Combined Notice of Filings #1, 2579-2580 [E9-701]

Download as PDF jlentini on PROD1PC65 with NOTICES Federal Register / Vol. 74, No. 10 / Thursday, January 15, 2009 / Notices 888 First Street, NE., Washington, DC 20426. Comments, protests, and/or interventions may be filed electronically via the Internet in lieu of paper. Any questions, please contact the Secretary’s Office. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https:// www.ferc.gov under the ‘‘e-Filing’’ link. Please include the docket number (DI09–3–000) on any comments, protests, and/or motions filed. k. Description of Project: The proposed Spaur Ranch Microhydro Project will include: (1) An existing 800yard-long, 15-inch-diameter pipe that reduces to a 600-foot-long, 10-inchdiameter pipe, conveying water from the West Side Irrigation Ditch into an existing building containing a 11-kW pelton wheel turbine; (2) a short tailrace, conveying the water back into the irrigation canal; and (3) appurtenant facilities. The power from the proposed project will be net metered, connected to the interstate grid through Pacific Power. The proposed project will not occupy any tribal or Federal lands. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link, select ‘‘Docket#’’ and follow the instructions. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3372, or TTY, contact (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the VerDate Nov<24>2008 18:58 Jan 14, 2009 Jkt 217001 requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, and/or ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E9–706 Filed 1–14–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 January 7, 2009. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC09–35–000. Applicants: New Harquahala Generating Co., LLC,MACH Gen, LLC, New Athens Generating Company, LLC, Millennium Power Partners, LP, Strategic Value Partners. Description: Application of MACH Gen, LLC, et al. under Section 203 of the Federal Power Act. Filed Date: 01/06/2009. Accession Number: 20090106–5086. Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009. Docket Numbers: EC09–36–000. Applicants: EDF Development, Inc., Constellation Energy Group, Inc., Handsome Lake Energy, LLC. PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 2579 Description: Joint Application of EDF Development, Inc. et al. under Section 203 of the Federal Power Act. Filed Date: 01/06/2009. Accession Number: 20090106–5090. Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009. Docket Numbers: EC09–37–000. Applicants: EDF Development, Inc., Constellation Energy Group, Inc., CER Generation II, LLC. Description: Joint Application of EDF Development, Inc. et al. under Section 203 of the Federal Power Act. Filed Date: 01/06/2009. Accession Number: 20090106–5093. Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009. Docket Numbers: EC09–38–000. Applicants: EDF Development, Inc., Constellation Energy Group Inc. Description: Joint Application of EDF Development, Inc. et al. under Section 203 of the Federal Power Act. Filed Date: 01/06/2009. Accession Number: 20090106–5095. Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009. Docket Numbers: EC09–39–000. Applicants: EDF Development, Inc., Constellation Energy Group, Inc., Constellation Power Source Generation LLC. Description: Joint Application of EDF Development, Inc. et al. under Section 203 of Federal Power Act. Filed Date: 01/06/2009. Accession Number: 20090106–5096 Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009. Docket Numbers: EC09–40–000. Applicants: EDF Development, Inc., Constellation Energy Group, Inc., Constellation Energy Nuclear Group, LLC. Description: Joint Application of EDF Development, Inc. et al. under Section 203 of Federal Power Act. Filed Date: 01/06/2009. Accession Number: 20090106–5097 Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009. Docket Numbers: EC09–41–000. Applicants: EDF Development, Inc., Constellation Energy Group, Inc., Constellation Power Source Generation LLC. Description: Joint Application of EDF Development, Inc. under Section 203 of the Federal Power Act. Filed Date: 01/06/2009. Accession Number: 20090106–5098. Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009. Docket Numbers: EC09–42–000. Applicants: EDF Development, Inc., Constellation Energy Group, Inc. E:\FR\FM\15JAN1.SGM 15JAN1 jlentini on PROD1PC65 with NOTICES 2580 Federal Register / Vol. 74, No. 10 / Thursday, January 15, 2009 / Notices Description: Joint Application of EDF Development, Inc. under Section 203 of Federal Power Act. Filed Date: 01/06/2009. Accession Number: 20090106–5099. Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009. Docket Numbers: EC09–43–000. Applicants: EDF Development, Inc., Constellation Energy Group, Inc. Description: Joint Application of EDF Development, Inc., et al. for Authorization Under Section 203 of the Federal Power Act and Request for Expedited Treatment. Filed Date: 01/06/2009. Accession Number: 20090106–5120. Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009. Docket Numbers: EC09–44–000. Applicants: EDF Development, Inc., Constellation Energy Group, Inc., Constellation Power Source Generation LLC. Description: Joint Application of EDF Development, Inc., et al. for Authorization Under Section 203 of the Federal Power Act and Request for Expedited Treatment. Filed Date: 01/06/2009. Accession Number: 20090106–5121 Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009. Docket Numbers: EC09–45–000. Applicants: EDF Development, Inc., Constellation Energy Group, Inc. Description: Joint Application of EDF Development, Inc., et al. for Authorization Under Section 203 of the Federal Power Act and Request for Expedited Treatment. Filed Date: 01/06/2009. Accession Number: 20090106–5122. Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009. Docket Numbers: EC09–46–000. Applicants: EDF Development, Inc., Constellation Energy Group, Inc., Constellation Power Source Generation LLC. Description: Joint Application of EDF Development, Inc., et al. for Authorization Under Section 203 of the Federal Power Act and Request for Expedited Treatment. Filed Date: 01/06/2009. Accession Number: 20090106–5123. Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER00–3614–011. Applicants: BP Energy Company. Description: BP Energy Company submits an updated market power analysis. Filed Date: 12/22/2008. VerDate Nov<24>2008 18:58 Jan 14, 2009 Jkt 217001 Accession Number: 20081222–4003. Comment Date: 5 p.m. Eastern Time on Friday, February 20, 2009. Docket Numbers: ER01–205–033; ER98–2640–031. Applicants: Xcel Energy Services Inc. Description: Northern States Power Company-Minnesota, and Northern States Power Company-Wisconsin submit a Triennial Market Power Analysis pursuant to Order 697. Filed Date: 12/22/2008. Accession Number: 20081229–0153. Comment Date: 5 p.m. Eastern Time on Friday, February 20, 2009. Docket Numbers: ER07–30–002. Applicants: RC Cape May Holdings, LLC. Description: RC Cape May Holdings, LLC submits Substitute Original Sheet 1&2 to its FERC Electric Tariff, First Revised Volume 1. Filed Date: 12/31/2008. Accession Number: 20090105–0145. Comment Date: 5 p.m. Eastern Time on Wednesday, January 21, 2009. Docket Numbers: ER09–474–000. Applicants: PowerSmith Cogeneration Project Limited. Description: PowerSmith Cogeneration Project, Limited Partnership submits an Application for Market-Based Rate Authorization and Request for Waivers and Blanket Approvals. Filed Date: 12/31/2008. Accession Number: 20090105–0006. Comment Date: 5 p.m. Eastern Time on Wednesday, January 21, 2009. Docket Numbers: ER09–475–000. Applicants: Simpson Tacoma Kraft Company, LLC. Description: Simpson Tacoma Kraft Company, LLC submits Public Petition for Acceptance of Initial Tariff Waivers and Blanket Authority. Filed Date: 12/31/2008. Accession Number: 20090106–0081. Comment Date: 5 p.m. Eastern Time on Wednesday, January 21, 2009. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern Time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–701 Filed 1–14–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance at Midwest ISO Meetings January 8, 2009. The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and Commission staff may attend the following Midwest ISO-related meetings in 2009: • Advisory Committee (10 a.m.–3 p.m., ET). • January 14. • February 18. • March 18. • May 20. • June 17. • July 15. E:\FR\FM\15JAN1.SGM 15JAN1

