Butte County, CA; Notice of Availability of Environmental Assessment, 276-277 [E8-31312]
Download as PDF
276
Federal Register / Vol. 74, No. 2 / Monday, January 5, 2009 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
December 29, 2008.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP95–408–071.
Applicants: Columbia Gas
Transmission, LLC.
Description: Columbia Gas
Transmission, LLC submits Ninetieth
Revised Sheet 25 et al. to FERC Gas
Tariff, Second Revised Volume 1, to be
effective 2/1/09.
Filed Date: 12/22/2008.
Accession Number: 20081224–0086.
Comment Date: 5 p.m. Eastern Time
on Monday, January 5, 2009.
Docket Numbers: RP96–200–204.
Applicants: CenterPoint Energy Gas
Transmission Co.
Description: CenterPoint Energy Gas
Transmission Co submits a negotiated
rate agreement with Petrohawk Energy
Corp.
Filed Date: 12/18/2008.
Accession Number: 20081222–0003.
Comment Date: 5 p.m. Eastern Time
on Friday, January 2, 2009.
Docket Numbers: RP09–180–000.
Applicants: Colorado Interstate Gas
Company.
Description: Colorado Interstate Gas
Company submits Third Revised Sheet
7C et al. to FERC Gas Tariff, First
Revised Volume 1, to be effective 12/1/
08.
Filed Date: 12/22/2008.
Accession Number: 20081224–0087.
Comment Date: 5 p.m. Eastern Time
on Monday, January 5, 2009.
Docket Numbers: RP09–181–000.
Applicants: Cimarron River Pipeline,
LLC.
Description: Cimarron River Pipeline,
LLC submits First Revised Sheet 307 et
al. to FERC Gas Tariff, Original Volume
1, to be effective 1/19/09.
Filed Date: 12/22/2008.
Accession Number: 20081224–0088.
Comment Date: 5 p.m. Eastern Time
on Monday, January 5, 2009.
Docket Numbers: RP09–182–000.
Applicants: Dauphin Island Gathering
Partners.
Description: Dauphin Island
Gathering Partners submits First revised
Sheet 210 et al. to FERC Gas Tariff, First
Revised Volume 1.
Filed Date: 12/22/2008.
Accession Number: 20081224–0089.
Comment Date: 5 p.m. Eastern Time
on Monday, January 5, 2009.
VerDate Aug<31>2005
14:05 Jan 02, 2009
Jkt 217001
Docket Numbers: RP09–183–000.
Applicants: Transcontinental Gas
Pipe Line Corp.
Description: Request for Waiver of
Section 284.8(h)(1) of the Regulations.
Filed Date: 12/24/2008.
Accession Number: 20081224–5056.
Comment Date: 5 p.m. Eastern Time
on Monday, January 5, 2009.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.
Deputy Secretary.
[FR Doc. E8–31273 Filed 1–2–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 803–087]
Butte County, CA; Notice of
Availability of Environmental
Assessment
December 29, 2008.
In accordance with the National
Environmental Policy Act (NEPA) of
1969 and the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47879), the Office of Energy
Projects has reviewed the application
for a new license for the DeSablaCenterville Hydroelectric Project
(project), located on Butt Creek in Butt
County, California, and has prepared an
Environmental Assessment (EA). In the
EA, Commission staff analyze the
potential environmental effects of
licensing the project and conclude that
issuing a license for the project, with
appropriate environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
Any comments should be filed within
60 days from the issuance date of this
notice, and should be addressed to the
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Room 1–A, Washington, DC 20426.
Please affix ‘‘DeSabla-Centerville
Hydroelectric Project No. 803–087’’ to
all comments. Comments may be filed
electronically via Internet in lieu of
paper. The Commission strongly
encourages electronic filings (See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link.) For
E:\FR\FM\05JAN1.SGM
05JAN1
Federal Register / Vol. 74, No. 2 / Monday, January 5, 2009 / Notices
277
further information, contact Kenneth
Hogan at (202) 502–8434.
Comment Date: 5 p.m. Eastern Time
on January 5, 2009.
ENVIRONMENTAL PROTECTION
AGENCY
Kimberly D. Bose,
Secretary.
[FR Doc. E8–31312 Filed 1–2–09; 8:45 am]
Kimberly D. Bose,
Secretary.
[FR Doc. E8–31311 Filed 1–2–09; 8:45 am]
[EPA–HQ–OPPT–2008–0908; FRL–8397–3]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket Nos. EL03–173–005; EL03–201–007]
[Project No. 2082–027; Oregon and
California]
Sempra Energy Trading LLC; Notice of
Filing
December 24, 2008.
Take notice that on December 15,
2008, Sempra Energy Trading LLC filed
an amendment to its Agreement and
Stipulation in compliance with the
Commission’s November 14, 2008,
Order Denying Rehearing, Coral Power,
L.L.C., 125 FERC ¶ 61,176 (2008).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
VerDate Aug<31>2005
14:05 Jan 02, 2009
Jkt 217001
PacifiCorp; Notice of Public Meetings
Concerning the Relicensing of the
Klamath Hydroelectric Project
December 24, 2008.
