Combined Notice of Filings #1, 2579-2580 [E9-701]
Download as PDF
jlentini on PROD1PC65 with NOTICES
Federal Register / Vol. 74, No. 10 / Thursday, January 15, 2009 / Notices
888 First Street, NE., Washington, DC
20426. Comments, protests, and/or
interventions may be filed electronically
via the Internet in lieu of paper. Any
questions, please contact the Secretary’s
Office. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing’’ link.
Please include the docket number
(DI09–3–000) on any comments,
protests, and/or motions filed.
k. Description of Project: The
proposed Spaur Ranch Microhydro
Project will include: (1) An existing 800yard-long, 15-inch-diameter pipe that
reduces to a 600-foot-long, 10-inchdiameter pipe, conveying water from the
West Side Irrigation Ditch into an
existing building containing a 11-kW
pelton wheel turbine; (2) a short
tailrace, conveying the water back into
the irrigation canal; and (3) appurtenant
facilities. The power from the proposed
project will be net metered, connected
to the interstate grid through Pacific
Power. The proposed project will not
occupy any tribal or Federal lands.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the interests of
interstate or foreign commerce would be
affected by the project. The Commission
also determines whether or not the
project: (1) Would be located on a
navigable waterway; (2) would occupy
or affect public lands or reservations of
the United States; (3) would utilize
surplus water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link, select ‘‘Docket#’’
and follow the instructions. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3372, or TTY, contact
(202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
VerDate Nov<24>2008
18:58 Jan 14, 2009
Jkt 217001
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTESTS’’, and/or
‘‘MOTIONS TO INTERVENE’’, as
applicable, and the Docket Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–706 Filed 1–14–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
January 7, 2009.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC09–35–000.
Applicants: New Harquahala
Generating Co., LLC,MACH Gen, LLC,
New Athens Generating Company, LLC,
Millennium Power Partners, LP,
Strategic Value Partners.
Description: Application of MACH
Gen, LLC, et al. under Section 203 of the
Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106–5086.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
Docket Numbers: EC09–36–000.
Applicants: EDF Development, Inc.,
Constellation Energy Group, Inc.,
Handsome Lake Energy, LLC.
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
2579
Description: Joint Application of EDF
Development, Inc. et al. under Section
203 of the Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106–5090.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
Docket Numbers: EC09–37–000.
Applicants: EDF Development, Inc.,
Constellation Energy Group, Inc., CER
Generation II, LLC.
Description: Joint Application of EDF
Development, Inc. et al. under Section
203 of the Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106–5093.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
Docket Numbers: EC09–38–000.
Applicants: EDF Development, Inc.,
Constellation Energy Group Inc.
Description: Joint Application of EDF
Development, Inc. et al. under Section
203 of the Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106–5095.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
Docket Numbers: EC09–39–000.
Applicants: EDF Development, Inc.,
Constellation Energy Group, Inc.,
Constellation Power Source Generation
LLC.
Description: Joint Application of EDF
Development, Inc. et al. under Section
203 of Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106–5096
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
Docket Numbers: EC09–40–000.
Applicants: EDF Development, Inc.,
Constellation Energy Group, Inc.,
Constellation Energy Nuclear Group,
LLC.
Description: Joint Application of EDF
Development, Inc. et al. under Section
203 of Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106–5097
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
Docket Numbers: EC09–41–000.
Applicants: EDF Development, Inc.,
Constellation Energy Group, Inc.,
Constellation Power Source Generation
LLC.
Description: Joint Application of EDF
Development, Inc. under Section 203 of
the Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106–5098.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
Docket Numbers: EC09–42–000.
Applicants: EDF Development, Inc.,
Constellation Energy Group, Inc.
E:\FR\FM\15JAN1.SGM
15JAN1
jlentini on PROD1PC65 with NOTICES
2580
Federal Register / Vol. 74, No. 10 / Thursday, January 15, 2009 / Notices
Description: Joint Application of EDF
Development, Inc. under Section 203 of
Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106–5099.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
Docket Numbers: EC09–43–000.
Applicants: EDF Development, Inc.,
Constellation Energy Group, Inc.
Description: Joint Application of EDF
Development, Inc., et al. for
Authorization Under Section 203 of the
Federal Power Act and Request for
Expedited Treatment.
Filed Date: 01/06/2009.
Accession Number: 20090106–5120.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
Docket Numbers: EC09–44–000.
Applicants: EDF Development, Inc.,
Constellation Energy Group, Inc.,
Constellation Power Source Generation
LLC.
