Environmental Impact Statements and Regulations; Availability of EPA Comments, 79471-79472 [E8-30909]
Download as PDF
Federal Register / Vol. 73, No. 249 / Monday, December 29, 2008 / Notices
the contents of the docket, and to access
those documents in the public docket
that are available electronically. Once in
the system, select ‘‘search,’’ then key in
the docket ID number identified in this
document.
dwashington3 on PROD1PC60 with NOTICES
What Particular Information Is of
Interest to EPA?
Pursuant to section 3506(c)(2)(A) of
the PRA, EPA specifically solicits
comments and information to enable it
to:
(i) Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the Agency, including
whether the information will have
practical utility;
(ii) evaluate the accuracy of the
Agency’s estimate of the burden of the
proposed collection of information,
including the validity of the
methodology and assumptions used;
(iii) enhance the quality, utility, and
clarity of the information to be
collected; and
(iv) minimize the burden of the
collection of information on those who
are to respond, including through the
use of appropriate automated electronic,
mechanical, or other technological
collection techniques or other forms of
information technology, e.g., permitting
electronic submission of responses. In
particular, EPA is requesting comments
from very small businesses (those that
employ less than 25) on examples of
specific additional efforts that EPA
could make to reduce the paperwork
burden for very small businesses
affected by this collection.
What Should I Consider When
Preparing Comments for EPA?
You may find the following
suggestions helpful for preparing your
comments:
1. Explain your views as clearly as
possible and provide specific examples.
2. Describe any assumptions that you
used.
3. Provide copies of any technical
information and/or data you used that
support your views.
4. If you estimate potential burden or
costs, explain how you arrived at the
estimate that you provide.
5. Offer alternative ways to improve
the collection activity.
6. Make sure to submit your
comments by the deadline identified
under DATES.
7. To ensure proper receipt by EPA,
be sure to identify the docket ID number
assigned to this action in the subject
line on the first page of your response.
You may also provide the name, date,
and Federal Register citation.
VerDate Aug<31>2005
13:19 Dec 24, 2008
Jkt 217001
To What Information Collection
Activity or ICR Does This Apply?
In compliance with the Paperwork
Reduction Act (44 U.S.C. 3501 et seq.),
this notice announces that EPA is
planning to submit the following ICR for
renewal: NSPS for Stationary
Compression Ignition Internal
Combustion Engines; EPA ICR Number
2196.03, OMB Control Number 2060–
0590; Docket ID Number EPA–HQ–
OECA–2008–0899.
Affected entities: Entities potentially
affected by this action are facilities with
stationary compression internal
combustion engines.
Title: NSPS for Stationary
Compression Ignition Internal
Combustion Engines (40 CFR Part 60,
Subpart IIII).
ICR numbers: EPA ICR Number
2196.03, OMB Control Number 2060–
0590.
ICR status: This ICR is currently
scheduled to expire on August 31, 2009.
An Agency may not conduct or sponsor,
and a person is not required to respond
to, a collection of information, unless it
displays a currently valid OMB control
number. The OMB control numbers for
EPA’s regulations in title 40 of the CFR,
after appearing in the Federal Register
when approved, are listed in 40 CFR
part 9, are displayed either by
publication in the Federal Register or
by other appropriate means, such as on
the related collection instrument or
form, if applicable. The display of OMB
control numbers in certain EPA
regulations is consolidated in 40 CFR
part 9.
Abstract: The affected entities are
subject to the General Provisions of the
NSPS at 40 CFR part 60, subpart A and
any changes, or additions to the General
Provisions specified at 40 CFR part 60,
subpart IIII.
Owners or operators of the affected
facilities must make an initial
notification and keep records related to
engine performance.
Burden Statement: The existing ICR
provides a detailed explanation of the
Agency’s estimate, which is only briefly
summarized below. The annual public
reporting and recordkeeping burden for
this collection of information is
estimated to average approximately one
hour per response.