Agencies

[Federal Register Volume 74, Number 10 (Thursday, January 15, 2009)]
[Notices]
[Pages 2579-2580]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-701]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

January 7, 2009.
    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC09-35-000.
    Applicants: New Harquahala Generating Co., LLC,MACH Gen, LLC, New 
Athens Generating Company, LLC, Millennium Power Partners, LP, 
Strategic Value Partners.
    Description: Application of MACH Gen, LLC, et al. under Section 203 
of the Federal Power Act.
    Filed Date: 01/06/2009.
    Accession Number: 20090106-5086.
    Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.

    Docket Numbers: EC09-36-000.
    Applicants: EDF Development, Inc., Constellation Energy Group, 
Inc., Handsome Lake Energy, LLC.
    Description: Joint Application of EDF Development, Inc. et al. 
under Section 203 of the Federal Power Act.
    Filed Date: 01/06/2009.
    Accession Number: 20090106-5090.
    Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.

    Docket Numbers: EC09-37-000.
    Applicants: EDF Development, Inc., Constellation Energy Group, 
Inc., CER Generation II, LLC.
    Description: Joint Application of EDF Development, Inc. et al. 
under Section 203 of the Federal Power Act.
    Filed Date: 01/06/2009.
    Accession Number: 20090106-5093.
    Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.

    Docket Numbers: EC09-38-000.
    Applicants: EDF Development, Inc., Constellation Energy Group Inc.
    Description: Joint Application of EDF Development, Inc. et al. 
under Section 203 of the Federal Power Act.
    Filed Date: 01/06/2009.
    Accession Number: 20090106-5095.
    Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.

    Docket Numbers: EC09-39-000.
    Applicants: EDF Development, Inc., Constellation Energy Group, 
Inc., Constellation Power Source Generation LLC.
    Description: Joint Application of EDF Development, Inc. et al. 
under Section 203 of Federal Power Act.
    Filed Date: 01/06/2009.
    Accession Number: 20090106-5096
    Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.

