Download as PDF sroberts on PROD1PC70 with NOTICES Federal Register / Vol. 74, No. 7 / Monday, January 12, 2009 / Notices Cities) submits an amendment to the Transmission Control Agreement and Participating Transmission Owners. Filed Date: 12/23/2008. Accession Number: 20081229–0106. Comment Date: 5 p.m. Eastern Time on Tuesday, January 13, 2009. Docket Numbers: ER09–463–000. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc submits an executed Large Generator Interconnection Agreement with Southwestern Public Service Co. Filed Date: 12/23/2008. Accession Number: 20081229–0105. Comment Date: 5 p.m. Eastern Time on Tuesday, January 13, 2009. Docket Numbers: ER09–464–000. Applicants: PEAK Capital Management, LLC. Description: Peak Capital Management, LLC submits notice of cancellation of its FERC Electric Tariff, Original Volume 1. Filed Date: 12/23/2008. Accession Number: 20081229–0104. Comment Date: 5 p.m. Eastern Time on Tuesday, January 13, 2009. Docket Numbers: ER09–465–000. Applicants: American Electric Power Service Corporation. Description: AEP Operating Companies submits a second revision to the Interconnection and Local Delivery Service Agreement 1428 between the Village of Shiloh and AEP. Filed Date: 12/23/2008. Accession Number: 20081229–0103. Comment Date: 5 p.m. Eastern Time on Tuesday, January 13, 2009. Docket Numbers: ER09–466–000. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc submits tariff revisions to its Market Administration and Control Area Services Tariff and its Open Access Transmission Tariff etc. Filed Date: 12/23/2008. Accession Number: 20081229–0102. Comment Date: 5 p.m. Eastern Time on Tuesday, January 13, 2009. Docket Numbers: ER09–467–000. Applicants: ISO New England Inc. Description: ISO New England, Inc submits their Forward Capacity Auction Results Filing. Filed Date: 12/23/2008. Accession Number: 20081229–0101. Comment Date: 5 p.m. Eastern Time on Tuesday, January 13, 2009. Docket Numbers: ER09–468–000. Applicants: Midwest Independent Transmission System. Description: Midwest Independent Transmission System Operator, Inc et VerDate Nov<24>2008 20:34 Jan 09, 2009 Jkt 217001 al. submits proposed revisions to their Joint Operating Agreement and Congestion Management Process as part of the RTOs’ 2008 initiative to update their JOA. Filed Date: 12/19/2008. Accession Number: 20081229–0100. Comment Date: 5 p.m. Eastern Time on Friday, January 09, 2009. Docket Numbers: ER09–469–000. Applicants: Midwest Independent Transmission System. Description: Midwest Independent Transmission System Operator, Inc et al. submit revisions to their Joint Operating Agreement and Congestion Management Process as part of the RTOs’ 2008 initiative to update their JOA. Filed Date: 12/19/2008. Accession Number: 20081229–0099. Comment Date: 5 p.m. Eastern Time on Friday, January 9, 2009. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR08–4–003. Applicants: North American Electric Reliability Corp. Description: Compliance Filing of the North American Electric Reliability Corporation in Response to Paragraph 76 of the Order on Rehearing and Clarification and Accepting Compliance Filing. Filed Date: 12/19/2008. Accession Number: 20081219–5161. Comment Date: 5 p.m. Eastern Time on Wednesday, January 21, 2009. Docket Numbers: RR08–4–004. Applicants: North American Electric Reliability Corp. Description: Compliance Filing of the North American Electric Reliability Corporation in Response to Paragraph 47 of the Order on Violation Severity Levels Proposed by the Electric Reliability Organization. Filed Date: 12/19/2008. Accession Number: 20081219–5162. Comment Date: 5 p.m. Eastern Time on Wednesday, January 21, 2009. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 1209 protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–304 Filed 1–9–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 9988–015] Augusta Canal Authority; Notice of Availability of Environmental Assessment January 6, 2009. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for a subsequent license for the 2.125-megawatt King Mill Project, located on the Augusta Canal in E:\FR\FM\12JAN1.SGM 12JAN1 1210 Federal Register / Vol. 74, No. 7 / Monday, January 12, 2009 / Notices Richmond County, Augusta, Georgia, and issued an Environmental Assessment (EA) on December 11, 2008. In the EA, Commission staff analyze the potential environmental effects of relicensing the project and conclude that issuing a subsequent license for the project, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access documents. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Comments on the EA should be filed within 30 days from the issuance date of this notice, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1–A, Washington, DC 20426. Please affix King Mill Project No. 9988–015 to all comments. Comments may be filed electronically via Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the eFiling link. For further information, contact Sarah Florentino at (202) 502–6863. Kimberly D. Bose, Secretary. [FR Doc. E9–332 Filed 1–9–09; 8:45 am] 18 of the Code of Federal Regulations, 18 CFR Part 45 (2008), and Commission Order No. 664 (2005). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on January 23, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–254 Filed 1–9–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission [Docket No. ID–5948–000] Forsee, Gary D.; Notice of Filing sroberts on PROD1PC70 with NOTICES January 5, 2009. Take notice that on January 2, 2009, Gary D. Foresee submitted for filing, an application for authority to hold interlocking positions, pursuant to section 305(b) of the Federal Power Act, 16 U.S.C. 825d(b)(2008), Part 45 of Title VerDate Nov<24>2008 20:34 Jan 09, 2009 Jkt 217001 PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2179–042] Merced Irrigation District; Notice of Intent To File License Application, Filing of Pre-Application Document, Commencement of Licensing Proceeding, and Scoping; Request for Comments on the Pad and Scoping Document, and Identification of Issues and Associated Study Requests January 5, 2009. a. Type of Filing: Notice of Intent to File License Application for a New License and Commencing Licensing Proceeding. b. Project No.: 2179–042. c. Dated Filed: January 5, 2009. d. Submitted By: Merced Irrigation District. e. Name of Project: Merced River Hydroelectric. f. Location: On the Merced River in Mariposa County, California, about 23 miles northeast of the City of Merced. The project occupies 2,941.84 acres of United States lands under the jurisdiction of the Bureau of Land Management. g. Filed Pursuant to: 18 CFR Part 5 of the Commission’s Regulations. h. Potential Applicant Contact: Mr. Dan Pope, General Manager, Merced Irrigation District, P.O. Box 2288, Merced, CA 95344, Attn. Dan Pope. i. FERC Contact: Matt Buhyoff at (202) 502–6824 or e-mail at matt.buhyoff@ferc.gov. j. We are asking federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues to cooperate with us in the preparation of the environmental document. Agencies who would like to request cooperating status should follow the instructions for filing comments described in paragraph o below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001). k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402 and (b) the State Historic Preservation Officer, as required by Section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. E:\FR\FM\12JAN1.SGM 12JAN1