Estimated Number of Respondents:
152,546.
Frequency of Response: Initially.
Estimated Total Annual Hour Burden:
152,733.
Estimated Total Annual Cost:
$242,000, which is comprised of no
annualized capital/startup costs and
O&M costs of $242,000.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
79471
Are There Changes in the Estimates
from the Last Approval?
It is anticipated that the number of
respondents will increase to
approximately 210,000 for this ICR due
to full implementation of the standard
so that it covers all affected entities. The
existing ICR uses the average number of
respondents during the initial period of
implementation.
What Is the Next Step in the Process for
This ICR?
EPA will consider the comments
received and amend the ICR as
appropriate. The final ICR package will
then be submitted to OMB for review
and approval pursuant to 5 CFR
1320.12. At that time, EPA will issue
another Federal Register notice
pursuant to 5 CFR 1320.5(a)(1)(iv) to
announce the submission of the ICR to
OMB and the opportunity to submit
additional comments to OMB. If you
have any questions about this ICR or the
approval process, please contact the
technical person listed under FOR
FURTHER INFORMATION CONTACT.
Dated: December 16, 2008.
Lisa Lund,
Director, Office of Compliance.
[FR Doc. E8–30821 Filed 12–24–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8588–9]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 6, 2008 (73 FR 19833).
Draft EISs
EIS No. 20080297, ERP No. D–IBR–
K65345–CA, Lake Casitas Resource
Management Plan (RMP),
Implementation, Cities of Los Angeles
and Ventura, Western Ventura
County, CA.
Summary: EPA expressed
environmental concerns about impacts
to environmental resources and impacts
from noise. Rating EC2.
E:\FR\FM\29DEN1.SGM
29DEN1
79472
Federal Register / Vol. 73, No. 249 / Monday, December 29, 2008 / Notices
dwashington3 on PROD1PC60 with NOTICES
EIS No. 20080357, ERP No. D–FRC–
K05066–CA, Big Creek Hydro Project
(FERC Nos. 67, 120, 2085, and 2175)
Proposes to Relicenses, Big Creek Nos.
2A, 8 and Eastwood—FERC No. 67;
Big Creek Nos. 1 and 2—FERC No.
2175; Mammoth Pool—FERC No.
2085 and Big Creek No. 3 FERC No.
120, Fresno and Madera Counties, CA.
Summary: EPA expressed
environmental concerns about impacts
related to construction activities. EPA
requested additional information on the
impacts of climate change on the project
and the analysis of cumulative impacts.
Rating EC2.
EIS No. 20080398, ERP No. D–NIH–
J81013–MT, Rocky Mountain
Laboratories (RML) Master Plan,
Implementation, Hamilton, Ravalli
County, MT.
Summary: EPA expressed
environmental concerns about air
quality, environmental justice and
safety/security impacts. Rating EC2.
EIS No. 20080409, ERP No. D–COE–
J11025–CO, Fort Carson Grow the
Army Stationing Decision,
Constructing New Facilities to
Support Additional Soldiers and their
Families, Portions of El Paso, Pueblo
and Fremont Counties, CO.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20080432, ERP No. D–COE–
G39051–LA, Mississippi River-Gulf
Outlet (MRGO), Louisiana, and Lake
Borgne Wetland Creation and
Shoreline Protection Project, Proposes
to Construct Shoreline Protection
Features Along the Lake Borgne
Shoreline to Restore and Nourish
Wetlands, Lake Borgne, LA.
Summary: EPA expressed
environmental concerns about water
quality and sediment budget impacts.
Rating EC2.
EIS No. 20080464, ERP No. DS–AFS–
F65062–MN, Echo Trail Area Forest
Management Project, Updated
Information to Amend to Further
Address Water Quality and Watershed
Health, Superior National Forest,
Lacroix Ranger District and
Kawishiwi Ranger District, St. Louis
and Lake Counties, MN.
Summary: EPA does not object to the
proposed action. Rating LO.
