Notice of Quarterly Report (July 1, 2008-September 30, 2008), 952-963 [E9-181]

Download as PDF 952 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices application, or, if the applicant is approved to the VPP, subsequent cessation of active participation in the VPP. b. Upon approval, VPP participants will continue to be removed from OSHA inspection lists for the duration of approved participation. c. Removal from OSHA programmed inspection lists does not apply to a corporate headquarters or DGA headquarters unless these locations have applied or been approved for sitebased participation. 2. Unprogrammed Inspections a. Workplace complaints to OSHA, all fatalities and catastrophes, and other significant events will be handled by enforcement personnel in accordance with normal OSHA enforcement procedures. b. The history of the VPP demonstrates that safety and health problems discovered during any contact with VPP participants normally are resolved cooperatively. Nevertheless, OSHA must reserve the right, where employees’ safety and health are seriously endangered and management refuses to correct the situation, to refer the situation to the Assistant Secretary for review and enforcement action. The employer will be informed that a referral will be made to the Assistant Secretary and that enforcement action may result. MILLENNIUM CHALLENGE CORPORATION 3. Additional VPP Investigations a. Following significant events, e.g., fatalities, chemical spills or leaks, or other accidents, OSHA may choose to use VPP personnel to conduct an onsite review to determine a participant’s continued eligibility for VPP. b. OSHA also may choose to investigate other significant accidents or events that come to its attention and that are not required to be handled with normal OSHA enforcement procedures, whether or not injury/illness is involved. OSHA will use VPP personnel to determine whether the accident or incident reflects a serious deficiency in the participant’s safety and health management system that warrants reevaluation of the participant’s VPP qualification. [MCC 09–05] Authority: The Occupational Safety and Health Act of 1970, 29 U.S.C. 651 et seq. Signed at Washington, DC, this 5th day of January, 2009. Thomas M. Stohler, Acting Assistant Secretary of Labor for Occupational Safety and Health. [FR Doc. E9–165 Filed 1–8–09; 8:45 am] Notice of Quarterly Report (July 1, 2008–September 30, 2008) AGENCY: Millennium Challenge Corporation. SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for the quarter July 1, 2008 through September 30, 2008 in respect to both assistance provided under Section 605 of the Millennium Challenge Act of 2003 (Pub. L. 108–199, Division D (the Act)), and transfers or allocations of funds to other federal agencies pursuant to Section 619(b) of the Act. The following report shall be made available to the public by means of publication in the Federal Register and on the Internet Web site of the MCC (https://www.mcc.gov) in accordance with Section 612(b) of the Act. BILLING CODE 4510–26–P ASSISTANCE PROVIDED UNDER SECTION 605 Projects Obligated Objectives Cumulative disbursements Country: Madagascar Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Madagascar Total obligation: $109,773,000 Total quarterly disbursement: $12,296,269 $37,803,000 Increase Land Titling and Security. $15,491,326 Finance Project ................ mstockstill on PROD1PC66 with NOTICES Land Tenure Project ........ $35,888,000 Increase Competition in the Financial Sector. $11,298,895 VerDate Nov<24>2008 17:55 Jan 08, 2009 Jkt 217001 PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 Measures Legislative proposal reflecting the National Land Tenure Program submitted to Parliament and passed. Number of land disputes reported and resolved in the target zones and sites of implementation. Percentage of land documents inventoried, restored, and/or digitized. Average time and cost required to carry out property transactions. Percent of reported land conflicts resolved on titled land in zone 3, 4, 5 during the title regularization operations. Percentage of land in the zones that is demarcated and ready for titling. The number of savings accounts and outstanding value of accounts from primary banks. Maximum check clearing delay. Volume of funds in payment system and number of transactions. Increased public awareness of new financial instruments as measured by surveys within intervention zones and large towns. The amount of government debt issued with maturities in excess of 52 weeks. The number of new individual investors buying government debt securities. The number of bank branches of the Central Bank of Madagascar capable of accepting auction tenders. E:\FR\FM\09JAN1.SGM 09JAN1 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices 953 ASSISTANCE PROVIDED UNDER SECTION 605—Continued Projects Obligated Objectives Cumulative disbursements Agricultural Business Investment Project. $17,683,000 Improve Agricultural Projection Technologies and Market Capacity in Rural Areas. $8,923,689 Program Administration * and Control, Monitoring and Evaluation. Pending subsequent reports **. $18,399,000 ......................................... ......................................... Percentage of all loans included in the central database. Number of rural producers receiving or soliciting information from Agricultural Business Centers about the opportunities. Intervention zones identified and description of beneficiaries within each zone submitted. Number of visitors receiving information from National Coordinating Center with respect to business opportunities. Change in farm income due to improved production and marketing practices. Change in enterprise income due to improved production and marketing practices. Number of farmers and business employing technical assistance received. $10,483,218 .......................... Measures $12,654,499 * Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment. ** These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such in subsequent quarterly report(s). Projects Obligated Objective Cumulative disbursements Country: Honduras Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Honduras Rural Development Project. $70,687,000 Transportation Project ..... $127,491,876 Program Administration * and Control, Monitoring and Evaluation. Pending subsequent reports **. Increase the productivity and business skills of farmers who operate small and medium-size farms and their employees.. Total obligation: $215,000,000 Total quarterly disbursement: $13,479,730 $21,844,528 $8,329,169 $16,821,124 Reduce transportation costs between targeted production centers and national, regional and global markets. ......................................... .......................... ......................................... Obligated Objectives Increase in employment income resulting from Rural Development Project. Number of Program farmers harvesting high-value horticulture crops. Number of hectares harvesting high-value horticulture crops. Freight shipment cost from Tegucigalpa to Puerto Cortes. Price of basic food basket. Number of days per year road is passable. $3,994,766 Cumulative disbursements Country: Cape Verde Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Cape Verde Watershed and Agricultural Support. mstockstill on PROD1PC66 with NOTICES Increase in farm income resulting from Rural Development Project. Funds lent by MCA-Honduras to financial institutions. $776,067 Projects VerDate Nov<24>2008 Measures 17:55 Jan 08, 2009 $10,848,630 Jkt 217001 Increase agricultural production in three targeted watershed areas on three islands. PO 00000 Frm 00079 Fmt 4703 Measures Total obligation: $110,078,488 Total quarterly disbursement: $9,450,397 $3,541,205 Sfmt 4703 Increase in horticultural productivity. Increase in annual income. Value-added for farms and agribusiness. E:\FR\FM\09JAN1.SGM 09JAN1 954 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices Projects Obligated Objectives Cumulative disbursements Infrastructure Improvement. $83,160,208 Increase integration of the internal market and reduce transportation costs. $16,923,184 Private Sector Development. $2,800,000 $356,711 $13,269,650 Spur private sector development on all islands through increased investment in the priority sectors and through financial sector reform. ......................................... $6,218,097 .......................... ......................................... 