On February 25, 2004, PacifiCorp
filed an application to relicense its 169MW Klamath Hydroelectric Project. In
November 2007, Commission staff
issued its final Environmental Impact
Statement, in which it analyzed a
number of alternatives for relicensing
the project. To date, neither the states of
Oregon nor California have acted on
PacifiCorp’s requests for certification
under section 401 of the Clean Water
Act, precluding Commission action on
the license application.
On November 24, 2008, PacifiCorp
filed an Agreement in Principle,
executed among PacifiCorp; the U.S.
Departments of Agriculture, Commerce,
and the Interior; and the States of
California and Oregon, for the continued
operation and potential future removal
of Klamath Project dams.
The Agreement in Principle is
complex and may have a significant
effect on the analysis of PacifiCorp’s
relicense application. The compatibility
of the Agreement with the licensing
process and the appropriate procedures
for the continued processing of the
application will be discussed.
Commission staff will hold two public
meetings to obtain public comment on
these matters. The meetings will be held
as follows.
Date: Thursday, January 29, 2009.
Time: 1 p.m. and 7 p.m. (PST).
Place: Best Western Miner’s Inn.
Address: 122 East Miner Street, Yreka,
California.
For further information, please
contact John Mudre at e-mail address
john.mudre@ferc.gov or by telephone at
(202) 502–8902.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–31308 Filed 1–2–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Certain New Chemicals; Receipt and
Status Information
SUMMARY: Section 5 of the Toxic
Substances Control Act (TSCA) requires
any person who intends to manufacture
(defined by statute to include import) a
new chemical (i.e., a chemical not on
the TSCA Inventory) to notify EPA and
comply with the statutory provisions
pertaining to the manufacture of new
chemicals. Under sections 5(d)(2) and
5(d)(3) of TSCA, EPA is required to
publish a notice of receipt of a
premanufacture notice (PMN) or an
application for a test marketing
exemption (TME), and to publish
periodic status reports on the chemicals
under review and the receipt of notices
of commencement to manufacture those
chemicals. This status report, which
covers the period from November 17,
2008 through November 28, 2008,
consists of the PMNs pending or
expired, and the notices of
commencement to manufacture a new
chemical that the Agency has received
under TSCA section 5 during this time
period.
DATES: Comments identified by the
specific PMN number or TME number,
must be received on or before February
4, 2009.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPPT–2008–0908, by
one of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the on-line
instructions for submitting comments.
• Mail: Document Control Office
(7407M), Office of Pollution Prevention
and Toxics (OPPT), Environmental
Protection Agency, 1200 Pennsylvania
Ave., NW., Washington, DC 20460–
0001.
• Hand Delivery: OPPT Document
Control Office (DCO), EPA East Bldg.,
Rm. 6428, 1201 Constitution Ave., NW.,
Washington, DC. Attention: Docket ID
Number EPA–HQ–OPPT–2008–0908.
The DCO is open from 8 a.m. to 4 p.m.,
Monday through Friday, excluding legal
holidays. The telephone number for the
DCO is (202) 564–8930. Such deliveries
are only accepted during the DCO’s
normal hours of operation, and special
arrangements should be made for
deliveries of boxed information.
Instructions: Direct your comments to
docket ID number EPA–HQ–OPPT–
E:\FR\FM\05JAN1.SGM
05JAN1
Agencies
[Federal Register Volume 74, Number 2 (Monday, January 5, 2009)]
[Notices]
[Pages 276-277]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-31312]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 803-087]
Butte County, CA; Notice of Availability of Environmental
Assessment
December 29, 2008.
In accordance with the National Environmental Policy Act (NEPA) of
1969 and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office
of Energy Projects has reviewed the application for a new license for
the DeSabla-Centerville Hydroelectric Project (project), located on
Butt Creek in Butt County, California, and has prepared an
Environmental Assessment (EA). In the EA, Commission staff analyze the
potential environmental effects of licensing the project and conclude
that issuing a license for the project, with appropriate environmental
measures, would not constitute a major federal action significantly
affecting the quality of the human environment.
A copy of the EA is on file with the Commission and is available
for public inspection. The EA may also be viewed on the Commission's
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676,
or for TTY, (202) 502-8659.
Any comments should be filed within 60 days from the issuance date
of this notice, and should be addressed to the Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Room 1-A,
Washington, DC 20426. Please affix ``DeSabla-Centerville Hydroelectric
Project No. 803-087'' to all comments. Comments may be filed
electronically via Internet in lieu of paper. The Commission strongly
encourages electronic filings (See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site under the ``eFiling'' link.)
For
[[Page 277]]
further information, contact Kenneth Hogan at (202) 502-8434.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-31312 Filed 1-2-09; 8:45 am]