Arlington Storage Company, LLC; Notice of Motion and Request for Shortened Response Time, 707 [E9-51]

Download as PDF Federal Register / Vol. 74, No. 4 / Wednesday, January 7, 2009 / Notices Comment Date: 5 p.m. Eastern Time on January 22, 2009. Comment Date: January 8, 2009. DEPARTMENT OF ENERGY Kimberly D. Bose, Secretary. [FR Doc. E9–51 Filed 1–6–09; 8:45 am] Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. E8–31432 Filed 1–6–09; 8:45 am] 707 BILLING CODE 6717–01–P [Docket No. CP08–96–001] BILLING CODE 6717–01–P Arlington Storage Company, LLC; Notice of Motion and Request for Shortened Response Time December 31, 2008. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP08–436–000] Stingray Pipeline Company, L.L.C.; Notice of Informal Settlement Conference December 31, 2008. Take notice that an informal settlement conference will be convened in this proceeding commencing at 10 a.m. on Thursday, January 8, 2009, at the offices of the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426 for the purpose of exploring the possible settlement of the above-referenced dockets. Any party, as defined by 18 CFR 385.102(c), or any participant as defined by 18 CFR 385.102(b), is invited to attend. Persons wishing to become a party must move to intervene and receive intervenor status pursuant to the Commission’s regulations (18 CFR 385.214). FERC conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an e-mail to accessibility@ferc.gov or call toll free 1–866–208–3372 (voice) or (202) 208– 8659 (TTY), or send a FAX to (202) 208– 2106 with the required accommodations. For additional information, please contact Marc Gary Denkinger, (202) 502–8662, marc.denkinger@ferc.gov or Lorna Hadlock, (202) 502–8737 lorna.hadlock@ferc.gov. Kimberly D. Bose, Secretary. [FR Doc. E9–49 Filed 1–6–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Construction and Operation of the Proposed Transmission Agency of Northern California Transmission Project, California Take notice that on December 30, 2008, Arlington Storage Company, LLC (ASC), Two Brush Creek Boulevard, Kansas City, Missouri 64112, filed a motion to withdraw its Exhibit I, which contained executed precedent agreements, submitted on May 19, 2008 with its application in CP08–96–000. Alternatively, in the event withdrawal of the filing of Exhibit I is not practicable, ASC requests rehearing of Ordering Paragraph (E) of the Commission’s December 18 Order 1, all as more fully set forth in the application which is on file with the Commission and open for public inspection. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. ASC avers that the filing of such precedent agreements was not material to the Commission’s approval of the Project, pursuant to section 7(c) of the Natural Gas Act. If the withdrawal is not practicable, ASC, on rehearing, asks that the condition in Ordering Paragraph (E) requiring execution of firm service agreements prior to the start of construction be rescinded. Additionally, ASC requests a shortened response period, and that the Commission act no later than January 16th, 2009 on its motion or request for rehearing. Any questions regarding the application are to be directed to William R. Moler, Senior Vice President, Midstream Operations, Arlington Storage Company, Two Brush Creek Boulevard, Kansas City, Missouri 64112; phone number (816) 329–5344 or by email at bmoler@inergyservices.com. 1 Arlington Storage Company, LLC, 125 FERC ¶ 61,306 (2008). VerDate Nov<24>2008 16:10 Jan 06, 2009 Jkt 217001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 Western Area Power Administration AGENCY: Western Area Power Administration, DOE. ACTION: Advance Notice of Intent to Prepare an Environmental Impact Statement/Environmental Impact Report; Notice of Floodplain and Wetlands Involvement. SUMMARY: The Western Area Power Administration (Western), an agency of the U.S. Department of Energy (DOE), intends to prepare a joint environmental impact statement/environmental impact report (EIS/EIR) for the construction and operation of the proposed Transmission Agency of Northern California (TANC) Transmission Project (Project) in California. Western is issuing this Advance Notice to inform the public and interested parties early about the proposed Project. At a later date, Western plans to issue a formal Notice of Intent (NOI) and conduct a public scoping process, during which Western will invite the public to comment on the scope, proposed action, alternatives, and other issues to be addressed in the EIS/EIR. The EIS/EIR will address the construction, maintenance, and operation of the proposed Project, which would include building and upgrading over 500 miles of 230-kilovolt (kV) and 500-kV transmission lines and associated equipment and facilities in northern California. Portions of the proposed Project may affect floodplains and wetlands in the area. Western will hold public scoping meetings in several locations near the Project area during the public scoping period, anticipated to begin in early 2009. At the scoping meetings, Western will share information and receive comments and suggestions on the scope of the EIS/EIR. FOR FURTHER INFORMATION CONTACT: For further information about the project or the EIS/EIR process, contact Mr. David Young, National Environmental Policy Act (NEPA) Document Manager, Western Area Power Administration, Sierra Nevada Region, 114 Parkshore Drive, Folsom, CA 95630, telephone E:\FR\FM\07JAN1.SGM 07JAN1

Agencies

[Federal Register Volume 74, Number 4 (Wednesday, January 7, 2009)]
[Notices]
[Page 707]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-51]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP08-96-001]


Arlington Storage Company, LLC; Notice of Motion and Request for 
Shortened Response Time

December 31, 2008.
    Take notice that on December 30, 2008, Arlington Storage Company, 
LLC (ASC), Two Brush Creek Boulevard, Kansas City, Missouri 64112, 
filed a motion to withdraw its Exhibit I, which contained executed 
precedent agreements, submitted on May 19, 2008 with its application in 
CP08-96-000. Alternatively, in the event withdrawal of the filing of 
Exhibit I is not practicable, ASC requests rehearing of Ordering 
Paragraph (E) of the Commission's December 18 Order \1\, all as more 
fully set forth in the application which is on file with the Commission 
and open for public inspection. This filing is available for review at 
the Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, please 
contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free 
at (866) 208-3676, or for TTY, contact (202) 502-8659.
---------------------------------------------------------------------------

    \1\ Arlington Storage Company, LLC, 125 FERC ] 61,306 (2008).
---------------------------------------------------------------------------

    ASC avers that the filing of such precedent agreements was not 
material to the Commission's approval of the Project, pursuant to 
section 7(c) of the Natural Gas Act. If the withdrawal is not 
practicable, ASC, on rehearing, asks that the condition in Ordering 
Paragraph (E) requiring execution of firm service agreements prior to 
the start of construction be rescinded. Additionally, ASC requests a 
shortened response period, and that the Commission act no later than 
January 16th, 2009 on its motion or request for rehearing.
    Any questions regarding the application are to be directed to 
William R. Moler, Senior Vice President, Midstream Operations, 
Arlington Storage Company, Two Brush Creek Boulevard, Kansas City, 
Missouri 64112; phone number (816) 329-5344 or by e-mail at 
bmoler@inergyservices.com.
    Comment Date: January 8, 2009.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-51 Filed 1-6-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.