Final EISs
EIS No. 20080351, ERP No. F–SFW–
K99039–NV, Coyote Spring
Investment Multispecies Conservation
Plan, Issuing a 40-year Incidental
Take Permit for Five Species, Clark
and Lincoln Counties, NV.
VerDate Aug<31>2005
13:19 Dec 24, 2008
Jkt 217001
Summary: EPA expressed
environmental concerns about
groundwater planning and impacts to
biological resources.
EIS No. 20080373, ERP No. F–FHW–
E40339–NC, NC 12 Replacement of
Herbert C. Bonner Bridge (Bridge No.
11) Revisions and Additions, over
Oregon Inlet Construction, Funding,
U.S. Coast Guard Permit, Special-UsePermit, Right-of-Way Permit, U.S.
Army COE Section 10 and 404
Permits, Dare County, NC.
Summary: EPA continues to have
environmental concerns about building
additional bridges through a national
wildlife refuge and national seashore
and the related water quality and
migratory bird impacts.
EIS No. 20080452, ERP No. F–GSA–
D80032–DC, Department of Homeland
Security Headquarters at the St.
Elizabeths West Campus, To
Consolidate Federal Office Space on a
Secure Site, Washington, DC.
Summary: EPA continues to have
environmental concerns about the East
Campus resource impacts.
EIS No. 20080454, ERP No. F–OSM–
K65321–00, Black Mesa Project,
Revisions to the Life-of-Mine
Operation and Reclamation for the
Kayenta and Black Mesa Surface-Coal
Mining Operations, Right-of-Way
Grant, Mohave, Navajo, Coconino and
Yavapai Counties, AZ and Clark
County, NV.
Summary: EPA does not object to this
project.
EIS No. 20080457, ERP No. F–APH–
A82128–00, PROGRAMMATIC—Use
of Genetically Engineered Fruit Fly
and Pink Bollworm in APHIS Plant
Pest Control Programs,
Implementation.
Summary: EPA does not object to the
proposed action.
EIS No. 20080458, ERP No. F–COE–
K39113–CA, Natomas Levee
Improvement Project, Issuing of 408
Permission and 404 Permit,
Sacramento Area Flood Control
Agency, Sutter and Sacramento, CA.
Summary: EPA continues to have
environmental concerns with the
residual flood risk to development in a
floodplain protected by levees, and
indirect and cumulative environmental
effects. We recommended the ROD
describe how future development will
not compromise the flood-risk-reduction
achievements of this project or constrain
flood protection management; and how
future development adheres to, and
does not undermine, the Natomas Basin
Habitat Conservation Plan. EPA
recommended implementation of the
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Natomas Basin flood safety plan prior to
additional development, when feasible.
EIS No. 20080463, ERP No. F–FAA–
G52000–NM, Spaceport America
Commercial Launch Site, Proposal to
Develop and Operate, Issuance of
License, Sierra County, NM.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20080466, ERP No. F–USN–
A11081–00, Introduction of the P–8A
MMA into the U.S. Navy Fleet, To
Provide Facilities and Functions that
Support the Homebasing of 12 P–8A
Multi-Mission Maritime Aircraft
(MMA) Fleet Squardrons (72 Aircraft)
and one Fleet Replacement Squadron
(FRS), which include the Following
Installations: Naval Air Station
Jacksonville, FL; Naval Air Station
Whidbey Island, WA; Naval Air
Station North Island, CA; Marine
Corps Base HI and Kaneohe Bay, HI.
Summary: EPA does not object to the
proposed action.
EIS No. 20080492, ERP No. F–NPS–
F65070–MI, Sleeping Bear Dunes
National Lakeshore, General
Management Plan and Wilderness
Study, Implementation, Benzie and
Leelanau Counties, MI.
Summary: EPA does not object to the
proposed action. We recommend that
the Record of Decision discuss possible
negative effects of allowing electric
motors on some inland lakes.
