Sunshine Act Meeting Notice, 76630-76632 [E8-29887]
Download as PDF
76630
Federal Register / Vol. 73, No. 243 / Wednesday, December 17, 2008 / Notices
hereby invited to attend the meeting.
Please RSVP your attendance by
notifying David Turner via e-mail at
david.turner@ferc.gov by close of
business Tuesday, February 10, 2009.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–13058–000–WA]
Grays Harbor Ocean Energy Project;
Notice of Licensing Outreach Meeting:
Understanding the FERC Licensing
Process
Kimberly D. Bose,
Secretary.
[FR Doc. E8–29872 Filed 12–16–08; 8:45 am]
Note: Items listed on the agenda may be
deleted without further notice.
BILLING CODE 6717–01–P
December 10, 2008.
a. Project: Grays Harbor Ocean Energy
Project, Grays Harbor County,
Washington.
b. Date and Time of Meeting:
Tuesday, February 24, 2009, 9 a.m. to 11
a.m. (PST); and 7 p.m. to 9 p.m.
c. Place: Ocean Shores Convention
Center, 120 W Chance A La Mer NW
Ocean Shores, WA. 98569.
d. Purpose of the Meeting: Explain the
licensing and permitting process for
hydrokinetic technologies.
e. All local, State, and Federal
agencies, and interested parties, are
Date and Time: December 18, 2008, 10
a.m.
Place: Room 2C, 888 First Street, NE.,
Washington, DC 20426.
Status: Open.
Matters to be Considered: Agenda.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
December 11, 2008.
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. No. 94–409), 5 U.S.C. 552b:
Agency Holding Meeting: Federal
Energy Regulatory Commission.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400. For a recorded message
listing items struck from or added to the
meeting, call (202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
942ND—MEETING
Item No
Docket No.
Company
Administrative
A–1 ........
A–2 ........
A–3 ........
AD02–1–000 ................................................
AD02–7–000 ................................................
AD06–3–000 ................................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Energy Market Update.
Electric
E–1 ........
EL02–28–006, EL02–33–007, EL02–38–
006.
EL02–29–006, EL02–30–006, EL02–31–
006.
EL02–32–006, EL02–34–006, EL02–39–
006.
EL02–43–006 ..............................................
EL02–56–006 ..............................................
E–2 ........
E–3 ........
EL08–34–002 ..............................................
EL08–47–002 ..............................................
ER07–1372–002, ER07–1372–005, ER07–
1372–011, ER07–1372–013.
ER08–1254–000 ..........................................
........
........
........
........
ER08–1257–000, ER08–1257–001 ............
ER09–24–000 ..............................................
ER07–1372–007 ..........................................
ER09–14–000, ER09–14–001 ....................
ER09–88–000 ..............................................
RM04–7–005 ...............................................
E–8 ........
E–9 ........
RC08–1–001 ...............................................
RC09–3–000 ...............................................
E–10 ......
RR06–1–016, RR06–1–017 ........................
pwalker on PROD1PC71 with NOTICES
E–4
E–5
E–6
E–7
RR07–1–004 ...............................................
RR07–2–004 ...............................................
RR07–3–004, RR07–3–005 ........................
VerDate Aug<31>2005
18:58 Dec 16, 2008
Jkt 217001
PO 00000
Nevada Power Company and Sierra Pacific Power Company v. Enron Power Marketing, Inc.; El Paso Merchant Energy; American Electric Power Services Corporation.
Nevada Power Company v. Morgan Stanley Capital Group; Calpine Energy Services;
Mirant Americas Energy Marketing, L.P.
Reliant Energy Services; BP Energy Company; Allegheny Energy Supply Company,
L.L.C.
Southern California Water Company v. Mirant Americas Energy Marketing L.P.
Public Utility District No. 1 Snohomish County, Washington v. Morgan Stanley Capital
Group, Inc.
Maryland Public Service Commission v. PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc. and Transmission Owners
of the Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
NSTAR Electric Company.
Southern Company Services, Inc.
Market-Based Rates For Wholesale Sales of Electric Energy, Capacity and Ancillary
Services By Public Utilities.
Southeastern Power Administration.