0 Obligated Objective Program Administration * and Control, Monitoring and Evaluation. Pending subsequent reports **. Projects Property Regularization Project. Volume of goods shipped between Praia and other islands. Mobility Ratio: Percentage of beneficiary population who take at least 5 trips per month. Savings on transport costs from improvements. Value added in priority sectors above current trends. Volume of private investment in priority sectors above current trends. Cumulative disbursements Country: Nicaragua Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Nicaragua Measures Total obligation: $174,710,890 Total quarterly disbursement: $ 11,129,188 $22,000,000 Increase Investment by strengthening property rights. $4,669,995 Transportation Project ..... $105,193,200 $32,897,500 Reduce transportation costs between Leon and Chinandega and national, regional and global markets. Increase the value added of farms and enterprises in the region. $8,990,461 Rural Business Development Project. Program Administration *, Due Diligence, Monitoring and Evaluation. Pending subsequent reports **. $14,909,300 ......................................... $6,867,070 .......................... ......................................... $2,129,337 Obligated Objective Projects $11,325,597 Value of investment on land. Value of urban land. Value of rural land. Number of days to conduct a land transaction. Total cost to conduct a land transaction. Price of a basket of goods. Travel Time. Annual percentage increase in value-added of clients of business office. Number of jobs created. Number of program farm plots harvesting highervalue crops or reforesting under improvement of Water Supply Activities. Cumulative disbursements Country: Georgia Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Georgia Measures Total obligation: $295,300,000 Total quarterly disbursement: $21,853,277 Regional Infrastructure Rehabilitation. $216,600,000 Key Regional Infrastructure Rehabilitated. $45,138,132 Regional Enterprise Development. mstockstill on PROD1PC66 with NOTICES Measures $47,350,000 Enterprises in Regions Developed. $16,230,586 Reduction in Akhalkalaki-Ninotsminda-Teleti journey time. Reduction in vehicle operating costs. Increase in internal regional traffic volumes. Decreased technical losses in gas through the main North-South pipeline Reduction in the production of greenhouse gas emissions measured in tons of CO2 equivalent. Increased collection rate of the Georgian Gas Company (GOGC). Number of household beneficiaries served by Regional Infrastructure Development projects. Actual operations and maintenance expenditures. Increase in annual revenue in portfolio companies. Increase in number of portfolio company employees and number of local suppliers. Increase in portfolio companies’ wages and payments to local suppliers. Jobs created. Increase in aggregate incremental net revenue to project assisted firms. Direct household net income. VerDate Nov<24>2008 17:55 Jan 08, 2009 Jkt 217001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\09JAN1.SGM 09JAN1 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices Projects Obligated Objective Cumulative disbursements 955 Measures Direct household net income for market information initiative beneficiaries. Number of beneficiaries. Program Administration *, Due Diligence, Monitoring and Evaluation. Pending subsequent reports **. $36,100,000 ......................................... $10,630,824 .......................... ......................................... $1,162,968 Obligated Objective Projects Cumulative disbursements Country: Vanuatu Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Vanuatu Total obligation: $65,690,000 Total quarterly disbursement: $9,498,932 Transportation Infrastructure Project. $60,587,816 Facilitate transportation to increase tourism and business development. $188,462 Program Administration *, Due Diligence, Monitoring and Evaluation. Pending subsequent reports **. $5,074,768 ......................................... $19,844,963 .......................... ......................................... $19,844,963 Obligated Objective Projects Number of Tourists. Number of days per year road is closed. Number of S-W Bay, Malekula flights cancelled per year due to flooding. Vessel wait time at wharf. Cumulative disbursements Country: Armenia Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Armenia Measures Total obligation: $235,650,000 Total quarterly disbursement: $5,030,672 Irrigated Agriculture Project (Agriculture and Water). $145,680,000 Increase agricultural productivity Improve and Quality of Irrigation. $12,015,860 Rural Road Rehabilitation Project. $67,100,000 Better access to economic and social infrastructure. $5,541,926 Program Administration *, Due Diligence, Monitoring and Evaluation. Pending subsequent reports **. $22,870,000 ......................................... $5,411,097 .......................... ......................................... $1,224,709 Obligated Objective Projects Access to Financial Services. VerDate Nov<24>2008 17:55 Jan 08, 2009 $19,650,000 Jkt 217001 Expand Access to Financial Services. PO 00000 Frm 00081 Fmt 4703 Increase in hectares covered by high value added horticultural and fruit crops. Percentage of respondents satisfied with irrigation services. Share of Water User Association water charges as percentage of Water User Association annual operations and maintenance costs. Number of farmers using improved on-farm water management practices. Annual increase in irrigated land in Project area. State budget expenditures on maintenance of irrigation system. Value of loans provided under the project. Government budgetary allocations for routine maintenance of the entire road network Average daily traffic in Project area. Kilometers of Package 1 road sections rehabilitated. Kilometers of Package 2 road sections rehabilitated. Kilometers of Package 3 road sections rehabilitated. Cumulative disbursements Country: Benin Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Benin mstockstill on PROD1PC66 with NOTICES Measures Measures Total obligation: $307,298,040 Total quarterly disbursement: $9,377 $1,737,505 Sfmt 4703 Operational self-sufficiency of participating microfinance institutions. Number of microfinance institutions supervised by the microfinance cellule. Total incremental increase in value of new credit extended and savings received by financial institutions participating in the project. E:\FR\FM\09JAN1.SGM 09JAN1 956 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices Projects Obligated Objective Cumulative disbursements Access to Justice ............. $34,270,000 Improved Ability of Justice System to Enforce Contracts and Reconcile Claims. $1,424,538 Access to Land ................ $36,020,000 Strengthen property rights and increase investment in rural and urban land. $6,417,860 Access to Markets ........... $169,447,000 $47,911,040 Improve Access to Markets through Improvements to the Port of Cotonou. ......................................... Program Administration *, Due Diligence, Monitoring and Evaluation. Pending subsequent reports **. .......................... ......................................... Objective Cumulative disbursements Country: Ghana Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Ghana Measures Total obligation: $547,009,000 Total quarterly disbursement: $10,423,856 Agriculture Project ........... $240,984,001 Enhance Profitability of cultivation, services to agriculture and product handling in support of the expansion of commercial agriculture among groups of smallholder farms. $12,127,070 Rural Development .......... mstockstill on PROD1PC66 with NOTICES Total value of additional investments in target urban land parcels. Total metric tons of exports and imports passing through Port of Cotonou per year. $933,326 Obligated Share value of all loans outstanding that have one or more installments of principal over 30 days past due. Total number of loans guaranteed by land titles per year. Number of cases processed at the arbitration center. Percentage of all cases in the ‘‘Tribunal de Premiere Instance’’ courts per year. Percentage of all cases resolved in court of appeals per year. Average distance to reach TPI. Number of enterprises registered through the registration center. Average number of days required to register an enterprise. Total value of additional investments in target rural land parcels. $9,554,759 Projects $4,328,427 Measures $101,288,000 Strengthen the rural institutions that provide services complementary to, and supportive of, agricultural and agriculture business development. $973,565 Transportation .................. $143,104,000 Reduce the transportation costs affecting agriculture commerce at sub-regional levels. $1,913,952 Number of hectares irrigated. Number of days to conduct a land transaction. Number of land