EIS No. 20080498, ERP No. F–NOA–
K90031–CA, Channel Islands National
Marine Sanctuary Management Plan,
Implementation, Santa Barbara and
Ventura Counties, CA.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20080459, ERP No. FS–COE–
K35044–CA, Berth 136–147 [TraPac]
Container Terminal Project, Updated
Information on the Draft General
Conformity Determination, Upgrade
Existing Wharf Facilities, Install a
Buffer Area between the Terminal and
Community, U.S. Army COE Section
10 and 404 Permit, West Basin
Portion of the Port of Los Angeles,
CA.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: December 22, 2008.
Clifford Rader,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E8–30909 Filed 12–24–08; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\29DEN1.SGM
29DEN1
Agencies
[Federal Register Volume 73, Number 249 (Monday, December 29, 2008)]
[Notices]
[Pages 79471-79472]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-30909]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8588-9]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7146.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 6, 2008 (73 FR
19833).
Draft EISs
EIS No. 20080297, ERP No. D-IBR-K65345-CA, Lake Casitas Resource
Management Plan (RMP), Implementation, Cities of Los Angeles and
Ventura, Western Ventura County, CA.
Summary: EPA expressed environmental concerns about impacts to
environmental resources and impacts from noise. Rating EC2.
[[Page 79472]]
EIS No. 20080357, ERP No. D-FRC-K05066-CA, Big Creek Hydro Project
(FERC Nos. 67, 120, 2085, and 2175) Proposes to Relicenses, Big Creek
Nos. 2A, 8 and Eastwood--FERC No. 67; Big Creek Nos. 1 and 2--FERC No.
2175; Mammoth Pool--FERC No. 2085 and Big Creek No. 3 FERC No. 120,
Fresno and Madera Counties, CA.
Summary: EPA expressed environmental concerns about impacts related
to construction activities. EPA requested additional information on the
impacts of climate change on the project and the analysis of cumulative
impacts. Rating EC2.
EIS No. 20080398, ERP No. D-NIH-J81013-MT, Rocky Mountain Laboratories
(RML) Master Plan, Implementation, Hamilton, Ravalli County, MT.
Summary: EPA expressed environmental concerns about air quality,
environmental justice and safety/security impacts. Rating EC2.
EIS No. 20080409, ERP No. D-COE-J11025-CO, Fort Carson Grow the Army
Stationing Decision, Constructing New Facilities to Support Additional
Soldiers and their Families, Portions of El Paso, Pueblo and Fremont
Counties, CO.
Summary: EPA does not object to the proposed action. Rating LO.
EIS No. 20080432, ERP No. D-COE-G39051-LA, Mississippi River-Gulf
Outlet (MRGO), Louisiana, and Lake Borgne Wetland Creation and
Shoreline Protection Project, Proposes to Construct Shoreline
Protection Features Along the Lake Borgne Shoreline to Restore and
Nourish Wetlands, Lake Borgne, LA.
Summary: EPA expressed environmental concerns about water quality
and sediment budget impacts. Rating EC2.
EIS No. 20080464, ERP No. DS-AFS-F65062-MN, Echo Trail Area Forest
Management Project, Updated Information to Amend to Further Address
Water Quality and Watershed Health, Superior National Forest, Lacroix
Ranger District and Kawishiwi Ranger District, St. Louis and Lake
Counties, MN.
Summary: EPA does not object to the proposed action. Rating LO.
Final EISs
EIS No. 20080351, ERP No. F-SFW-K99039-NV, Coyote Spring Investment
Multispecies Conservation Plan, Issuing a 40-year Incidental Take
Permit for Five Species, Clark and Lincoln Counties, NV.
Summary: EPA expressed environmental concerns about groundwater
planning and impacts to biological resources.
EIS No. 20080373, ERP No. F-FHW-E40339-NC, NC 12 Replacement of Herbert
C. Bonner Bridge (Bridge No. 11) Revisions and Additions, over Oregon
Inlet Construction, Funding, U.S. Coast Guard Permit, Special-Use-
Permit, Right-of-Way Permit, U.S. Army COE Section 10 and 404 Permits,
Dare County, NC.
