Federal Register / Vol. 74, No. 7 / Monday, January 12, 2009 / Notices
Cities) submits an amendment to the
Transmission Control Agreement and
Participating Transmission Owners.
Filed Date: 12/23/2008.
Accession Number: 20081229–0106.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 13, 2009.
Docket Numbers: ER09–463–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc submits an executed Large Generator
Interconnection Agreement with
Southwestern Public Service Co.
Filed Date: 12/23/2008.
Accession Number: 20081229–0105.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 13, 2009.
Docket Numbers: ER09–464–000.
Applicants: PEAK Capital
Management, LLC.
Description: Peak Capital
Management, LLC submits notice of
cancellation of its FERC Electric Tariff,
Original Volume 1.
Filed Date: 12/23/2008.
Accession Number: 20081229–0104.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 13, 2009.
Docket Numbers: ER09–465–000.
Applicants: American Electric Power
Service Corporation.
Description: AEP Operating
Companies submits a second revision to
the Interconnection and Local Delivery
Service Agreement 1428 between the
Village of Shiloh and AEP.
Filed Date: 12/23/2008.
Accession Number: 20081229–0103.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 13, 2009.
Docket Numbers: ER09–466–000.
Applicants: New York Independent
System Operator, Inc.
Description: New York Independent
System Operator, Inc submits tariff
revisions to its Market Administration
and Control Area Services Tariff and its
Open Access Transmission Tariff etc.
Filed Date: 12/23/2008.
Accession Number: 20081229–0102.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 13, 2009.
Docket Numbers: ER09–467–000.
Applicants: ISO New England Inc.
Description: ISO New England, Inc
submits their Forward Capacity Auction
Results Filing.
Filed Date: 12/23/2008.
Accession Number: 20081229–0101.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 13, 2009.
Docket Numbers: ER09–468–000.
Applicants: Midwest Independent
Transmission System.
Description: Midwest Independent
Transmission System Operator, Inc et
VerDate Nov<24>2008
20:34 Jan 09, 2009
Jkt 217001
al. submits proposed revisions to their
Joint Operating Agreement and
Congestion Management Process as part
of the RTOs’ 2008 initiative to update
their JOA.
Filed Date: 12/19/2008.
Accession Number: 20081229–0100.
Comment Date: 5 p.m. Eastern Time
on Friday, January 09, 2009.
Docket Numbers: ER09–469–000.
Applicants: Midwest Independent
Transmission System.
Description: Midwest Independent
Transmission System Operator, Inc et
al. submit revisions to their Joint
Operating Agreement and Congestion
Management Process as part of the
RTOs’ 2008 initiative to update their
JOA.
Filed Date: 12/19/2008.
Accession Number: 20081229–0099.
Comment Date: 5 p.m. Eastern Time
on Friday, January 9, 2009.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR08–4–003.
Applicants: North American Electric
Reliability Corp.
Description: Compliance Filing of the
North American Electric Reliability
Corporation in Response to Paragraph
76 of the Order on Rehearing and
Clarification and Accepting Compliance
Filing.
Filed Date: 12/19/2008.
Accession Number: 20081219–5161.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 21, 2009.
Docket Numbers: RR08–4–004.
Applicants: North American Electric
Reliability Corp.
Description: Compliance Filing of the
North American Electric Reliability
Corporation in Response to Paragraph
47 of the Order on Violation Severity
Levels Proposed by the Electric
Reliability Organization.
Filed Date: 12/19/2008.
Accession Number: 20081219–5162.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 21, 2009.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
1209
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–304 Filed 1–9–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 9988–015]
Augusta Canal Authority; Notice of
Availability of Environmental
Assessment
January 6, 2009.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR Part
380 (Order No. 486, 52 FR 47897), the
Office of Energy Projects has reviewed
the application for a subsequent license
for the 2.125-megawatt King Mill
Project, located on the Augusta Canal in
E:\FR\FM\12JAN1.SGM
12JAN1
1210
Federal Register / Vol. 74, No. 7 / Monday, January 12, 2009 / Notices
Richmond County, Augusta, Georgia,
and issued an Environmental
Assessment (EA) on December 11, 2008.