disputes in the pilot registration districts. Registration of land rights in the pilot registration districts. Metric tons of products passing through post-harvest treatment. Portfolio-at-risk of agriculture loan fund. Value of loans disbursed to clients from agricultural loan fund. Number of additional loans. Vehicle operating costs on minor, medium and major rehabilitated roads. Time/ quality per procurement. Score card of citizen satisfaction with services. Gross enrollment rates. Gender parity in school enrollment. Distance to collect water. Time to collect water. Distance to sanitation facility. Travel time to sanitation facility. Incidence of guinea worm, diarrhea or bilharzias. Average number of days lost due to guinea worm, diarrhea or bilharzias. Percentage of households, schools, and agricultural processing plants in target districts with electricity. Number of inter-bank transactions. Value of deposit accounts in rural banks. Volume capacity ratio. Vehicles per hour at peak hour. Travel time at peak hour. International roughness index. VerDate Nov<24>2008 17:55 Jan 08, 2009 Jkt 217001 PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 E:\FR\FM\09JAN1.SGM 09JAN1 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices Projects Obligated Objective Cumulative disbursements 957 Measures Annual average daily vehicle and passenger traffic. Program Administration *, Due Diligence, Monitoring and Evaluation. Pending subsequent reports **. $61,632,999 ......................................... $10,134,998 .......................... ......................................... $808,368 Obligated Objective Projects Cumulative disbursements Country: El Salvador Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA El Salvador Total obligation: $460,940,000 Total quarterly disbursement: $6,521,093 Human Development Project. $95,073,000 Increase human and physical capital of residents of the Northern Zone to take advantage of employment and business opportunities. $1,172,454 Productive Development Project. $87,466,000 Increase production and employment in the Northern Zone. Reduce travel cost and time within the Northern Zone, with the rest of the country, and within the region. $5,514,266 Connectivity Project ......... $233,560,000 Measures $94,900 Number of students enrolled in the Chalatenango Center functioning as a MEGATEC institute. Graduation rate of students enrolled in the Chalatenango Center functioning as a MEGATEC institute. Number of students enrolled in participating middle technical schools. Graduation rate of students enrolled in participating middle technical schools. Number of students enrolled in non-formal training activities. Graduation rate of students enrolled in non-formal training activities. Number of households with access to water in the Northern Zone. Number of households with access to basic sanitation in the Northern Zone. Number of households with electricity in the Northern Zone. Number of individuals that benefit annually from the strategic infrastructure projects. Investment in productive chains by selected beneficiaries. Weighted average of the International Roughness Index for the rehabilitation of the Transnational Highway. Weighted average of the International Roughness Index for the rehabilitation of the network of connecting roads. Program Administration * and Control, Monitoring and Evaluation. Pending Subsequent Report **. $44,841,000 ......................................... $4,998,673 .......................... ......................................... $703,921 Obligated Objective Projects Cumulative disbursements Country: Mali Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Mali Bamako Senou Airport Improvement Project. mstockstill on PROD1PC66 with NOTICES Industrial Park Project ..... VerDate Nov<24>2008 17:55 Jan 08, 2009 $182,007,541 $2,080,155 Jkt 217001 Establish an independent and secure link to the regional and global economy. Develop a platform for industrial activity to be located within the Airport domain. PO 00000 Frm 00083 Fmt 4703 Measures Total obligation: $460,811,164 Total quarterly disbursement: $1,638,291 $1,377,281 Number of weekly flight arrivals and departures. Average time for passengers to complete departures and arrivals procedures. $2,080,155 Occupancy level. Average number of days required for operator to connect to Industrial Park water and electricity services. Sfmt 4703 E:\FR\FM\09JAN1.SGM 09JAN1 958 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices Projects Obligated Objective Cumulative disbursements Alatona Irrigation Project $234,884,675 Increase the agricultural production and productivity in the Alatona zone of the ON. $436,925 Program Administration * and Control, Monitoring and Evaluation. Pending Subsequent Report **. $41,838,793 ......................................... $6,363,455 .......................... ......................................... $43,016 Obligated Objective Projects Property Rights Project .... $188,378,000 Increase security and capitalization of land assets held by lowerincome Mongolians, and increased periurban herder productivity and incomes. Rail Project ...................... $23,062,286 $25,512,856 Increase employment and income among unemployed and underemployed Mongolians. Measures Total obligation: $284,911,363 Total quarterly disbursement: $1,216,243 $0 Increase rail traffic and shipping efficiency. Vocational Education Project. Weighted average of the International Roughness Index for the rehabilitation of the Niono-Goma Coura road. Annual average daily count of vehicles on the Niono-Goma Coura road. Total amount of land irrigated by the Project in the Alatona zone. Average water volume delivered at the farm level in the Alatona zone. Crop water requirements as a percentage share of water supply at the canal headworks in the Alatona Zone. Number of 5 and 10 hectare farm plots allocated in the Alatona zone. Total market garden parcels allocated in the Alatona zone. Number of titles registered in the land registration office granted to households in the Alatona zone. Number of students enrolled in schools established by the Project. Graduation rate of students enrolled in schools established by the Project. Number of farms adopting at least one new extension technique as a percentage of all farms receiving technical assistance under the Project. Total amount of credit extended in loan portfolios by participating microfinance institutions and banks in the Alatona zone. Number of active clients of microfinance institutions and banks in the Alatona zone. Cumulative disbursements Country: Mongolia Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Mongolia mstockstill on PROD1PC66 with NOTICES Measures $0 $5,000 Immovable property value of hashaa plots. Households accessing bank credit. Hashaa plots directly registered by the Property Rights Project. Income of herder households on long-term lease land. Herd mortality rate. Number of herder groups adopting intensive/semiintensive farm management techniques. Increase in GDP due to rail improvements. Freight turnover. Mine traffic. Percent of wagons leased by private firms. Railway operating ratio. Customer satisfaction. Wagon time to destination. Average locomotive availability. Annual salary. Rate of employment. Non-governmental funding of vocational education. Students completing newly designed long-term programs. Certified vocational education teachers. Percent of active teachers receiving certification training. VerDate Nov<24>2008 17:55 Jan 08, 2009 Jkt 217001 PO 00000 Frm 00084 Fmt 4703 Sfmt 4703 E:\FR\FM\09JAN1.SGM 09JAN1 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices Projects Obligated Health Project .................. Objective $17,027,119 Cumulative disbursements Increase the adoption of behaviors that reduce non-communicable diseases (NCDIs) among target populations and improved medical treatment and control of NCDIs. $16,377 959 Measures Diabetes and hypertension controlled. Cervical cancer prevention. Percentage of cancer cases diagnosed in early stages. Percentage of those with known diagnosis of hypertension/diabetes out of all actual cases in adult population. Women screened for breast and cervical cancer. Counseling for diabetes and hypertension. Program Administration * and Control, Monitoring and Evaluation. Pending subsequent reports **. $30,931,102 ......................................... $1,635,428 .......................... ......................................... $0 Obligated Objective Projects Cumulative disbursements Country: Mozambique Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Mozambique Water and Sanitation Project. Road Rehabilitation