No. RP09–8–000]
[Docket Nos. CP03–75–003; CP03–75–004;
CP05–361–001; CP05–361–002]
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–1033 Filed 1–16–09; 8:45 am]
BILLING CODE 6717–01–P
VerDate Nov<24>2008
18:54 Jan 16, 2009
Jkt 217001
Tuscarora Gas Transmission
Company; Notice Deferring Technical
Conference
January 12, 2009.
On January 12, 2009, Tuscarora Gas
Transmission Company (Tuscarora)
filed a request for deferral of the
technical conference scheduled in the
above-captioned proceeding for January
15, 2009.1 Tuscarora states that it has
reached a settlement in principle with
the active parties in this proceeding,
and that it anticipates filing an offer of
settlement that will resolve all of the
issues in this proceeding by February
12, 2009. Therefore, Tuscarora requests
that the Commission defer the date of
the technical conference until midFebruary 2009, to allow the parties time
to prepare and review the offer of
settlement. Tuscarora states that it is
authorized by the active parties in this
proceeding to express their support for
this request to defer both the technical
conference date and the effective date of
the suspended tariff sheets.2
By this notice, Tuscarora’s request for
deferral of the dates related to the
technical conference is granted. The
technical conference scheduled for
January 15, 2009, is thereby postponed
until further notice.
For further information please contact
Timothy Duggan at (202) 502–8326 or
e-mail Timothy.Duggan@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–1017 Filed 1–16–09; 8:45 am]
BILLING CODE 6717–01–P
Freeport LNG Development, L.P.;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Freeport LNG Export and
Bog Liquefaction and Truck Delivery
Facilities Projects and Request for
Comments on Environmental Issues
January 12, 2009.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
address the environmental impacts of
the Freeport LNG Export Project (Export
Project) and Bog Liquefaction and Truck
Delivery Facilities Project (BOG/Truck
Project) collective called the Freeport
Projects proposed by Freeport LNG
Development, L.P. (Freeport LNG) in
Brazoria County, Texas.1 This EA will
be used by the Commission in its
decision-making process to determine
whether or not to authorize the
projects.2
This notice announces the opening of
the scoping process we 3 will use to
gather environmental input from the
public and interested agencies on the
projects. Your input will help the
Commission staff determine which
issues need to be addressed.
This notice is being sent to affected
landowners; federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers. State and local
government representatives are asked to
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
Summary of the Proposed Projects
1 The
Commission directed that a technical
conference be held to address the issues raised by
Tuscarora’s October 1, 2008 tariff filing in this
proceeding. Tuscarora Gas Transmission Co., 125
FERC ¶ 61,133 (2008). The technical conference was
originally scheduled for December 11, 2008. At the
request of the active parties, the Commission issued
a notice on December 8, 2008, that postponed the
date of the technical conference to January 15, 2009.
2 Given agreement in principle among the active
parties, Tuscarora agrees not to move into effect the
tariff sheets previously suspended by the
Commission in this proceeding prior to June 1,
2009. This deferral of the effectiveness of the
suspended tariff sheets will afford time for a
possible settlement to be filed and considered by
the Commission.
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Export Project
The purpose of the project is to add
Liquefied Natural Gas (LNG) export
1 During routine terminal operations, ambient
heat in the LNG storage tanks and piping causes
small amount of LNG to evaporate. The vaporizing
LNG is referred to as BOG or boil-off gas. The BOG
increases the storage tank pressure until a point
where it must be transferred, flared, or re-liquefied.
2 On November 19, and December 9, 2008,
Freeport LNG filed its applications with the
Commission under section 3 of the Natural Gas Act
and Part 157 of the Commission’s regulations. The
Commission issued its Notices of Application on
December 2, and 16, 2009.
3 ‘We,’ ‘us,’ and ‘our’ refer to the environmental
staff of the FERC’s Office of Energy Projects.
E:\FR\FM\21JAN1.SGM
21JAN1
Agencies
[Federal Register Volume 74, Number 12 (Wednesday, January 21, 2009)]
[Notices]
[Page 3588]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-1017]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP09-8-000]
Tuscarora Gas Transmission Company; Notice Deferring Technical
Conference
January 12, 2009.
On January 12, 2009, Tuscarora Gas Transmission Company (Tuscarora)
filed a request for deferral of the technical conference scheduled in
the above-captioned proceeding for January 15, 2009.\1\ Tuscarora
states that it has reached a settlement in principle with the active
parties in this proceeding, and that it anticipates filing an offer of
settlement that will resolve all of the issues in this proceeding by
February 12, 2009. Therefore, Tuscarora requests that the Commission
defer the date of the technical conference until mid-February 2009, to
allow the parties time to prepare and review the offer of settlement.
Tuscarora states that it is authorized by the active parties in this
proceeding to express their support for this request to defer both the
technical conference date and the effective date of the suspended
tariff sheets.\2\
---------------------------------------------------------------------------
\1\ The Commission directed that a technical conference be held
to address the issues raised by Tuscarora's October 1, 2008 tariff
filing in this proceeding. Tuscarora Gas Transmission Co., 125 FERC
] 61,133 (2008). The technical conference was originally scheduled
for December 11, 2008. At the request of the active parties, the
Commission issued a notice on December 8, 2008, that postponed the
date of the technical conference to January 15, 2009.
\2\ Given agreement in principle among the active parties,
Tuscarora agrees not to move into effect the tariff sheets
previously suspended by the Commission in this proceeding prior to
June 1, 2009. This deferral of the effectiveness of the suspended
tariff sheets will afford time for a possible settlement to be filed
and considered by the Commission.
---------------------------------------------------------------------------
By this notice, Tuscarora's request for deferral of the dates
related to the technical conference is granted. The technical
conference scheduled for January 15, 2009, is thereby postponed until
further notice.
For further information please contact Timothy Duggan at (202) 502-
8326 or e-mail Timothy.Duggan@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-1017 Filed 1-16-09; 8:45 am]