Description: Joint Application of EDF
Development, Inc., et al. for
Authorization Under Section 203 of the
Federal Power Act and Request for
Expedited Treatment.
Filed Date: 01/06/2009.
Accession Number: 20090106–5121
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
Docket Numbers: EC09–45–000.
Applicants: EDF Development, Inc.,
Constellation Energy Group, Inc.
Description: Joint Application of EDF
Development, Inc., et al. for
Authorization Under Section 203 of the
Federal Power Act and Request for
Expedited Treatment.
Filed Date: 01/06/2009.
Accession Number: 20090106–5122.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
Docket Numbers: EC09–46–000.
Applicants: EDF Development, Inc.,
Constellation Energy Group, Inc.,
Constellation Power Source Generation
LLC.
Description: Joint Application of EDF
Development, Inc., et al. for
Authorization Under Section 203 of the
Federal Power Act and Request for
Expedited Treatment.
Filed Date: 01/06/2009.
Accession Number: 20090106–5123.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 27, 2009.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER00–3614–011.
Applicants: BP Energy Company.
Description: BP Energy Company
submits an updated market power
analysis.
Filed Date: 12/22/2008.
VerDate Nov<24>2008
18:58 Jan 14, 2009
Jkt 217001
Accession Number: 20081222–4003.
Comment Date: 5 p.m. Eastern Time
on Friday, February 20, 2009.
Docket Numbers: ER01–205–033;
ER98–2640–031.
Applicants: Xcel Energy Services Inc.
Description: Northern States Power
Company-Minnesota, and Northern
States Power Company-Wisconsin
submit a Triennial Market Power
Analysis pursuant to Order 697.
Filed Date: 12/22/2008.
Accession Number: 20081229–0153.
Comment Date: 5 p.m. Eastern Time
on Friday, February 20, 2009.
Docket Numbers: ER07–30–002.
Applicants: RC Cape May Holdings,
LLC.
Description: RC Cape May Holdings,
LLC submits Substitute Original Sheet
1&2 to its FERC Electric Tariff, First
Revised Volume 1.
Filed Date: 12/31/2008.
Accession Number: 20090105–0145.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 21, 2009.
Docket Numbers: ER09–474–000.
Applicants: PowerSmith Cogeneration
Project Limited.
Description: PowerSmith
Cogeneration Project, Limited
Partnership submits an Application for
Market-Based Rate Authorization and
Request for Waivers and Blanket
Approvals.
Filed Date: 12/31/2008.
Accession Number: 20090105–0006.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 21, 2009.
Docket Numbers: ER09–475–000.
Applicants: Simpson Tacoma Kraft
Company, LLC.
Description: Simpson Tacoma Kraft
Company, LLC submits Public Petition
for Acceptance of Initial Tariff Waivers
and Blanket Authority.
Filed Date: 12/31/2008.
Accession Number: 20090106–0081.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 21, 2009.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
Time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–701 Filed 1–14–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance at Midwest ISO Meetings
January 8, 2009.
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and
Commission staff may attend the
following Midwest ISO-related meetings
in 2009:
• Advisory Committee (10 a.m.–3
p.m., ET).
• January 14.
• February 18.
• March 18.
• May 20.
• June 17.
• July 15.
E:\FR\FM\15JAN1.SGM
15JAN1
Agencies
[Federal Register Volume 74, Number 10 (Thursday, January 15, 2009)]
[Notices]
[Pages 2579-2580]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-701]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
January 7, 2009.
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC09-35-000.
Applicants: New Harquahala Generating Co., LLC,MACH Gen, LLC, New
Athens Generating Company, LLC, Millennium Power Partners, LP,
Strategic Value Partners.
Description: Application of MACH Gen, LLC, et al. under Section 203
of the Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106-5086.
Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
Docket Numbers: EC09-36-000.
Applicants: EDF Development, Inc., Constellation Energy Group,
Inc., Handsome Lake Energy, LLC.
Description: Joint Application of EDF Development, Inc. et al.
under Section 203 of the Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106-5090.
Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
Docket Numbers: EC09-37-000.
Applicants: EDF Development, Inc., Constellation Energy Group,
Inc., CER Generation II, LLC.
Description: Joint Application of EDF Development, Inc. et al.
under Section 203 of the Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106-5093.
Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
Docket Numbers: EC09-38-000.
Applicants: EDF Development, Inc., Constellation Energy Group Inc.
Description: Joint Application of EDF Development, Inc. et al.
under Section 203 of the Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106-5095.
Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
Docket Numbers: EC09-39-000.
Applicants: EDF Development, Inc., Constellation Energy Group,
Inc., Constellation Power Source Generation LLC.