Project. Land Tenure Services Project. mstockstill on PROD1PC66 with NOTICES Farmer Income Support Project. $203,585,393 $176,307,480 $39,068,307 $17,882,211 Increase access to reliable and quality water and sanitation facilities. Total obligation: $506,924,053 Total quarterly disbursement: $2,662,982 $0 Increase access to productive resources and markets. $0 Establish efficient, secure land access for households and investors. $0 Improve coconut productivity and diversification into cash crop. Measures $123,900 Value of productive days gained due to less diarrhea, cholera and/or malaria. School attendance days gained due to less diarrhea, cholera and/or malaria. Number (Percent) of businesses with access to improved water source. Reduction in time for rural/urban households to access improved water sources. Number (Percent) of urban households with access to improved water sources. Number (Percent) of rural households with access to improved water sources. Number (Percent) of urban households with access to improved sanitation facilities. Increase in agricultural production among communities affected by road rehabilitation works. Increase in the number of new businesses within 5 km of rehabilitated roads. Reduction in vehicle operating costs as a result of rehabilitated roads. Time savings due to a reduction in time to travel a fixed length of rehabilitated road. Weighted average of the International Roughness Index for the rehabilitation roads. Average annual daily traffic volume on rehabilitated roads disaggregated by vehicle type. Increase (Percent) in value of new investments on land. Number of new businesses. Reduction (Percent) in time to right to land usage. More efficient, free and secure land transfers/transactions. Increase (Percentage) in parcel-holder land value. Reduction (Percent) in costs to right to land usage. Reduction (Percentage) in loss of coconut production and coconut products’ sales. Increased income (Percentage) from sales from intercropping activities to small farm plot holders. Increased number (Percentage) of live coconut trees. Increased productive capacity (Percentage) of coconut trees. VerDate Nov<24>2008 17:55 Jan 08, 2009 Jkt 217001 PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 E:\FR\FM\09JAN1.SGM 09JAN1 960 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices Projects Obligated Program Administration * and Control, Monitoring and Evaluation. Pending Subsequent Report **. Objective Cumulative disbursements $70,924,053 ......................................... $2,670,336 .......................... ......................................... $48,716 Obligated Objective Projects Cumulative disbursements Country: Lesotho Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Lesotho Water Project ................... Health Project .................. $164,027,584 Measures Total obligation: $362,551,000 Total quarterly disbursement: $2,178,797 Improve the water supply for industrial and domestic needs, and enhance rural livelihoods through improved watershed management. $4,621 $122,398,000 Increase access to lifeextending ART and essential health services by providing a sustainable delivery platform. $548,807 Private Sector Development Project. mstockstill on PROD1PC66 with NOTICES Measures $36,208,000 Stimulate investment by improving access to credit, reducing transaction costs and increasing the participation of women in the economy. $401,992 Program Administration * and Control, Monitoring and Evaluation. Pending Subsequent Report **. $39,917,416 ......................................... ......................................... Decrease in percentage of urban water that is not accounted for (non-revenue losses plus physical losses). Number of people covered per year in rural areas with MCC funded rural water supply. Number of new VIP latrines provided to households. Increase in the percentage of health facilities providing full package of standard services for level of center (MoHSW 2007 standard). Increase in TB treatment success rate. Increase in the percentage of health facilities staffed with standard number and type of qualified staff (MoHSW 2007 standard). Increase in the number of patients treated in health centers in Lesotho. Increase in immunization rate (measles). Number of people receiving ARV treatment (number). Increase in annual enrolment at National Health Training College. Increase in average referred tests performed at the central laboratory per quarter during the past year. Increase in average number of blood units collected per quarter during the past year. Increase in the percentage of the adult population listed by a private credit bureau with current information on repayment history, unpaid debts or credit outstanding. Increase in the number of payments associated with salaries and pensions made through EFT per year. Land used as collateral (number of mortgage bonds registered). Land transaction costs (percent of property value). Land transaction times (median number of days necessary to complete a procedure). Increase in the number of pending civil cases in the High Court. Gender equality index (percent change in index of knowledge, attitudes, and practices for supporting gender equality in economic rights). $3,054,152 $0 Increased urban access to potable water supply. Increase in volume of water delivered after treatment at Metolong site. $422 VerDate Nov<24>2008 17:55 Jan 08, 2009 Jkt 217001 PO 00000 Frm 00086 Fmt 4703 Sfmt 4703 E:\FR\FM\09JAN1.SGM 09JAN1 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices Projects Obligated Objective Cumulative disbursements Country: Morocco Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Lesotho Fruit Tree Productivity ..... $306,411,391 $109,162,154 $433,590 Improve quality of fish moving through domestic channels and assure the sustainable use of fishing resources. $0 Artisan and Fez Medina .. $106,331,421 Increase value added to tourism and artisan sectors. $0 Financial Services ............ $46,200,000 $36,442,894 Program Administration * and Control, Monitoring and Evaluation. Pending Subsequent Report **. $92,952,140 Increase supply and decrease costs of financial services available to microenterprises. Improved survival rate of new SMEs and INDHfunded income generating activities; increased revenue for new SMEs and INDHfunded income generating activities. ......................................... $0 Enterprise Support ........... $0 ......................................... Total annual volume of production of dates and olives. Cropped area covered by olive trees. Survival rate of newly planted olive trees after 2 years project-supported establishment period. Yield of rehabilitated olive trees. Cropped area covered by date trees. Yield of rehabilitated date palms. State of fish stock. Domestic fish consumption level. Fisherman net revenue. Average fisherman sales price at PDA. Volume sold at wholesale markets. Fish sale price. Average sales price. Volume of sales among mobile fish vendors. Average revenue of potters receiving Artisan Production Activity. Employment and wages among Project graduates. Tourist arrivals. Artisan profits (artisans engaged in product finishing and points of sale). Employment created. SME value added. Gross loan portfolio outstanding of microcredit associations. Portfolio at risk >30 days ratio. Operating Expense Ratio. Average annual sales of participating businesses. Survival rate of participating businesses. $342,304 $0 Projects Obligated Objective $0 Cumulative disbursements Country: Tanzania Year: 2008 Quarter 4 Entity to which the assistance is provided: MCA Tanzania Energy Sector .................. $206,471,000 Transport Sector .............. $372,776,000 Water Sector Project ....... mstockstill on PROD1PC66 with NOTICES Measures Total obligation: $697,500,000 Total quarterly disbursement: $639,367 Reduce volatility of agricultural production and increase volume of fruit agricultural production. Small Scale Fisheries ...... $66,335,000 Program Administration * and Control, Monitoring and Evaluation. Pending Subsequent Report **. VerDate Nov<24>2008 17:55 Jan 08, 2009 Measures Total obligation: $698,136,000 Total quarterly disbursement: $315,187 $52,554,000 Increase value added to businesses. Increase cash crop revenue and aggregate visitor spending. Increase investment in human and physical capital and to reduce the prevalence of water-related disease. ......................................... $563,129 $0 ......................................... ¥$247,942 Jkt 217001 PO 00000 Frm 00087 Fmt 4703 961 $0 $0 TBD. $0 Sfmt 4703 TBD. TBD. E:\FR\FM\09JAN1.SGM 09JAN1 962 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices