PacifiCorp; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 1203 [E9-248]
Download as PDF
Federal Register / Vol. 74, No. 7 / Monday, January 12, 2009 / Notices
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Motions to intervene, protests and
comments may be filed electronically
via the internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: January 27, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–338 Filed 1–9–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Project Nos. 935–090; 2071–041; 2111–037]
PacifiCorp; Notice of Application for
Amendment of License and Soliciting
Comments, Motions To Intervene, and
Protests
sroberts on PROD1PC70 with NOTICES
January 5, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Shoreline
Management Plan (SMP).
b. Project Nos: 935–090, 2071–041,
2111–037.
c. Date Filed: December 18, 2008.
d. Applicant: PacifiCorp.
e. Name of Projects: Merwin, Yale,
and Swift No. 1 Hydroelectric Projects.
f. Location: The Merwin and Yale
Hydroelectric Projects are located on the
North Fork Lewis River in Cowlitz and
Clark Counties, Washington, and the
Swift No. 1 Hydroelectric Project is
located on the North Fork Lewis River
in Cowlitz and Skamania Counties,
Washington.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Todd Olsen,
PacifiCorp, 825 NE. Multnomah, Suite
1500, Portland, OR 97232, (503) 813–
6657.
i. FERC Contact: Shana High, (202)
502–8674.
VerDate Nov<24>2008
20:34 Jan 09, 2009
Jkt 217001
j. Deadline for filing comments,
motions to intervene, and protest:
February 6, 2009. All documents
(original and eight copies) should be
filed with: Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: PacifiCorp
filed a shoreline management plan for
the Merwin, Yale, and Swift No. 1
Hydroelectric Projects (known as the
Lewis River Hydroelectric Projects). The
SMP applies to the reservoir shorelines
of the Lewis River Hydroelectric
Projects, and provides for the
management these shorelines.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
1203
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–248 Filed 1–9–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–38–000]
Transcontinental Gas Pipe Line
Corporation; Copano Field Services/
Central Gulf Coast, L.P.; Notice of
Application
January 6, 2009.
Take notice that on December 19,
2008, Transcontinental Gas Pipe Line
Corporation (Transco), PO Box 1396,
Houston, Texas 77251–1396 and
Copano Field Services/Central Gulf
Coast, L.P. (Copano), 2727 Allen
Parkway, Suite 1200, Houston, Texas
77019, filed in Docket No. CP09–38–000
an application pursuant to section 7(b)
of the Natural Gas Act (NGA) requesting
that the Commission grant Transco
approval to abandon by sale to Copano
certain natural gas pipelines facilities in
South Texas, including the McMullen
Lateral. Additionally, Copano requests
that the Commission finds that such
facilities will perform gathering
function upon their abandonment by
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 74, Number 7 (Monday, January 12, 2009)]
[Notices]
[Page 1203]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-248]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Project Nos. 935-090; 2071-041; 2111-037]
PacifiCorp; Notice of Application for Amendment of License and
Soliciting Comments, Motions To Intervene, and Protests
January 5, 2009.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Shoreline Management Plan (SMP).
b. Project Nos: 935-090, 2071-041, 2111-037.
c. Date Filed: December 18, 2008.
d. Applicant: PacifiCorp.
e. Name of Projects: Merwin, Yale, and Swift No. 1 Hydroelectric
Projects.
f. Location: The Merwin and Yale Hydroelectric Projects are located
on the North Fork Lewis River in Cowlitz and Clark Counties,
Washington, and the Swift No. 1 Hydroelectric Project is located on the
North Fork Lewis River in Cowlitz and Skamania Counties, Washington.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Todd Olsen, PacifiCorp, 825 NE. Multnomah,
Suite 1500, Portland, OR 97232, (503) 813-6657.
i. FERC Contact: Shana High, (202) 502-8674.
j. Deadline for filing comments, motions to intervene, and protest:
February 6, 2009. All documents (original and eight copies) should be
filed with: Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervener files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
k. Description of Request: PacifiCorp filed a shoreline management
plan for the Merwin, Yale, and Swift No. 1 Hydroelectric Projects
(known as the Lewis River Hydroelectric Projects). The SMP applies to
the reservoir shorelines of the Lewis River Hydroelectric Projects, and
provides for the management these shorelines.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filings must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable,
and the Project Number of the particular application to which the
filing refers.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-248 Filed 1-9-09; 8:45 am]
BILLING CODE 6717-01-P