    Docket Numbers: EC09-40-000.
    Applicants: EDF Development, Inc., Constellation Energy Group, 
Inc., Constellation Energy Nuclear Group, LLC.
    Description: Joint Application of EDF Development, Inc. et al. 
under Section 203 of Federal Power Act.
    Filed Date: 01/06/2009.
    Accession Number: 20090106-5097
    Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.

    Docket Numbers: EC09-41-000.
    Applicants: EDF Development, Inc., Constellation Energy Group, 
Inc., Constellation Power Source Generation LLC.
    Description: Joint Application of EDF Development, Inc. under 
Section 203 of the Federal Power Act.
    Filed Date: 01/06/2009.
    Accession Number: 20090106-5098.
    Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.

    Docket Numbers: EC09-42-000.
    Applicants: EDF Development, Inc., Constellation Energy Group, Inc.

[[Page 2580]]

    Description: Joint Application of EDF Development, Inc. under 
Section 203 of Federal Power Act.
    Filed Date: 01/06/2009.
    Accession Number: 20090106-5099.
    Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.

    Docket Numbers: EC09-43-000.
    Applicants: EDF Development, Inc., Constellation Energy Group, Inc.
    Description: Joint Application of EDF Development, Inc., et al. for 
Authorization Under Section 203 of the Federal Power Act and Request 
for Expedited Treatment.
    Filed Date: 01/06/2009.
    Accession Number: 20090106-5120.
    Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.

    Docket Numbers: EC09-44-000.
    Applicants: EDF Development, Inc., Constellation Energy Group, 
Inc., Constellation Power Source Generation LLC.
    Description: Joint Application of EDF Development, Inc., et al. for 
Authorization Under Section 203 of the Federal Power Act and Request 
for Expedited Treatment.
    Filed Date: 01/06/2009.
    Accession Number: 20090106-5121
    Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.

    Docket Numbers: EC09-45-000.
    Applicants: EDF Development, Inc., Constellation Energy Group, Inc.
    Description: Joint Application of EDF Development, Inc., et al. for 
Authorization Under Section 203 of the Federal Power Act and Request 
for Expedited Treatment.
    Filed Date: 01/06/2009.
    Accession Number: 20090106-5122.
    Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.

    Docket Numbers: EC09-46-000.
    Applicants: EDF Development, Inc., Constellation Energy Group, 
Inc., Constellation Power Source Generation LLC.
    Description: Joint Application of EDF Development, Inc., et al. for 
Authorization Under Section 203 of the Federal Power Act and Request 
for Expedited Treatment.
    Filed Date: 01/06/2009.
    Accession Number: 20090106-5123.
    Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER00-3614-011.
    Applicants: BP Energy Company.
    Description: BP Energy Company submits an updated market power 
analysis.
    Filed Date: 12/22/2008.
    Accession Number: 20081222-4003.
    Comment Date: 5 p.m. Eastern Time on Friday, February 20, 2009.

    Docket Numbers: ER01-205-033; ER98-2640-031.
    Applicants: Xcel Energy Services Inc.
    Description: Northern States Power Company-Minnesota, and Northern 
States Power Company-Wisconsin submit a Triennial Market Power Analysis 
pursuant to Order 697.
    Filed Date: 12/22/2008.
    Accession Number: 20081229-0153.
    Comment Date: 5 p.m. Eastern Time on Friday, February 20, 2009.

    Docket Numbers: ER07-30-002.
    Applicants: RC Cape May Holdings, LLC.
    Description: RC Cape May Holdings, LLC submits Substitute Original 
Sheet 1&2 to its FERC Electric Tariff, First Revised Volume 1.
    Filed Date: 12/31/2008.
    Accession Number: 20090105-0145.
    Comment Date: 5 p.m. Eastern Time on Wednesday, January 21, 2009.

    Docket Numbers: ER09-474-000.
    Applicants: PowerSmith Cogeneration Project Limited.
    Description: PowerSmith Cogeneration Project, Limited Partnership 
submits an Application for Market-Based Rate Authorization and Request 
for Waivers and Blanket Approvals.
    Filed Date: 12/31/2008.
    Accession Number: 20090105-0006.
    Comment Date: 5 p.m. Eastern Time on Wednesday, January 21, 2009.

    Docket Numbers: ER09-475-000.
    Applicants: Simpson Tacoma Kraft Company, LLC.
    Description: Simpson Tacoma Kraft Company, LLC submits Public 
Petition for Acceptance of Initial Tariff Waivers and Blanket 
Authority.
    Filed Date: 12/31/2008.
    Accession Number: 20090106-0081.
    Comment Date: 5 p.m. Eastern Time on Wednesday, January 21, 2009.

    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern Time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed docket(s). For assistance with 
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or 
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-701 Filed 1-14-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.