Projects Obligated Cumulative disbursements Objective Measures Country: Burkina Faso (CIF ONLY) Year: 2008 Quarter 4 Total obligation: $16,101,0650 Entity to which the assistance is provided: MCA Burkina Faso Total quarterly disbursement: $3,260,580 Roads Project .................. Rural Land Governance Project. $1,105,412 Agriculture Development Project. $4,771,602 Bright 2 Schools Project .. $3,000,000 Program Administration * and Control, Monitoring and Evaluation. Pending Subsequent Report **. $6,886,068 Enhance access to markets through investments in the road network. Increase investment in land and rural productivity through improved land tenure security and land management. Expand the productive use of land in order to increase the volume and value of agricultural production in project zones. Increase primary school completion rates. ......................................... $0 ......................................... Projects $337,983 Obligated $0 TBD. $0 TBD. $0 TBD. $3,000,000 TBD. $201,694 $58,886 Cumulative disbursements Objective Measures Country: Namibia (CIF ONLY) Year: 2008 Quarter 4 Total obligation: $19,543,175 Entity to which the assistance is provided: MCA Namibia Total quarterly disbursement: $0 Education Project ............. $8,976,296 Tourism Project ................ $2,475,145 Agriculture Project ........... $1,369,139 Program Administration * and Control, Monitoring and Evaluation. Pending Subsequent Report **. $6,722,595 Improve the education sector’s effectiveness, efficiency and quality. Increase incomes and create employment opportunities by improving the marketing, management and infrastructure of Etosha National Park. Sustainably improve the economic performance and profitability of the livestock sector and increase the volume of the indigenous natural products for export. ......................................... $0 $0 ......................................... TBD. $0 TBD. $0 TBD. $0 $0 * Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment. ** These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such in subsequent quarterly report(s). 619(b) transfer or allocation of funds U.S. agency to which funds were transferred or allocated mstockstill on PROD1PC66 with NOTICES USAID ........................................................................................ VerDate Nov<24>2008 17:55 Jan 08, 2009 Jkt 217001 PO 00000 Frm 00088 Amount $43,405,520 Fmt 4703 Sfmt 4703 Description of program or project Threshold Program. E:\FR\FM\09JAN1.SGM 09JAN1 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices Dated: January 2, 2009. Matthew McLean, Vice President, Congressional and Public Affairs, Millennium Challenge Corporation. [FR Doc. E9–181 Filed 1–8–09; 8:45 am] BILLING CODE 9211–03–P NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES Kathy Plowitz-Worden, Panel Coordinator, National Endowment for the Arts. [FR Doc. E9–187 Filed 1–8–09; 8:45 am] National Endowment for the Arts; Proposed Collection; Comment Request ACTION: technological collection techniques or other forms of information technology, e.g., permitting electronic submissions of responses. ADDRESSES: Sarah Cunningham, National Endowment for the Arts, 1100 Pennsylvania Avenue, NW., Room 703, Washington, DC 20506–0001, telephone (202) 682–5515 (this is not a toll-free number), fax (202) 682–5002. Notice. BILLING CODE 7537–01–P The National Endowment for the Arts (NEA), as part of its continuing effort to reduce paperwork and respondent burden, conducts a preclearance consultation program to provide the general public and federal agencies with an opportunity to comment on proposed and/or continuing collections of information in accordance with the Paperwork Reduction Act of 1995 (PRA95) [44 U.S.C. 3506(c)(A)]. This program helps to ensure that requested data can be provided in the desired format, reporting burden (time and financial resources) is minimized, collection instruments are clearly understood, and the impact of collection requirements on respondents can be properly assessed. Currently, the NEA is soliciting comments concerning the proposed information collection to evaluate methods of assessing student learning arts education programs. A copy of the current information collection request can be obtained by contacting the office listed below in the ADDRESSES section of this notice. DATES: Written comments must be submitted to the office listed in the address section below on or before March 5, 2009. The NEA is particularly interested in comments which: • Evaluate whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information will have practical utility; • Evaluate the accuracy of the agency’s estimate of the burden of the proposed collection of information including the validity of the methodology and assumptions used; • Enhance the quality, utility, and clarity of the information to be collected; and • Minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated, electronic, mechanical, or other mstockstill on PROD1PC66 with NOTICES SUMMARY: VerDate Nov<24>2008 16:16 Jan 08, 2009 Jkt 217001 NATIONAL FOUNDATION ON THE ARTS AND HUMANITIES National Endowment for the Arts; Submission of OMB Review: Comment Request The National Endowment for the Arts (NEA) has submitted the following public information collection request (ICR) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act of 1995 [Pub. L. 104–13, 44 U.S.C. Chapter 35]. Copies of the ICR, with applicable supporting documentation, may be obtained by contacting Sunil Iyengar via telephone at 202–682–5654 (this is not a toll-free number) or e-mail at research@arts.endow.gov. Individuals who use a telecommunications device for the deaf (TTY/TDD) may call 202– 682–5496 between 10 a.m. and 4 p.m. Eastern time, Monday through Friday. Comments should be sent to the Office of Information and Regulatory Affairs, Attn: OMB Desk Officer for the National Endowment for the Arts, Office of Management and Budget, Room 10235, Washington, DC 20503, 202– 395–7316, within 30 days from the date of this publication in the Federal Register. The Office of Management and Budget (OMB) is particularly interested in comments which: • Evaluate whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information will have practical utility; • Evaluate the accuracy of the agency’s estimate of the burden of the proposed collection of information including the validity of the methodology and assumptions used; • Enhance the quality, utility, and clarity of the information to be collected; and PO 00000 Frm 00089 Fmt 4703 Sfmt 4703 963 • Minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated, electronic, mechanical, or other technological collection techniques, or other forms of information technology, e.g., permitting electronic submission of responses. Agency: National Endowment for the Arts. Title: Study of Outdoor Arts Festivals. OMB Number: New. Frequency: One time. Affected Public: Festival organizers. Estimated Number of Respondents: 7769. Estimated Time Per Respondent: 16.0 minutes. Total Burden Hours: 2071 hours. Total Annualized Capital/Startup Costs: 0. Total Annual Costs (Operating/ Maintaining Systems or Purchasing Services): 0. Description: The National Endowment for the Arts plans to conduct a study of outdoor arts festivals in the United States. There currently is no single, comprehensive research publication or database that describes the range and/or impact of arts festivals in this country. The study proposed here is a twopronged research effort to describe the U.S. outdoor festival community— among other characteristics, its number, types, financing, staffing, regional distribution, and artist employment patterns. The first prong of the study is a national on-line survey of the universe of outdoor arts festivals, and the second is a series of seven case studies of festivals involving site visits, audience surveys, interviews with festival administrators, focus groups of artists, and focus groups of volunteers. Festivals in the study may be one-day or season-long programs, multidisciplinary or discipline-specific, and funded by non-profit or for-profit organizations. The activities include collecting uniform data from festival organizers while still keeping data collection burdens to a minimum. ADDRESSES: Sunil Iyengar, National Endowment for the Arts, 1100 Pennsylvania Avenue, NW., Room 616, Washington, DC 20506–0001, telephone (202) 682–5654 (this is not a toll-free number), fax (202) 682–5677. Kathleen Edwards, Support Services Supervisor, Administrative Services, National Endowment for the Arts. [FR Doc. E9–200 Filed 1–8–09; 8:45 am] BILLING CODE 7537–01–P E:\FR\FM\09JAN1.SGM 09JAN1