Agencies

[Federal Register Volume 74, Number 7 (Monday, January 12, 2009)]
[Notices]
[Pages 1209-1210]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-332]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 9988-015]


Augusta Canal Authority; Notice of Availability of Environmental 
Assessment

January 6, 2009.
    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's regulations, 18 CFR Part 
380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has 
reviewed the application for a subsequent license for the 2.125-
megawatt King Mill Project, located on the Augusta Canal in

[[Page 1210]]

Richmond County, Augusta, Georgia, and issued an Environmental 
Assessment (EA) on December 11, 2008. In the EA, Commission staff 
analyze the potential environmental effects of relicensing the project 
and conclude that issuing a subsequent license for the project, with 
appropriate environmental measures, would not constitute a major 
federal action significantly affecting the quality of the human 
environment.
    A copy of the EA is on file with the Commission and is available 
for public inspection. The EA may also be viewed on the Commission's 
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access documents. For assistance, contact FERC Online Support 
at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for 
TTY, (202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    Comments on the EA should be filed within 30 days from the issuance 
date of this notice, and should be addressed to the Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Room 1-A, 
Washington, DC 20426. Please affix King Mill Project No. 9988-015 to 
all comments. Comments may be filed electronically via Internet in lieu 
of paper. The Commission strongly encourages electronic filings. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site under the eFiling link. For further information, contact Sarah 
Florentino at (202) 502-6863.

Kimberly D. Bose,
Secretary.