Arlington Storage Company, LLC; Notice of Motion and Request for Shortened Response Time, 707 [E9-51]
Download as PDF
Federal Register / Vol. 74, No. 4 / Wednesday, January 7, 2009 / Notices
Comment Date: 5 p.m. Eastern Time
on January 22, 2009.
Comment Date: January 8, 2009.
DEPARTMENT OF ENERGY
Kimberly D. Bose,
Secretary.
[FR Doc. E9–51 Filed 1–6–09; 8:45 am]
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E8–31432 Filed 1–6–09; 8:45 am]
707
BILLING CODE 6717–01–P
[Docket No. CP08–96–001]
BILLING CODE 6717–01–P
Arlington Storage Company, LLC;
Notice of Motion and Request for
Shortened Response Time
December 31, 2008.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP08–436–000]
Stingray Pipeline Company, L.L.C.;
Notice of Informal Settlement
Conference
December 31, 2008.
Take notice that an informal
settlement conference will be convened
in this proceeding commencing at
10 a.m. on Thursday, January 8, 2009,
at the offices of the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426 for the
purpose of exploring the possible
settlement of the above-referenced
dockets.
Any party, as defined by 18 CFR
385.102(c), or any participant as defined
by 18 CFR 385.102(b), is invited to
attend. Persons wishing to become a
party must move to intervene and
receive intervenor status pursuant to the
Commission’s regulations (18 CFR
385.214).
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an e-mail
to accessibility@ferc.gov or call toll free
1–866–208–3372 (voice) or (202) 208–
8659 (TTY), or send a FAX to (202) 208–
2106 with the required
accommodations.
For additional information, please
contact Marc Gary Denkinger, (202)
502–8662, marc.denkinger@ferc.gov or
Lorna Hadlock, (202) 502–8737
lorna.hadlock@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–49 Filed 1–6–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Construction and Operation of the
Proposed Transmission Agency of
Northern California Transmission
Project, California
Take notice that on December 30,
2008, Arlington Storage Company, LLC
(ASC), Two Brush Creek Boulevard,
Kansas City, Missouri 64112, filed a
motion to withdraw its Exhibit I, which
contained executed precedent
agreements, submitted on May 19, 2008
with its application in CP08–96–000.
Alternatively, in the event withdrawal
of the filing of Exhibit I is not
practicable, ASC requests rehearing of
Ordering Paragraph (E) of the
Commission’s December 18 Order 1, all
as more fully set forth in the application
which is on file with the Commission
and open for public inspection. This
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
ASC avers that the filing of such
precedent agreements was not material
to the Commission’s approval of the
Project, pursuant to section 7(c) of the
Natural Gas Act. If the withdrawal is not
practicable, ASC, on rehearing, asks that
the condition in Ordering Paragraph (E)
requiring execution of firm service
agreements prior to the start of
construction be rescinded. Additionally,
ASC requests a shortened response
period, and that the Commission act no
later than January 16th, 2009 on its
motion or request for rehearing.
Any questions regarding the
application are to be directed to William
R. Moler, Senior Vice President,
Midstream Operations, Arlington
Storage Company, Two Brush Creek
Boulevard, Kansas City, Missouri 64112;
phone number (816) 329–5344 or by email at bmoler@inergyservices.com.
1 Arlington Storage Company, LLC, 125 FERC
¶ 61,306 (2008).
VerDate Nov<24>2008
16:10 Jan 06, 2009
Jkt 217001
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
Western Area Power Administration
AGENCY: Western Area Power
Administration, DOE.
ACTION: Advance Notice of Intent to
Prepare an Environmental Impact
Statement/Environmental Impact
Report; Notice of Floodplain and
Wetlands Involvement.
SUMMARY: The Western Area Power
Administration (Western), an agency of
the U.S. Department of Energy (DOE),
intends to prepare a joint environmental
impact statement/environmental impact
report (EIS/EIR) for the construction and
operation of the proposed Transmission
Agency of Northern California (TANC)
Transmission Project (Project) in
California. Western is issuing this
Advance Notice to inform the public
and interested parties early about the
proposed Project. At a later date,
Western plans to issue a formal Notice
of Intent (NOI) and conduct a public
scoping process, during which Western
will invite the public to comment on the
scope, proposed action, alternatives,
and other issues to be addressed in the
EIS/EIR.
The EIS/EIR will address the
construction, maintenance, and
operation of the proposed Project,
which would include building and
upgrading over 500 miles of 230-kilovolt
(kV) and 500-kV transmission lines and
associated equipment and facilities in
northern California. Portions of the
proposed Project may affect floodplains
and wetlands in the area. Western will
hold public scoping meetings in several
locations near the Project area during
the public scoping period, anticipated to
begin in early 2009. At the scoping
meetings, Western will share
information and receive comments and
suggestions on the scope of the EIS/EIR.
FOR FURTHER INFORMATION CONTACT: For
further information about the project or
the EIS/EIR process, contact Mr. David
Young, National Environmental Policy
Act (NEPA) Document Manager,
Western Area Power Administration,
Sierra Nevada Region, 114 Parkshore
Drive, Folsom, CA 95630, telephone
E:\FR\FM\07JAN1.SGM
07JAN1
Agencies
[Federal Register Volume 74, Number 4 (Wednesday, January 7, 2009)]
[Notices]
[Page 707]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-51]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-96-001]
Arlington Storage Company, LLC; Notice of Motion and Request for
Shortened Response Time
December 31, 2008.
Take notice that on December 30, 2008, Arlington Storage Company,
LLC (ASC), Two Brush Creek Boulevard, Kansas City, Missouri 64112,
filed a motion to withdraw its Exhibit I, which contained executed
precedent agreements, submitted on May 19, 2008 with its application in
CP08-96-000. Alternatively, in the event withdrawal of the filing of
Exhibit I is not practicable, ASC requests rehearing of Ordering
Paragraph (E) of the Commission's December 18 Order \1\, all as more
fully set forth in the application which is on file with the Commission
and open for public inspection. This filing is available for review at
the Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, please
contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free
at (866) 208-3676, or for TTY, contact (202) 502-8659.
---------------------------------------------------------------------------
\1\ Arlington Storage Company, LLC, 125 FERC ] 61,306 (2008).
---------------------------------------------------------------------------
ASC avers that the filing of such precedent agreements was not
material to the Commission's approval of the Project, pursuant to
section 7(c) of the Natural Gas Act. If the withdrawal is not
practicable, ASC, on rehearing, asks that the condition in Ordering
Paragraph (E) requiring execution of firm service agreements prior to
the start of construction be rescinded. Additionally, ASC requests a
shortened response period, and that the Commission act no later than
January 16th, 2009 on its motion or request for rehearing.
Any questions regarding the application are to be directed to
William R. Moler, Senior Vice President, Midstream Operations,
Arlington Storage Company, Two Brush Creek Boulevard, Kansas City,
Missouri 64112; phone number (816) 329-5344 or by e-mail at
bmoler@inergyservices.com.
Comment Date: January 8, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-51 Filed 1-6-09; 8:45 am]
BILLING CODE 6717-01-P