Agencies

[Federal Register Volume 74, Number 6 (Friday, January 9, 2009)]
[Notices]
[Pages 952-963]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-181]


=======================================================================
-----------------------------------------------------------------------

MILLENNIUM CHALLENGE CORPORATION

[MCC 09-05]


Notice of Quarterly Report (July 1, 2008-September 30, 2008)

AGENCY: Millennium Challenge Corporation.

SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for 
the quarter July 1, 2008 through September 30, 2008 in respect to both 
assistance provided under Section 605 of the Millennium Challenge Act 
of 2003 (Pub. L. 108-199, Division D (the Act)), and transfers or 
allocations of funds to other federal agencies pursuant to Section 
619(b) of the Act. The following report shall be made available to the 
public by means of publication in the Federal Register and on the 
Internet Web site of the MCC (https://www.mcc.gov) in accordance with 
Section 612(b) of the Act.

                                      Assistance Provided Under Section 605
----------------------------------------------------------------------------------------------------------------
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Madagascar Year: 2008 Quarter 4 Total obligation: $109,773,000
      Entity to which the assistance is provided: MCA Madagascar Total quarterly disbursement: $12,296,269
----------------------------------------------------------------------------------------------------------------
Land Tenure Project.............      $37,803,000  Increase Land            $15,491,326  Legislative proposal
                                                    Titling and                           reflecting the
                                                    Security.                             National Land Tenure
                                                                                          Program submitted to
                                                                                          Parliament and passed.
                                                                                         Number of land disputes
                                                                                          reported and resolved
                                                                                          in the target zones
                                                                                          and sites of
                                                                                          implementation.
                                                                                         Percentage of land
                                                                                          documents inventoried,
                                                                                          restored, and/or
                                                                                          digitized.
                                                                                         Average time and cost
                                                                                          required to carry out
                                                                                          property transactions.
                                                                                         Percent of reported
                                                                                          land conflicts
                                                                                          resolved on titled
                                                                                          land in zone 3, 4, 5
                                                                                          during the title
                                                                                          regularization
                                                                                          operations.
                                                                                         Percentage of land in
                                                                                          the zones that is
                                                                                          demarcated and ready
                                                                                          for titling.
Finance Project.................      $35,888,000  Increase                 $11,298,895  The number of savings
                                                    Competition in the                    accounts and
                                                    Financial Sector.                     outstanding value of
                                                                                          accounts from primary
                                                                                          banks.
                                                                                         Maximum check clearing
                                                                                          delay.
                                                                                         Volume of funds in
                                                                                          payment system and
                                                                                          number of
                                                                                          transactions.
                                                                                         Increased public
                                                                                          awareness of new
                                                                                          financial instruments
                                                                                          as measured by surveys
                                                                                          within intervention
                                                                                          zones and large towns.
                                                                                         The amount of
                                                                                          government debt issued
                                                                                          with maturities in
                                                                                          excess of 52 weeks.
                                                                                         The number of new
                                                                                          individual investors
                                                                                          buying government debt
                                                                                          securities.
                                                                                         The number of bank
                                                                                          branches of the
                                                                                          Central Bank of
                                                                                          Madagascar capable of
                                                                                          accepting auction
                                                                                          tenders.

[[Page 953]]

 
                                                                                         Percentage of all loans
                                                                                          included in the
                                                                                          central database.
Agricultural Business Investment      $17,683,000  Improve                   $8,923,689  Number of rural
 Project.                                           Agricultural                          producers receiving or
                                                    Projection                            soliciting information
                                                    Technologies and                      from Agricultural
                                                    Market Capacity in                    Business Centers about
                                                    Rural Areas.                          the opportunities.
                                                                                         Intervention zones
                                                                                          identified and
                                                                                          description of
                                                                                          beneficiaries within
                                                                                          each zone submitted.
                                                                                         Number of visitors
                                                                                          receiving information
                                                                                          from National
                                                                                          Coordinating Center
                                                                                          with respect to
                                                                                          business
                                                                                          opportunities.
                                                                                         Change in farm income
                                                                                          due to improved
                                                                                          production and
                                                                                          marketing practices.
                                                                                         Change in enterprise
                                                                                          income due to improved
                                                                                          production and
                                                                                          marketing practices.
                                                                                         Number of farmers and
                                                                                          business employing
                                                                                          technical assistance
                                                                                          received.
Program Administration * and          $18,399,000  ...................      $10,483,218
 Control, Monitoring and
 Evaluation.
Pending subsequent reports **...  ...............  ...................      $12,654,499
----------------------------------------------------------------------------------------------------------------
* Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
** These amounts represent disbursements made that will be allocated to individual projects in the subsequent
  quarter(s) and reported as such in subsequent quarterly report(s).


----------------------------------------------------------------------------------------------------------------
                                                                           Cumulative
            Projects                 Obligated          Objective        disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Honduras Year: 2008 Quarter 4 Total obligation: $215,000,000
       Entity to which the assistance is provided: MCA Honduras Total quarterly disbursement: $13,479,730
----------------------------------------------------------------------------------------------------------------
Rural Development Project.......      $70,687,000  Increase the             $21,844,528  Increase in farm income
                                                    productivity and                      resulting from Rural
                                                    business skills of                    Development Project.
                                                    farmers who                          Funds lent by MCA-
                                                    operate small and                     Honduras to financial
                                                    medium-size farms                     institutions.
                                                    and their
                                                    employees..
                                                                                         Increase in employment
                                                                                          income resulting from
                                                                                          Rural Development
                                                                                          Project.
                                                                                         Number of Program
                                                                                          farmers harvesting
                                                                                          high-value
                                                                                          horticulture crops.
                                                                                         Number of hectares
                                                                                          harvesting high-value
                                                                                          horticulture crops.
Transportation Project..........     $127,491,876  Reduce                    $8,329,169  Freight shipment cost
                                                    transportation                        from Tegucigalpa to
                                                    costs between                         Puerto Cortes.
                                                    targeted                             Price of basic food
                                                    production centers                    basket.
                                                    and national,                        Number of days per year
                                                    regional and                          road is passable.
                                                    global markets.
Program Administration * and          $16,821,124  ...................       $3,994,766
 Control, Monitoring and
 Evaluation.
Pending subsequent reports **...  ...............  ...................         $776,067
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Cape Verde Year: 2008 Quarter 4 Total obligation: $110,078,488
       Entity to which the assistance is provided: MCA Cape Verde Total quarterly disbursement: $9,450,397
----------------------------------------------------------------------------------------------------------------
Watershed and Agricultural            $10,848,630  Increase                  $3,541,205  Increase in
 Support.                                           agricultural                          horticultural
                                                    production in                         productivity.
                                                    three targeted                       Increase in annual
                                                    watershed areas on                    income.
                                                    three islands.                       Value-added for farms
                                                                                          and agribusiness.

[[Page 954]]