North American Electric Reliability Corporation and Northeast Power Coordinating
Council, Inc.
North American Electric Reliability Council, North American Electric Reliability Corporation.
Delegation Agreement Between the North American Electric Reliability Corporation and
Texas Regional Entity, a division of ERCOT.
Delegation Agreement Between the North American Electric Reliability Corporation and
Midwest Reliability Organization.
Delegation Agreement Between the North American Electric Reliability Corporation and
Northeast Power Coordinating Council, Inc.
Frm 00024
Fmt 4703
Sfmt 4703
E:\FR\FM\17DEN1.SGM
17DEN1
Federal Register / Vol. 73, No. 243 / Wednesday, December 17, 2008 / Notices
76631
942ND—MEETING—Continued
Item No
Docket No.
Company
RR07–4–004 ...............................................
RR07–5–005 ...............................................
RR07–6–004 ...............................................
RR07–7–004, RR07–7–005 ........................
RR07–8–004, RR07–8–005 ........................
E–11
E–12
E–13
E–14
......
......
......
......
E–23 ......
E–24 ......
ER09–149–000 ............................................
ER08–1051–000, ER08–1051–001 ............
ER08–1256–000, ER08–1256–001 ............
ER09–15–000 ..............................................
ER09–97–000 ..............................................
ER08–1055–000, ER08–1055–001 ............
ER08–1042–000, ER08–1042–001, ER08–
1042–002.
OMITTED.
ER09–209–000 ............................................
ER09–239–000 ............................................
ER09–12–000 ..............................................
ER09–187–000, ER08–1343–000, ER08–
1353–000.
OMITTED.
ER07–869–004, ER07–475–005, ER06–
615–030.
ER08–375–002 ............................................
ER96–78–020 ..............................................
E–25 ......
E–26 ......
OMITTED.
EL09–4–000 ................................................
E–27 ......
EL00–95–164 ..............................................
E–15 ......
E–16
E–17
E–18
E–19
E–20
......
......
......
......
......
E–21 ......
E–22 ......
EL00–98–184 ..............................................
E–28
E–29
E–30
E–31
......
......
......
......
OMITTED.
ER08–774–001, ER08–774–001 ................
ER07–694–000 ............................................
ER05–6–093, ER05–6–107 ........................
EL04–135–096, EL04–135–111 ..................
E–33 ......
E–34 ......
EL02–111–113, EL02–111–128 ..................
EL03–212–109, EL03–212–124 ..................
ER07–1372–009, ER07–1372–010 ............
ER06–1552–000, ER06–1552–002, ER06–
1552–003.
ER08–283–002 ............................................
ER08–370–004 ............................................
E–35 ......
E–36 ......
EL08–22–002 ..............................................
ER06–615–027, ER06–615–028 ................
EL07–101–001 ............................................
E–32 ......
pwalker on PROD1PC71 with NOTICES
E–37 ......
E–38 ......
E–39 ......
ER05–6–103 ................................................
EL04–135–106 ............................................
EL02–111–123 ............................................
EL03–212–119 ............................................
ER08–585–000 ............................................
ER08–808–001, ER08–949–002, ER08–
989–002, ER08–992–002, ER08–994–
002, ER08–998–002, ER08–1029–001,
ER08–1031–001,
ER08–1033–001,
ER08–1035–001,
ER08–1037–001,
ER08–1047–001,
ER08–1062–001,
ER08–1149–002.
RM05–35–000 .............................................
VerDate Aug<31>2005
19:56 Dec 16, 2008
Jkt 217001
PO 00000
Delegation Agreement Between the North American Electric
ReliabilityFirst Corporation.
Delegation Agreement Between the North American Electric
SERC Reliability Corporation.
Delegation Agreement Between the North American Electric
Southwest Power Pool, Inc.
Delegation Agreement Between the North American Electric
Western Electricity Coordinating Council.
Delegation Agreement Between the North American Electric
Florida Reliability Coordinating Council.
Southwest Power Pool, Inc.
NSTAR Electric Company.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
Reliability Corporation and
Reliability Corporation and
Reliability Corporation and
Reliability Corporation and
Reliability Corporation and
ISO New England Inc. and New England Power Pool.
California Independent System Operator Corporation.