Description: Joint Application of EDF Development, Inc. et al.
under Section 203 of Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106-5096
Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
Docket Numbers: EC09-40-000.
Applicants: EDF Development, Inc., Constellation Energy Group,
Inc., Constellation Energy Nuclear Group, LLC.
Description: Joint Application of EDF Development, Inc. et al.
under Section 203 of Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106-5097
Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
Docket Numbers: EC09-41-000.
Applicants: EDF Development, Inc., Constellation Energy Group,
Inc., Constellation Power Source Generation LLC.
Description: Joint Application of EDF Development, Inc. under
Section 203 of the Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106-5098.
Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
Docket Numbers: EC09-42-000.
Applicants: EDF Development, Inc., Constellation Energy Group, Inc.
[[Page 2580]]
Description: Joint Application of EDF Development, Inc. under
Section 203 of Federal Power Act.
Filed Date: 01/06/2009.
Accession Number: 20090106-5099.
Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
Docket Numbers: EC09-43-000.
Applicants: EDF Development, Inc., Constellation Energy Group, Inc.
Description: Joint Application of EDF Development, Inc., et al. for
Authorization Under Section 203 of the Federal Power Act and Request
for Expedited Treatment.
Filed Date: 01/06/2009.
Accession Number: 20090106-5120.
Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
Docket Numbers: EC09-44-000.
Applicants: EDF Development, Inc., Constellation Energy Group,
Inc., Constellation Power Source Generation LLC.
Description: Joint Application of EDF Development, Inc., et al. for
Authorization Under Section 203 of the Federal Power Act and Request
for Expedited Treatment.
Filed Date: 01/06/2009.
Accession Number: 20090106-5121
Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
Docket Numbers: EC09-45-000.
Applicants: EDF Development, Inc., Constellation Energy Group, Inc.
Description: Joint Application of EDF Development, Inc., et al. for
Authorization Under Section 203 of the Federal Power Act and Request
for Expedited Treatment.
Filed Date: 01/06/2009.
Accession Number: 20090106-5122.
Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
Docket Numbers: EC09-46-000.
Applicants: EDF Development, Inc., Constellation Energy Group,
Inc., Constellation Power Source Generation LLC.
Description: Joint Application of EDF Development, Inc., et al. for
Authorization Under Section 203 of the Federal Power Act and Request
for Expedited Treatment.
Filed Date: 01/06/2009.
Accession Number: 20090106-5123.
Comment Date: 5 p.m. Eastern Time on Tuesday, January 27, 2009.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER00-3614-011.
Applicants: BP Energy Company.
Description: BP Energy Company submits an updated market power
analysis.
Filed Date: 12/22/2008.
Accession Number: 20081222-4003.
Comment Date: 5 p.m. Eastern Time on Friday, February 20, 2009.
Docket Numbers: ER01-205-033; ER98-2640-031.
Applicants: Xcel Energy Services Inc.
Description: Northern States Power Company-Minnesota, and Northern
States Power Company-Wisconsin submit a Triennial Market Power Analysis
pursuant to Order 697.
Filed Date: 12/22/2008.
Accession Number: 20081229-0153.
Comment Date: 5 p.m. Eastern Time on Friday, February 20, 2009.
Docket Numbers: ER07-30-002.
Applicants: RC Cape May Holdings, LLC.
Description: RC Cape May Holdings, LLC submits Substitute Original
Sheet 1&2 to its FERC Electric Tariff, First Revised Volume 1.
Filed Date: 12/31/2008.
Accession Number: 20090105-0145.
Comment Date: 5 p.m. Eastern Time on Wednesday, January 21, 2009.
Docket Numbers: ER09-474-000.
Applicants: PowerSmith Cogeneration Project Limited.
Description: PowerSmith Cogeneration Project, Limited Partnership
submits an Application for Market-Based Rate Authorization and Request
for Waivers and Blanket Approvals.
Filed Date: 12/31/2008.
Accession Number: 20090105-0006.
Comment Date: 5 p.m. Eastern Time on Wednesday, January 21, 2009.
Docket Numbers: ER09-475-000.
Applicants: Simpson Tacoma Kraft Company, LLC.
Description: Simpson Tacoma Kraft Company, LLC submits Public
Petition for Acceptance of Initial Tariff Waivers and Blanket
Authority.
Filed Date: 12/31/2008.
Accession Number: 20090106-0081.
Comment Date: 5 p.m. Eastern Time on Wednesday, January 21, 2009.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern Time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-701 Filed 1-14-09; 8:45 am]
BILLING CODE 6717-01-P