 
Infrastructure Improvement......      $83,160,208  Increase                 $16,923,184  Volume of goods shipped
                                                    integration of the                    between Praia and
                                                    internal market                       other islands.
                                                    and reduce                           Mobility Ratio:
                                                    transportation                        Percentage of
                                                    costs.                                beneficiary population
                                                                                          who take at least 5
                                                                                          trips per month.
                                                                                         Savings on transport
                                                                                          costs from
                                                                                          improvements.
Private Sector Development......       $2,800,000  Spur private sector         $356,711  Value added in priority
                                                    development on all                    sectors above current
                                                    islands through                       trends.
                                                    increased                            Volume of private
                                                    investment in the                     investment in priority
                                                    priority sectors                      sectors above current
                                                    and through                           trends.
                                                    financial sector
                                                    reform.
Program Administration * and          $13,269,650  ...................       $6,218,097
 Control, Monitoring and
 Evaluation.
Pending subsequent reports **...  ...............  ...................                0
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective        disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Nicaragua Year: 2008 Quarter 4 Total obligation: $174,710,890
      Entity to which the assistance is provided: MCA Nicaragua Total quarterly disbursement: $ 11,129,188
----------------------------------------------------------------------------------------------------------------
Property Regularization Project.      $22,000,000  Increase Investment       $4,669,995  Value of investment on
                                                    by strengthening                      land.
                                                    property rights.                     Value of urban land.
                                                                                         Value of rural land.
                                                                                         Number of days to
                                                                                          conduct a land
                                                                                          transaction.
                                                                                         Total cost to conduct a
                                                                                          land transaction.
Transportation Project..........     $105,193,200  Reduce                    $8,990,461  Price of a basket of
                                                    transportation                        goods.
                                                    costs between Leon                   Travel Time.
                                                    and Chinandega and
                                                    national, regional
                                                    and global markets.
Rural Business Development            $32,897,500  Increase the value       $11,325,597  Annual percentage
 Project.                                           added of farms and                    increase in value-
                                                    enterprises in the                    added of clients of
                                                    region.                               business office.
                                                                                         Number of jobs created.
                                                                                         Number of program farm
                                                                                          plots harvesting
                                                                                          higher-value crops or
                                                                                          reforesting under
                                                                                          improvement of Water
                                                                                          Supply Activities.
Program Administration *, Due         $14,909,300  ...................       $6,867,070
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports **...  ...............  ...................       $2,129,337
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective        disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Georgia Year: 2008 Quarter 4 Total obligation: $295,300,000
        Entity to which the assistance is provided: MCA Georgia Total quarterly disbursement: $21,853,277
----------------------------------------------------------------------------------------------------------------
Regional Infrastructure              $216,600,000  Key Regional             $45,138,132  Reduction in
 Rehabilitation.                                    Infrastructure                        Akhalkalaki-
                                                    Rehabilitated.                        Ninotsminda-Teleti
                                                                                          journey time.
                                                                                         Reduction in vehicle
                                                                                          operating costs.
                                                                                         Increase in internal
                                                                                          regional traffic
                                                                                          volumes.
                                                                                         Decreased technical
                                                                                          losses in gas through
                                                                                          the main North-South
                                                                                          pipeline
                                                                                         Reduction in the
                                                                                          production of
                                                                                          greenhouse gas
                                                                                          emissions measured in
                                                                                          tons of CO2
                                                                                          equivalent.
                                                                                         Increased collection
                                                                                          rate of the Georgian
                                                                                          Gas Company (GOGC).
                                                                                         Number of household
                                                                                          beneficiaries served
                                                                                          by Regional
                                                                                          Infrastructure
                                                                                          Development projects.
                                                                                         Actual operations and
                                                                                          maintenance
                                                                                          expenditures.
Regional Enterprise Development.      $47,350,000  Enterprises in           $16,230,586  Increase in annual
                                                    Regions Developed.                    revenue in portfolio
                                                                                          companies.
                                                                                         Increase in number of
                                                                                          portfolio company
                                                                                          employees and number
                                                                                          of local suppliers.
                                                                                         Increase in portfolio
                                                                                          companies' wages and
                                                                                          payments to local
                                                                                          suppliers.
                                                                                         Jobs created.
                                                                                         Increase in aggregate
                                                                                          incremental net
                                                                                          revenue to project
                                                                                          assisted firms.
                                                                                         Direct household net
                                                                                          income.

[[Page 955]]

 
                                                                                         Direct household net
                                                                                          income for market
                                                                                          information initiative
                                                                                          beneficiaries.
                                                                                         Number of
                                                                                          beneficiaries.
Program Administration *, Due         $36,100,000  ...................      $10,630,824
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports **...  ...............  ...................       $1,162,968
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective        disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Vanuatu Year: 2008 Quarter 4 Total obligation: $65,690,000
        Entity to which the assistance is provided: MCA Vanuatu Total quarterly disbursement: $9,498,932
----------------------------------------------------------------------------------------------------------------
Transportation Infrastructure         $60,587,816  Facilitate                  $188,462  Number of Tourists.
 Project.                                           transportation to                    Number of days per year
                                                    increase tourism                      road is closed.
                                                    and business                         Number of S-W Bay,
                                                    development.                          Malekula flights
                                                                                          cancelled per year due
                                                                                          to flooding.
                                                                                         Vessel wait time at
                                                                                          wharf.
Program Administration *, Due          $5,074,768  ...................      $19,844,963
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports **...  ...............  ...................      $19,844,963
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective        disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Armenia Year: 2008 Quarter 4 Total obligation: $235,650,000
        Entity to which the assistance is provided: MCA Armenia Total quarterly disbursement: $5,030,672
----------------------------------------------------------------------------------------------------------------
Irrigated Agriculture Project        $145,680,000  Increase                 $12,015,860  Increase in hectares
 (Agriculture and Water).                           agricultural                          covered by high value
                                                    productivity                          added horticultural
                                                    Improve and                           and fruit crops.
                                                    Quality of                           Percentage of
                                                    Irrigation.                           respondents satisfied
                                                                                          with irrigation
                                                                                          services.
                                                                                         Share of Water User
                                                                                          Association water
                                                                                          charges as percentage
                                                                                          of Water User
                                                                                          Association annual
                                                                                          operations and
                                                                                          maintenance costs.
                                                                                         Number of farmers using
                                                                                          improved on-farm water
                                                                                          management practices.
                                                                                         Annual increase in
                                                                                          irrigated land in
                                                                                          Project area.
                                                                                         State budget
                                                                                          expenditures on
                                                                                          maintenance of
                                                                                          irrigation system.
                                                                                         Value of loans provided
                                                                                          under the project.
Rural Road Rehabilitation             $67,100,000  Better access to          $5,541,926  Government budgetary
 Project.                                           economic and                          allocations for
                                                    social                                routine maintenance of
                                                    infrastructure.                       the entire road
                                                                                          network
                                                                                         Average daily traffic
                                                                                          in Project area.
                                                                                         Kilometers of Package 1
                                                                                          road sections
                                                                                          rehabilitated.
                                                                                         Kilometers of Package 2
                                                                                          road sections
                                                                                          rehabilitated.
                                                                                         Kilometers of Package 3
                                                                                          road sections
                                                                                          rehabilitated.
Program Administration *, Due         $22,870,000  ...................       $5,411,097
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports **...  ...............  ...................       $1,224,709
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective        disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Benin Year: 2008 Quarter 4 Total obligation: $307,298,040
           Entity to which the assistance is provided: MCA Benin Total quarterly disbursement: $9,377
----------------------------------------------------------------------------------------------------------------
Access to Financial Services....      $19,650,000  Expand Access to          $1,737,505  Operational self-
                                                    Financial Services.                   sufficiency of
                                                                                          participating
                                                                                          microfinance
                                                                                          institutions.
                                                                                         Number of microfinance
                                                                                          institutions
                                                                                          supervised by the
                                                                                          microfinance cellule.
                                                                                         Total incremental
                                                                                          increase in value of
                                                                                          new credit extended
                                                                                          and savings received
                                                                                          by financial
                                                                                          institutions
                                                                                          participating in the
                                                                                          project.

[[Page 956]]