American Electric Power Service Corporation.
Southern California Edison Company.
California Independent System Operator Corporation.
Southern California Edison Company.
Southern Company Services, Inc., Alabama Power Company, Georgia Power Company, Gulf Power Company, Mississippi Power Company, Southern Power Company.
Independent Power Producers of New York, Inc.; Astoria Generating Company, L.P.;
ConsumerPower1ine, Inc.; East Coast Power, LLC; Energy Curtailment Specialists,
Inc.; NRG Energy, Inc.; TC Ravenswood, LLC v. New York Independent System Operator, Inc.
San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services Into
Markets Operated by the California Independent System Operator Corporation and
the California Power Exchange Corporation.
Investigation of Practices of the California Independent System Operator Corporation
and the California Power Exchange Corporation.
Entergy Services, Inc.
New England Power Company.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc. and PJM Interconnection,
L.L.C.
Midwest Independent Transmission System Operator, Inc.
Ameren Services Company.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
New York Independent System Operator, Inc.
Missouri River Energy Services and Midwest Independent Transmission System Operator, Inc.
Missouri River Energy Services and Western Minnesota Municipal Power Agency.
California Independent System Operator Corporation.
American Electric Power Service Corporation v. Midwest Independent Transmission
System Operator, Inc. and PJM Interconnection, L.L.C.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc. PJM Interconnection, L.L.C.
Midwest Independent Transmission System Operator, Inc. PJM Interconnection, L.L.C.
Ameren Services Company.
California Independent System Operator Corporation.
Westar Energy, Inc.
Standard of Review for Modifications to Jurisdictional Agreement.
Frm 00025
Fmt 4703
Sfmt 4703
E:\FR\FM\17DEN1.SGM
17DEN1
76632
Federal Register / Vol. 73, No. 243 / Wednesday, December 17, 2008 / Notices
942ND—MEETING—Continued
Item No
Docket No.
Company
E–40 ......
EL08–86–000 ..............................................
Renewable Energy Systems Americas Inc. and PEAK Wind Development, LLC v. Otter
Tail Power Company and Minnkota Power Cooperative, Inc.
Gas
G–1
G–2
G–3
G–4
G–5
........
........
........
........
........
RM07–10–002 .............................................
RM07–9–000 ...............................................
RP00–107–011 ............................................
RP08–426–000, RP08–426–001 ................
OMITTED.
Transparency Provisions of Section 23 of the Natural Gas Act.
Review of FERC Form Nos. 6 and 6Q.
Williston Basin Interstate Pipeline Company.
El Paso Natural Gas Company.
Hydro
H–1
H–2
H–3
H–4
........
........
........
........
P–11945–003 ..............................................
P–12804–000 ..............................................
P–12606–000 ..............................................
P–2545–091 ................................................
Symbiotics, LLC.
Public Utility District No. 1 of Okanogan County, Washington.
Avista Corporation.
Avista Corporation.
Certificates
C–1 ........
C–2 ........
CP08–96–000 ..............................................
CP08–418–000 ............................................
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
A free Webcast of this event is
available through https://www.ferc.gov.
Anyone with Internet access who
desires to view this event can do so by
navigating to https://www.ferc.gov’s
Calendar of Events and locating this
event in the Calendar. The event will
contain a link to its Webcast. The
Capitol Connection provides technical
support for the free Webcasts. It also
offers access to this event via television
in the DC area and via phone bridge for
a fee. If you have any questions, visit
https://www.CapitolConnection.org or
contact Danelle Springer or David
Reininger at 703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. E8–29887 Filed 12–16–08; 8:45 am]
pwalker on PROD1PC71 with NOTICES
BILLING CODE 6717–01–P
VerDate Aug<31>2005
18:58 Dec 16, 2008
Arlington Storage Company, LLC.
Southeast Gas Storage, LLC.
Jkt 217001
Federal Energy Regulatory
Commission
[Docket No. PL09–3–000]
Control and Affiliation for Purposes of
the Commission’s Market-Based Rate
Requirements Under Section 205 of the
Federal Power Act and the
Requirements of Section 203 of the
Federal Power Act; Notice Inviting
Post-Workshop Comments
The Commission invites written
comments from workshop participants
on any of the matters discussed at the
workshop, including recommendations
on actions the Commission can take to
resolve any of the issues discussed.