Summary: EPA continues to have environmental concerns about
building additional bridges through a national wildlife refuge and
national seashore and the related water quality and migratory bird
impacts.
EIS No. 20080452, ERP No. F-GSA-D80032-DC, Department of Homeland
Security Headquarters at the St. Elizabeths West Campus, To Consolidate
Federal Office Space on a Secure Site, Washington, DC.
Summary: EPA continues to have environmental concerns about the
East Campus resource impacts.
EIS No. 20080454, ERP No. F-OSM-K65321-00, Black Mesa Project,
Revisions to the Life-of-Mine Operation and Reclamation for the Kayenta
and Black Mesa Surface-Coal Mining Operations, Right-of-Way Grant,
Mohave, Navajo, Coconino and Yavapai Counties, AZ and Clark County, NV.
Summary: EPA does not object to this project.
EIS No. 20080457, ERP No. F-APH-A82128-00, PROGRAMMATIC--Use of
Genetically Engineered Fruit Fly and Pink Bollworm in APHIS Plant Pest
Control Programs, Implementation.
Summary: EPA does not object to the proposed action.
EIS No. 20080458, ERP No. F-COE-K39113-CA, Natomas Levee Improvement
Project, Issuing of 408 Permission and 404 Permit, Sacramento Area
Flood Control Agency, Sutter and Sacramento, CA.
Summary: EPA continues to have environmental concerns with the
residual flood risk to development in a floodplain protected by levees,
and indirect and cumulative environmental effects. We recommended the
ROD describe how future development will not compromise the flood-risk-
reduction achievements of this project or constrain flood protection
management; and how future development adheres to, and does not
undermine, the Natomas Basin Habitat Conservation Plan. EPA recommended
implementation of the Natomas Basin flood safety plan prior to
additional development, when feasible.
EIS No. 20080463, ERP No. F-FAA-G52000-NM, Spaceport America Commercial
Launch Site, Proposal to Develop and Operate, Issuance of License,
Sierra County, NM.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20080466, ERP No. F-USN-A11081-00, Introduction of the P-8A MMA
into the U.S. Navy Fleet, To Provide Facilities and Functions that
Support the Homebasing of 12 P-8A Multi-Mission Maritime Aircraft (MMA)
Fleet Squardrons (72 Aircraft) and one Fleet Replacement Squadron
(FRS), which include the Following Installations: Naval Air Station
Jacksonville, FL; Naval Air Station Whidbey Island, WA; Naval Air
Station North Island, CA; Marine Corps Base HI and Kaneohe Bay, HI.
Summary: EPA does not object to the proposed action.
EIS No. 20080492, ERP No. F-NPS-F65070-MI, Sleeping Bear Dunes National
Lakeshore, General Management Plan and Wilderness Study,
Implementation, Benzie and Leelanau Counties, MI.
Summary: EPA does not object to the proposed action. We recommend
that the Record of Decision discuss possible negative effects of
allowing electric motors on some inland lakes.
EIS No. 20080498, ERP No. F-NOA-K90031-CA, Channel Islands National
Marine Sanctuary Management Plan, Implementation, Santa Barbara and
Ventura Counties, CA.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20080459, ERP No. FS-COE-K35044-CA, Berth 136-147 [TraPac]
Container Terminal Project, Updated Information on the Draft General
Conformity Determination, Upgrade Existing Wharf Facilities, Install a
Buffer Area between the Terminal and Community, U.S. Army COE Section
10 and 404 Permit, West Basin Portion of the Port of Los Angeles, CA.
Summary: No formal comment letter was sent to the preparing agency.
Dated: December 22, 2008.
Clifford Rader,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E8-30909 Filed 12-24-08; 8:45 am]
BILLING CODE 6560-50-P