 
                                                                                         Share value of all
                                                                                          loans outstanding that
                                                                                          have one or more
                                                                                          installments of
                                                                                          principal over 30 days
                                                                                          past due.
                                                                                         Total number of loans
                                                                                          guaranteed by land
                                                                                          titles per year.
Access to Justice...............      $34,270,000  Improved Ability of       $1,424,538  Number of cases
                                                    Justice System to                     processed at the
                                                    Enforce Contracts                     arbitration center.
                                                    and Reconcile                        Percentage of all cases
                                                    Claims.                               in the ``Tribunal de
                                                                                          Premiere Instance''
                                                                                          courts per year.
                                                                                         Percentage of all cases
                                                                                          resolved in court of
                                                                                          appeals per year.
                                                                                         Average distance to
                                                                                          reach TPI.
                                                                                         Number of enterprises
                                                                                          registered through the
                                                                                          registration center.
                                                                                         Average number of days
                                                                                          required to register
                                                                                          an enterprise.
Access to Land..................      $36,020,000  Strengthen property       $6,417,860  Total value of
                                                    rights and                            additional investments
                                                    increase                              in target rural land
                                                    investment in                         parcels.
                                                    rural and urban
                                                    land.
                                                                                         Total value of
                                                                                          additional investments
                                                                                          in target urban land
                                                                                          parcels.
Access to Markets...............     $169,447,000  Improve Access to         $4,328,427  Total metric tons of
                                                    Markets through                       exports and imports
                                                    Improvements to                       passing through Port
                                                    the Port of                           of Cotonou per year.
                                                    Cotonou.
Program Administration *, Due         $47,911,040  ...................       $9,554,759
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports **...  ...............  ...................         $933,326
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective        disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Ghana Year: 2008 Quarter 4 Total obligation: $547,009,000
         Entity to which the assistance is provided: MCA Ghana Total quarterly disbursement: $10,423,856
----------------------------------------------------------------------------------------------------------------
Agriculture Project.............     $240,984,001  Enhance                  $12,127,070  Number of hectares
                                                    Profitability of                      irrigated.
                                                    cultivation,                         Number of days to
                                                    services to                           conduct a land
                                                    agriculture and                       transaction.
                                                    product handling                     Number of land disputes
                                                    in support of the                     in the pilot
                                                    expansion of                          registration
                                                    commercial                            districts.
                                                    agriculture among                    Registration of land
                                                    groups of                             rights in the pilot
                                                    smallholder farms.                    registration
                                                                                          districts.
                                                                                         Metric tons of products
                                                                                          passing through post-
                                                                                          harvest treatment.
                                                                                         Portfolio-at-risk of
                                                                                          agriculture loan fund.
                                                                                         Value of loans
                                                                                          disbursed to clients
                                                                                          from agricultural loan
                                                                                          fund.
                                                                                         Number of additional
                                                                                          loans.
                                                                                         Vehicle operating costs
                                                                                          on minor, medium and
                                                                                          major rehabilitated
                                                                                          roads.
Rural Development...............     $101,288,000  Strengthen the              $973,565  Time/ quality per
                                                    rural institutions                    procurement.
                                                    that provide                         Score card of citizen
                                                    services                              satisfaction with
                                                    complementary to,                     services.
                                                    and supportive of,                   Gross enrollment rates.
                                                    agricultural and                     Gender parity in school
                                                    agriculture                           enrollment.
                                                    business                             Distance to collect
                                                    development.                          water.
                                                                                         Time to collect water.
                                                                                         Distance to sanitation
                                                                                          facility.
                                                                                         Travel time to
                                                                                          sanitation facility.
                                                                                         Incidence of guinea
                                                                                          worm, diarrhea or
                                                                                          bilharzias.
                                                                                         Average number of days
                                                                                          lost due to guinea
                                                                                          worm, diarrhea or
                                                                                          bilharzias.
                                                                                         Percentage of
                                                                                          households, schools,
                                                                                          and agricultural
                                                                                          processing plants in
                                                                                          target districts with
                                                                                          electricity.
                                                                                         Number of inter-bank
                                                                                          transactions.
                                                                                         Value of deposit
                                                                                          accounts in rural
                                                                                          banks.
Transportation..................     $143,104,000  Reduce the                $1,913,952  Volume capacity ratio.
                                                    transportation                       Vehicles per hour at
                                                    costs affecting                       peak hour.
                                                    agriculture                          Travel time at peak
                                                    commerce at sub-                      hour.
                                                    regional levels.
                                                                                         International roughness
                                                                                          index.

[[Page 957]]

 
                                                                                         Annual average daily
                                                                                          vehicle and passenger
                                                                                          traffic.
Program Administration *, Due         $61,632,999  ...................      $10,134,998
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports **...  ...............  ...................         $808,368
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective        disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                    Country: El Salvador Year: 2008 Quarter 4 Total obligation: $460,940,000
      Entity to which the assistance is provided: MCA El Salvador Total quarterly disbursement: $6,521,093
----------------------------------------------------------------------------------------------------------------
Human Development Project.......      $95,073,000  Increase human and        $1,172,454  Number of students
                                                    physical capital                      enrolled in the
                                                    of residents of                       Chalatenango Center
                                                    the Northern Zone                     functioning as a
                                                    to take advantage                     MEGATEC institute.
                                                    of employment and                    Graduation rate of
                                                    business                              students enrolled in
                                                    opportunities.                        the Chalatenango
                                                                                          Center functioning as
                                                                                          a MEGATEC institute.
                                                                                         Number of students
                                                                                          enrolled in
                                                                                          participating middle
                                                                                          technical schools.
                                                                                         Graduation rate of
                                                                                          students enrolled in
                                                                                          participating middle
                                                                                          technical schools.
                                                                                         Number of students
                                                                                          enrolled in non-formal
                                                                                          training activities.
                                                                                         Graduation rate of
                                                                                          students enrolled in
                                                                                          non-formal training
                                                                                          activities.
                                                                                         Number of households
                                                                                          with access to water
                                                                                          in the Northern Zone.
                                                                                         Number of households
                                                                                          with access to basic
                                                                                          sanitation in the
                                                                                          Northern Zone.
                                                                                         Number of households
                                                                                          with electricity in
                                                                                          the Northern Zone.
                                                                                         Number of individuals
                                                                                          that benefit annually
                                                                                          from the strategic
                                                                                          infrastructure
                                                                                          projects.
Productive Development Project..      $87,466,000  Increase production       $5,514,266  Investment in
                                                    and employment in                     productive chains by
                                                    the Northern Zone.                    selected
                                                                                          beneficiaries.
Connectivity Project............     $233,560,000  Reduce travel cost           $94,900  Weighted average of the
                                                    and time within                       International
                                                    the Northern Zone,                    Roughness Index for
                                                    with the rest of                      the rehabilitation of
                                                    the country, and                      the Transnational
                                                    within the region.                    Highway.
                                                                                         Weighted average of the
                                                                                          International
                                                                                          Roughness Index for
                                                                                          the rehabilitation of
                                                                                          the network of
                                                                                          connecting roads.
Program Administration * and          $44,841,000  ...................       $4,998,673
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report **....  ...............  ...................         $703,921
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective        disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                        Country: Mali Year: 2008 Quarter 4 Total obligation: $460,811,164
          Entity to which the assistance is provided: MCA Mali Total quarterly disbursement: $1,638,291
----------------------------------------------------------------------------------------------------------------
Bamako Senou Airport Improvement     $182,007,541  Establish an              $1,377,281  Number of weekly flight
 Project.                                           independent and                       arrivals and
                                                    secure link to the                    departures.
                                                    regional and                         Average time for
                                                    global economy.                       passengers to complete
                                                                                          departures and
                                                                                          arrivals procedures.
Industrial Park Project.........       $2,080,155  Develop a platform        $2,080,155  Occupancy level.
                                                    for industrial                       Average number of days
                                                    activity to be                        required for operator
                                                    located within the                    to connect to
                                                    Airport domain.                       Industrial Park water
                                                                                          and electricity
                                                                                          services.

[[Page 958]]

 
Alatona Irrigation Project......     $234,884,675  Increase the                $436,925  Weighted average of the
                                                    agricultural                          International
                                                    production and                        Roughness Index for
                                                    productivity in                       the rehabilitation of
                                                    the Alatona zone                      the Niono-Goma Coura
                                                    of the ON.                            road.
                                                                                         Annual average daily
                                                                                          count of vehicles on
                                                                                          the Niono-Goma Coura
                                                                                          road.
                                                                                         Total amount of land
                                                                                          irrigated by the
                                                                                          Project in the Alatona
                                                                                          zone.
                                                                                         Average water volume
                                                                                          delivered at the farm
                                                                                          level in the Alatona
                                                                                          zone.
                                                                                         Crop water requirements
                                                                                          as a percentage share
                                                                                          of water supply at the
                                                                                          canal headworks in the
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.