Environmental Impact Statements and Regulations; Availability of EPA Comments, 75714-75715 [E8-29489]
Download as PDF
75714
Federal Register / Vol. 73, No. 240 / Friday, December 12, 2008 / Notices
In Table II of this unit, EPA provides
the following information (to the extent
that such information is not claimed as
CBI) on the Notices of Commencement
to manufacture received:
II. 10 NOTICES OF COMMENCEMENT FROM: 11/03/08 TO 11/14/08
Case No.
Commencement
Notice End Date
Received Date
P–06–0469
P–07–0348
P–08–0127
P–08–0191
P–08–0192
P–08–0382
11/10/08
10/31/08
11/10/08
10/31/08
10/31/08
11/05/08
10/22/08
10/29/08
11/05/08
10/22/08
10/23/08
10/27/08
P–08–0499
11/05/08
10/29/08
P–08–0528
P–08–0529
P–08–0553
11/05/08
11/06/08
11/06/08
10/16/08
10/21/08
10/20/08
List of Subjects
Environmental protection, Chemicals,
Premanufacturer notices.
Dated: December 3, 2008.
Chandler Sirmons,
Acting Director, Information Management
Division, Office of Pollution Prevention and
Toxics.
[FR Doc. E8–29466 Filed 12–11–08; 8:45 am]
BILLING CODE 6560–50–S
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8588–5]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 6, 2008 (73 FR 19833).
jlentini on PROD1PC65 with NOTICES
Draft EISs
EIS No. 20080282, ERP No. D–UPS–
K80007–CA, Aliso Viejo Incoming
Mail Facility, Proposed Construction
and Operation of a Mail Processing
Facility on a 25-Acre Parcel, Aliso
Viejo, Orange County, CA.
VerDate Aug<31>2005
17:56 Dec 11, 2008
Jkt 217001
Chemical
(G) Chlorinated polyester resin
(G) Copolymer based on sulfonic acid monomer
(S) 2-hexenoic acid, 2-methyl-, methyl ester, (2)(G) Modified polyamine
(G) Modified polyamine
(G) Propenenitrile, reaction products with alkylenediamine, hydrogenated, N-aryl
derivates
(S) Arylesterase - The CAS registy number (9032–73–9) was determined by
using the enzyme classification number for this enzyme. arylesterase (EC#
3.1.1.2) is referenced in the Brenda Comprehensive Enzyme Information System and in the expasy enzyme database. Synonyms are paraoxonase and
alpha-esterase. The systematic name is aryl-ester hydrolase. Arylesterases
act on many phenolic esters. It is likely that the three forms of human
paraoxonase are lactonases rather than aromatic esterases [7,8]. The natural
substrates of the paraoxonases are lactones, with ()-5-hydroxy-6E,8Z,11Z,4Zeicostetraenoic-acid 1,5-lactone being the best substrate
(S) Butanoic acid, 2-methyl-, 5-hexen-1-yl ester
(G) 1,2,3 - propanetriol, homopolymer, ether with aliphatic alcohol
(G) Polycarbonate polyurethane acrylate oligomer
Summary: EPA expressed
environmental concerns about air
quality, water quality and stormwater
impacts, and requested that the final EIS
and ROD commit to all stated mitigation
measures. Rating EC1.
EIS No. 20080292, ERP No. D–IBR–
K65343–CA, Millerton Lake Resource
Management Plan (RMP) and General
Plan, Implementation, Fresno and
Madera Counties, CA.
Summary: EPA expressed
environmental concerns about
environmental resource and noise
impacts. EPA also requested additional
information on climate change, funding,
and enforcement. Rating EC2.
EIS No. 20080293, ERP No. D–IBR–
K65344–CA, Cachuma Lake Resource
Management Plan, Implementation,
Cachuma Lake, Santa Barbara County,
CA.
Summary: EPA expressed
environmental concerns about air
quality, water quality and cumulative
impacts. Rating EC2.
EIS No. 20080314, ERP No. D–NOA–
L39067–OR, Elliott State Forest
Habitat Conservation Plan, Proposed
Issuance of an Incidental Take Permit,
US Army Corps section 10 and 404
Permits, Coos and Douglas Counties,
OR.
Summary: EPA expressed
environmental concerns about impacts
to headwater streams and aquatic
resources. Rating EC2.
EIS No. 20080372, ERP No. D–AFS–
L65558–ID, Salmon-Challis National
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
Forest (SCNF), Proposes Travel
Planning and OHV Route Designation,
Lemhi, Custer and Butte Counties, ID.
Summary: EPA expressed
environmental concerns about potential
impacts to water quality, fish habitat,
noxious weed infestations and air
quality. EPA recommends increased
restrictions in vulnerable watersheds,
especially for motorized dispersed
camping and for crossing streams and
wet meadows. Rating EC2.