Comments should be submitted in this
docket by January 16, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–29851 Filed 12–16–08; 8:45 am]
BILLING CODE 6717–01–P
December 9, 2008.
On December 3, 2008, Commission
staff convened a workshop with
interested persons to discuss issues
raised by the filing of the Electric Power
Supply Association docketed in Docket
No. PL09–3–000. The agenda for the
workshop was published in a notice
issued in this docket on November 21,
2008.
Topics discussed at the workshop
included, but were not limited to, the
meaning of the term ‘‘control’’ for
purposes of sections 203 and 205 of the
Federal Power Act (FPA); what actions
by upstream investors should be
deemed to constitute the exercise of
control for purposes of sections 203 and
205 of the FPA; whether the
Commission should rely on
representations made by an investor on
the Securities and Exchange
Commission’s Schedule 13G for
purposes of determining whether the
investor can exercise control over a
public utility; and what actions by an
upstream investor should be deemed to
affect a seller’s market-based rate
authority.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–465–000]
ANR Pipeline Company; Notice of
Canceled Site Visit
December 9, 2008.
On December 10, 2008, staff of the
Federal Energy Regulatory Commission
was scheduled to conduct a site visit of
ANR Pipeline Company’s proposed
Wisconsin 2009 Expansion Project in
Janesville, Wisconsin. This notice
announces the cancellation of that site
visit due to adverse weather conditions.
Please note that this Notice cancels
the site visit that was previously
announced in the Revised Notice of Site
Visit issued on December 4, 2008.
E:\FR\FM\17DEN1.SGM
17DEN1
Agencies
[Federal Register Volume 73, Number 243 (Wednesday, December 17, 2008)]
[Notices]
[Pages 76630-76632]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-29887]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
December 11, 2008.
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5
U.S.C. 552b:
Agency Holding Meeting: Federal Energy Regulatory Commission.
Date and Time: December 18, 2008, 10 a.m.
Place: Room 2C, 888 First Street, NE., Washington, DC 20426.
Status: Open.
Matters to be Considered: Agenda.
Note: Items listed on the agenda may be deleted without further
notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400. For a recorded message listing items struck
from or added to the meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
942ND--Meeting
----------------------------------------------------------------------------------------------------------------
Item No Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1..................... AD02-1-000...................... Agency Administrative Matters.
A-2..................... AD02-7-000...................... Customer Matters, Reliability, Security and Market
Operations.
A-3..................... AD06-3-000...................... Energy Market Update.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1..................... EL02-28-006, EL02-33-007, EL02- Nevada Power Company and Sierra Pacific Power
38-006. Company v. Enron Power Marketing, Inc.; El Paso
Merchant Energy; American Electric Power Services
Corporation.
EL02-29-006, EL02-30-006, EL02- Nevada Power Company v. Morgan Stanley Capital
31-006. Group; Calpine Energy Services; Mirant Americas
Energy Marketing, L.P.
EL02-32-006, EL02-34-006, EL02- Reliant Energy Services; BP Energy Company;
39-006. Allegheny Energy Supply Company, L.L.C.
EL02-43-006..................... Southern California Water Company v. Mirant Americas
Energy Marketing L.P.
EL02-56-006..................... Public Utility District No. 1 Snohomish County,
Washington v. Morgan Stanley Capital Group, Inc.
E-2..................... EL08-34-002..................... Maryland Public Service Commission v. PJM
Interconnection, L.L.C.
EL08-47-002..................... PJM Interconnection, L.L.C.
E-3..................... ER07-1372-002, ER07-1372-005, Midwest Independent Transmission System Operator,
ER07-1372-011, ER07-1372-013. Inc.
ER08-1254-000................... Midwest Independent Transmission System Operator,
Inc. and Transmission Owners of the Midwest
Independent Transmission System Operator, Inc.
ER08-1257-000, ER08-1257-001.... Midwest Independent Transmission System Operator,
Inc.
ER09-24-000..................... Midwest Independent Transmission System Operator,
Inc.