In the EA, Commission staff analyze the
potential environmental effects of
relicensing the project and conclude
that issuing a subsequent license for the
project, with appropriate environmental
measures, would not constitute a major
federal action significantly affecting the
quality of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access documents. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Comments on the EA should be filed
within 30 days from the issuance date
of this notice, and should be addressed
to the Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Room 1–A, Washington, DC
20426. Please affix King Mill Project No.
9988–015 to all comments. Comments
may be filed electronically via Internet
in lieu of paper. The Commission
strongly encourages electronic filings.
See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the eFiling link. For further
information, contact Sarah Florentino at
(202) 502–6863.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–332 Filed 1–9–09; 8:45 am]
18 of the Code of Federal Regulations,
18 CFR Part 45 (2008), and Commission
Order No. 664 (2005).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on January 23, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–254 Filed 1–9–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket No. ID–5948–000]
Forsee, Gary D.; Notice of Filing
sroberts on PROD1PC70 with NOTICES
January 5, 2009.
Take notice that on January 2, 2009,
Gary D. Foresee submitted for filing, an
application for authority to hold
interlocking positions, pursuant to
section 305(b) of the Federal Power Act,
16 U.S.C. 825d(b)(2008), Part 45 of Title
VerDate Nov<24>2008
20:34 Jan 09, 2009
Jkt 217001
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2179–042]
Merced Irrigation District; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
Commencement of Licensing
Proceeding, and Scoping; Request for
Comments on the Pad and Scoping
Document, and Identification of Issues
and Associated Study Requests
January 5, 2009.
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Licensing
Proceeding.
b. Project No.: 2179–042.
c. Dated Filed: January 5, 2009.
d. Submitted By: Merced Irrigation
District.
e. Name of Project: Merced River
Hydroelectric.
f. Location: On the Merced River in
Mariposa County, California, about 23
miles northeast of the City of Merced.
The project occupies 2,941.84 acres of
United States lands under the
jurisdiction of the Bureau of Land
Management.
g. Filed Pursuant to: 18 CFR Part 5 of
the Commission’s Regulations.
h. Potential Applicant Contact: Mr.
Dan Pope, General Manager, Merced
Irrigation District, P.O. Box 2288,
Merced, CA 95344, Attn. Dan Pope.
i. FERC Contact: Matt Buhyoff at (202)
502–6824 or e-mail at
matt.buhyoff@ferc.gov.
j. We are asking federal, state, local,
and tribal agencies with jurisdiction
and/or special expertise with respect to
environmental issues to cooperate with
us in the preparation of the
environmental document. Agencies who
would like to request cooperating status
should follow the instructions for filing
comments described in paragraph o
below. Cooperating agencies should
note the Commission’s policy that
agencies that cooperate in the
preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402 and (b) the State Historic
Preservation Officer, as required by
Section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 74, Number 7 (Monday, January 12, 2009)]
[Notices]
[Pages 1209-1210]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-332]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9988-015]
Augusta Canal Authority; Notice of Availability of Environmental
Assessment
January 6, 2009.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR Part
380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has
reviewed the application for a subsequent license for the 2.125-
megawatt King Mill Project, located on the Augusta Canal in
[[Page 1210]]
Richmond County, Augusta, Georgia, and issued an Environmental
Assessment (EA) on December 11, 2008. In the EA, Commission staff
analyze the potential environmental effects of relicensing the project
and conclude that issuing a subsequent license for the project, with
appropriate environmental measures, would not constitute a major
federal action significantly affecting the quality of the human
environment.
A copy of the EA is on file with the Commission and is available
for public inspection. The EA may also be viewed on the Commission's
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access documents. For assistance, contact FERC Online Support
at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for
TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Comments on the EA should be filed within 30 days from the issuance
date of this notice, and should be addressed to the Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Room 1-A,
Washington, DC 20426. Please affix King Mill Project No. 9988-015 to
all comments. Comments may be filed electronically via Internet in lieu
of paper. The Commission strongly encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site under the eFiling link. For further information, contact Sarah
Florentino at (202) 502-6863.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-332 Filed 1-9-09; 8:45 am]