Golden Green Energy Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene and Competing Applications, 269 [E8-31310]
Download as PDF
Federal Register / Vol. 74, No. 2 / Monday, January 5, 2009 / Notices
Information Relay Service (FIRS) at 1–
800–877–8339.
[FR Doc. E8–31372 Filed 1–2–09; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Office of Science; High Energy Physics
Advisory Panel
Department of Energy.
Notice of open meeting.
AGENCY:
ACTION:
This notice announces a
meeting of the High Energy Physics
Advisory Panel (HEPAP). Federal
Advisory Committee Act (Pub. L. 92–
463, 86 Stat. 770) requires that public
notice of these meetings be announced
in the Federal Register.
DATES: Tuesday, February 24, 2009; 10
a.m. to 6 p.m. and Wednesday, February
25, 2009; 8:30 a.m. to 4 p.m.
ADDRESSES: Hilton Rockville Hotel &
Executive Meeting Center, 1750
Rockville Pike, Rockville, MD 20852
FOR FURTHER INFORMATION CONTACT: John
Kogut, Executive Secretary; High Energy
Physics Advisory Panel; U.S.
Department of Energy; SC–25/
Germantown Building, 1000
Independence Avenue, SW.,
Washington, DC 20585–1290;
Telephone: 301–903–1298.
SUPPLEMENTARY INFORMATION:
Purpose of Meeting: To provide
advice and guidance on a continuing
basis with respect to the High Energy
Physics Research program.
SUMMARY:
Tentative Agenda
Agenda will include discussions of
the following:
Tuesday, February 24, 2009, and
Wednesday, February 25, 2009
• Discussion of Department of Energy
High Energy Physics Program.
• Discussion of National Science
Foundation Elementary Particle Physics
Program.
• Reports on and Discussions of
Topics of General Interest in High
Energy Physics.
• Public Comment (10-minute rule).
Public Participation: The meeting is
open to the public. If you would like to
file a written statement with the Panel,
you may do so either before or after the
meeting. If you would like to make oral
statements regarding any of these items
on the agenda, you should contact John
Kogut, 301–903–1298 or
John.Kogut@science.doe.gov (e-mail).
You must make your request for an oral
statement at least 5 business days before
the meeting. Reasonable provision will
VerDate Aug<31>2005
14:05 Jan 02, 2009
Jkt 217001
be made to include the scheduled oral
statements on the agenda. The
Chairperson of the Panel will conduct
the meeting to facilitate the orderly
conduct of business. Public comment
will follow the 10-minute rule.
Minutes: The minutes of the meeting
will be available for public review and
copying within 90 days on the High
Energy Physics Advisory Panel Web
site. Minutes will also be available by
writing or calling John Kogut at the
address and phone number listed above.
Issued at Washington, DC on December 29,
2008.
Rachel Samuel,
Deputy Committee Management Officer.
[FR Doc. E8–31269 Filed 1–2–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13291–000]
Golden Green Energy Storage, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene and Competing Applications
December 24, 2008.
On November 14, 2008, Golden Green
Energy Storage, LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act (FPA), proposing
to study the feasibility of the Cliffs
Energy Pumped Storage Project to be
located in Klickitat County, Washington
partially on lands owned by the
Department of the Army. The proposed
project utilizes water from Lake
Umatilla on the Columbia River.
The proposed project would consist
of: (1) An upper earthen dam with a
length of 5,200 feet and height of 260
feet; (2) an upper reservoir with a
surface area of 219 acres, a capacity of
14,000 acre-feet, and a maximum pool
elevation of 2,436 feet msl; (3) a lower
earthen dam with a length of 9,500 feet
and a height of 120 feet; (4) a lower
reservoir with a surface area of 209
acres, a capacity of 14,000 acre-feet, and
a maximum pool elevation of 624 feet
msl; (5) an 8,000 foot long, 25 foot
diameter concrete penstock; (6) a
powerhouse containing 4 pump/turbine
units with a total installed capacity of
1,050 MW; (7) a 5 mile long, 500 kV
transmission line and; (8) appurtenant
facilities. The proposed project would
have an annual production of 21 GWh
which would be sold to a local utility.
Applicant Contact: Scott Tillman,
3313 West Second St, The Dalles, OR
97058, (541) 298–0819.
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
269
FERC Contact: Steven Sachs (202)
502–8666.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent and competing
applications may be filed electronically
via the internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13291) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–31310 Filed 1–2–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 13159–000 and 13230–000;
Project No. 13231–000]
City of Marseilles, IL; Marseilles Land
and Water Company; Notice of
Competing Preliminary Permit
Applications Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
December 24, 2008.
The City of Marseilles, Illinois (City)
and the Marseilles Land and Water
Company (Land and Water Company)
have filed applications, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of
projects on the North and South Head
Races of the Illinois River in La Salle
County, Illinois. The proposed projects
would use the U.S. Army Corps of
Engineers’ Marseilles Lock and Dam.
On March 31, 2008, the City filed an
application, Project No. 13159, for the
proposed Marseilles Hydroelectric
E:\FR\FM\05JAN1.SGM
05JAN1
Agencies
[Federal Register Volume 74, Number 2 (Monday, January 5, 2009)]
[Notices]
[Page 269]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-31310]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13291-000]
Golden Green Energy Storage, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene and Competing Applications
December 24, 2008.
On November 14, 2008, Golden Green Energy Storage, LLC filed an
application, pursuant to section 4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the Cliffs Energy Pumped Storage
Project to be located in Klickitat County, Washington partially on
lands owned by the Department of the Army. The proposed project
utilizes water from Lake Umatilla on the Columbia River.
The proposed project would consist of: (1) An upper earthen dam
with a length of 5,200 feet and height of 260 feet; (2) an upper
reservoir with a surface area of 219 acres, a capacity of 14,000 acre-
feet, and a maximum pool elevation of 2,436 feet msl; (3) a lower
earthen dam with a length of 9,500 feet and a height of 120 feet; (4) a
lower reservoir with a surface area of 209 acres, a capacity of 14,000
acre-feet, and a maximum pool elevation of 624 feet msl; (5) an 8,000
foot long, 25 foot diameter concrete penstock; (6) a powerhouse
containing 4 pump/turbine units with a total installed capacity of
1,050 MW; (7) a 5 mile long, 500 kV transmission line and; (8)
appurtenant facilities. The proposed project would have an annual
production of 21 GWh which would be sold to a local utility.
Applicant Contact: Scott Tillman, 3313 West Second St, The Dalles,
OR 97058, (541) 298-0819.
FERC Contact: Steven Sachs (202) 502-8666.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent and competing
applications may be filed electronically via the internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
For more information on how to submit these types of filings please
go to the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of the Commission's Web site at http:/
/www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13291) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-31310 Filed 1-2-09; 8:45 am]
BILLING CODE 6717-01-P