E-4..................... ER07-1372-007................... Midwest Independent Transmission System Operator,
Inc.
E-5..................... ER09-14-000, ER09-14-001........ NSTAR Electric Company.
E-6..................... ER09-88-000..................... Southern Company Services, Inc.
E-7..................... RM04-7-005...................... Market-Based Rates For Wholesale Sales of Electric
Energy, Capacity and Ancillary Services By Public
Utilities.
E-8..................... RC08-1-001...................... Southeastern Power Administration.
E-9..................... RC09-3-000...................... North American Electric Reliability Corporation and
Northeast Power Coordinating Council, Inc.
E-10.................... RR06-1-016, RR06-1-017.......... North American Electric Reliability Council, North
American Electric Reliability Corporation.
RR07-1-004...................... Delegation Agreement Between the North American
Electric Reliability Corporation and Texas Regional
Entity, a division of ERCOT.
RR07-2-004...................... Delegation Agreement Between the North American
Electric Reliability Corporation and Midwest
Reliability Organization.
RR07-3-004, RR07-3-005.......... Delegation Agreement Between the North American
Electric Reliability Corporation and Northeast
Power Coordinating Council, Inc.
[[Page 76631]]
RR07-4-004...................... Delegation Agreement Between the North American
Electric Reliability Corporation and
ReliabilityFirst Corporation.
RR07-5-005...................... Delegation Agreement Between the North American
Electric Reliability Corporation and SERC
Reliability Corporation.
RR07-6-004...................... Delegation Agreement Between the North American
Electric Reliability Corporation and Southwest
Power Pool, Inc.
RR07-7-004, RR07-7-005.......... Delegation Agreement Between the North American
Electric Reliability Corporation and Western
Electricity Coordinating Council.
RR07-8-004, RR07-8-005.......... Delegation Agreement Between the North American
Electric Reliability Corporation and Florida
Reliability Coordinating Council.
E-11.................... ER09-149-000.................... Southwest Power Pool, Inc.
E-12.................... ER08-1051-000, ER08-1051-001.... NSTAR Electric Company.
E-13.................... ER08-1256-000, ER08-1256-001.... Midwest Independent Transmission System Operator,
Inc.
E-14.................... ER09-15-000..................... Midwest Independent Transmission System Operator,
Inc.
ER09-97-000..................... Midwest Independent Transmission System Operator,
Inc.
E-15.................... ER08-1055-000, ER08-1055-001.... Midwest Independent Transmission System Operator,
Inc.
ER08-1042-000, ER08-1042-001, Midwest Independent Transmission System Operator,
ER08-1042-002. Inc.
E-16.................... OMITTED.........................
E-17.................... ER09-209-000.................... ISO New England Inc. and New England Power Pool.
E-18.................... ER09-239-000.................... California Independent System Operator Corporation.
E-19.................... ER09-12-000..................... American Electric Power Service Corporation.
E-20.................... ER09-187-000, ER08-1343-000, Southern California Edison Company.
ER08-1353-000.
E-21.................... OMITTED.........................
E-22.................... ER07-869-004, ER07-475-005, ER06- California Independent System Operator Corporation.
615-030.
E-23.................... ER08-375-002.................... Southern California Edison Company.
E-24.................... ER96-78-020..................... Southern Company Services, Inc., Alabama Power
Company, Georgia Power Company, Gulf Power Company,
Mississippi Power Company, Southern Power Company.
E-25.................... OMITTED.........................
E-26.................... EL09-4-000...................... Independent Power Producers of New York, Inc.;
Astoria Generating Company, L.P.;
ConsumerPower1ine, Inc.; East Coast Power, LLC;
Energy Curtailment Specialists, Inc.; NRG Energy,
Inc.; TC Ravenswood, LLC v. New York Independent
System Operator, Inc.
E-27.................... EL00-95-164..................... San Diego Gas & Electric Company v. Sellers of
Energy and Ancillary Services Into Markets Operated
by the California Independent System Operator
Corporation and the California Power Exchange
Corporation.
EL00-98-184..................... Investigation of Practices of the California
Independent System Operator Corporation and the
California Power Exchange Corporation.
E-28.................... OMITTED.........................
E-29.................... ER08-774-001, ER08-774-001...... Entergy Services, Inc.
E-30.................... ER07-694-000.................... New England Power Company.
E-31.................... ER05-6-093, ER05-6-107.......... Midwest Independent Transmission System Operator,
Inc.
EL04-135-096, EL04-135-111...... Midwest Independent Transmission System Operator,
Inc. and PJM Interconnection, L.L.C.
EL02-111-113, EL02-111-128...... Midwest Independent Transmission System Operator,
Inc.
EL03-212-109, EL03-212-124...... Ameren Services Company.
E-32.................... ER07-1372-009, ER07-1372-010.... Midwest Independent Transmission System Operator,
Inc.
ER06-1552-000, ER06-1552-002, Midwest Independent Transmission System Operator,
ER06-1552-003. Inc.
E-33.................... ER08-283-002.................... New York Independent System Operator, Inc.
E-34.................... ER08-370-004.................... Missouri River Energy Services and Midwest
Independent Transmission System Operator, Inc.
EL08-22-002..................... Missouri River Energy Services and Western Minnesota
Municipal Power Agency.
E-35.................... ER06-615-027, ER06-615-028...... California Independent System Operator Corporation.
E-36.................... EL07-101-001.................... American Electric Power Service Corporation v.
Midwest Independent Transmission System Operator,
Inc. and PJM Interconnection, L.L.C.
ER05-6-103...................... Midwest Independent Transmission System Operator,
Inc.
EL04-135-106.................... Midwest Independent Transmission System Operator,
Inc. PJM Interconnection, L.L.C.
EL02-111-123.................... Midwest Independent Transmission System Operator,
Inc. PJM Interconnection, L.L.C.
EL03-212-119.................... Ameren Services Company.
E-37.................... ER08-585-000.................... California Independent System Operator Corporation.
E-38.................... ER08-808-001, ER08-949-002, ER08- Westar Energy, Inc.
989-002, ER08-992-002, ER08-994-
002, ER08-998-002, ER08-1029-
001, ER08-1031-001, ER08-1033-
001, ER08-1035-001, ER08-1037-
001, ER08-1047-001, ER08-1062-
001, ER08-1149-002.
E-39.................... RM05-35-000..................... Standard of Review for Modifications to
Jurisdictional Agreement.
[[Page 76632]]
E-40.................... EL08-86-000..................... Renewable Energy Systems Americas Inc. and PEAK Wind
Development, LLC v. Otter Tail Power Company and
Minnkota Power Cooperative, Inc.
----------------------------------------------------------------------------------------------------------------
Gas
----------------------------------------------------------------------------------------------------------------
G-1..................... RM07-10-002..................... Transparency Provisions of Section 23 of the Natural
Gas Act.
G-2..................... RM07-9-000...................... Review of FERC Form Nos. 6 and 6Q.
G-3..................... RP00-107-011.................... Williston Basin Interstate Pipeline Company.
G-4..................... RP08-426-000, RP08-426-001...... El Paso Natural Gas Company.
G-5..................... OMITTED.........................
----------------------------------------------------------------------------------------------------------------
Hydro
----------------------------------------------------------------------------------------------------------------
H-1..................... P-11945-003..................... Symbiotics, LLC.
H-2..................... P-12804-000..................... Public Utility District No. 1 of Okanogan County,
Washington.
H-3..................... P-12606-000..................... Avista Corporation.
H-4..................... P-2545-091...................... Avista Corporation.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1..................... CP08-96-000..................... Arlington Storage Company, LLC.
C-2..................... CP08-418-000.................... Southeast Gas Storage, LLC.
----------------------------------------------------------------------------------------------------------------
Kimberly D. Bose,
Secretary.
A free Webcast of this event is available through https://
www.ferc.gov. Anyone with Internet access who desires to view this
event can do so by navigating to https://www.ferc.gov's Calendar of
Events and locating this event in the Calendar. The event will contain
a link to its Webcast. The Capitol Connection provides technical
support for the free Webcasts. It also offers access to this event via
television in the DC area and via phone bridge for a fee. If you have
any questions, visit https://www.CapitolConnection.org or contact
Danelle Springer or David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. E8-29887 Filed 12-16-08; 8:45 am]