EIS No. 20080381, ERP No. D–IBR–
K39115–CA, South Coast Conduit/
Upper Reach Reliability Project,
Construction of a Second Water
Pipeline for Improving Water Supply,
U.S. Army COE section 10 and 404
Permits, Santa Barbara County, CA.
Summary: EPA continues to have
environmental concerns about impacts
to aquatic resources and oak woodland
habitat. Rating EC2.
EIS No. 20080388, ERP No. D–AFS–
L65559–OR, BLT Project, Proposed
Vegetation Management Activities,
Crescent Ranger District, Deschutes
National Forest, Deschutes County,
OR.
Summary: EPA expressed
environmental concerns about air
quality and visibility, water quality, and
health impacts. Rating EC2.
EIS No. 20080391, ERP No. D–FHW–
F40444–MN, Trunk Highway 14 (US
14) Project, Proposed Construction
from Interstate 35 to Trunk Highway
56, Funding, NPDES and U.S. Army
COE section 404 Permits, Steele and
Doge Counties, MN.
E:\FR\FM\12DEN1.SGM
12DEN1
Federal Register / Vol. 73, No. 240 / Friday, December 12, 2008 / Notices
jlentini on PROD1PC65 with NOTICES
Summary: EPA expressed
environmental concerns about wetland
and noise impacts. EPA also
recommended green construction and
development practices. Rating EC2.
EIS No. 20080330, ERP No. DS–COE–
E11060–NC, Topsail Beach Interim
(Emergency) Beach Fill Project—
Permit Request, Proposal to Place
Sand on 4.7 miles of the Town’s
Shoreline to Protect the Dune
Complex and Oceanfront
Development, Onslow and Pender
Counties, NC.
Summary: EPA expressed
environmental concerns about borrow
site impacts to Lea/Hutaff Island. EPA
requested clarification on beach erosion,
and the assumptions of beachfront real
estate values used in the economic
impact analysis. Rating EC2.
EIS No. 20080364, ERP No. DS–NPS–
E61077–GA, Chattahoochee River
National Recreation Area General
Management Plan, Updated
Information on Analyzing Six
Alternative Future Directions for the
Management and Use of
Chattachoochee River National
Recreation Area, Implementation,
Chattahoochee River, Atlanta, GA.
Summary: EPA does not object to the
proposed project. Rating LO.
source aquifers and protected
geothermal resources.
EIS No. 20080430, ERP No. F–COE–
K39114–CA, Three Rivers Levee
Improvement Authority, proposes
construct and maintain the Feather
River Levee Repair Project, Segment
2, Issuing 408 Permission and 404
Permit, Yuba County, CA.
Summary: EPA continues to have
environmental concerns and
recommends sustainable agricultural
practices to reduce impacts to water
quality and requested review of the Best
Management Practices Plan required by
the State of California.
EIS No. 20080444, ERP No. F–NPS–
K65334–HI, PROGRAMMATIC EIS—
Ala Kahakai National Historic Trail
Comprehensive Management Plan, To
Provide Long-Term Direction for
Natural and Cultural Resource, Island
of Hawaii, HI.
Summary: EPA does not object to the
proposed project.
EIS No. 20080410, ERP No. FA–FTA–
K40208–CA, South Sacramento
Corridor Phase 2, Improve Transit
Service and Enhance Regional
Connectivity, Funding, in the City
and County Sacramento, CA.
Summary: EPA does not object to the
proposed project.
Final EISs
EIS No. 20080355, ERP No. F–AFS–
L65489–OR, Ashland Forest Resiliency
Project, To Recover from Large-Scale
High-Severity Wild Land Fire, Upper
Bear Analysis Area, Ashland Ranger
District, Rogue River-Siskiyou National
Forest, Jackson County, OR.
Summary: The Final EIS addressed
EPA’s concerns about potential impacts
from sediment to drinking water;
therefore, EPA does not object to the
proposed action.
EIS No. 20080424, ERP No. F–NOA–
E91025–00, Reef Fish Amendment
30B: Gag-End Overfishing and Set
Management Thresholds and Targets;
Red Grouper—Set Optimum Yield,
Total Allowable Catch (TAC), and
Management Measures: Area
Closures: and Federal Regulatory
Compliance, Implementation, Gulf of
Mexico.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20080429, ERP No. F–BLM–
A09825–00, PROGRAMMATIC—
Geothermal Leasing in the Western
United States.
Summary: EPA continues to have
environmental concerns about
groundwater quantity and quality
impacts, especially where there are sole
Dated: December 9, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–29489 Filed 12–11–08; 8:45 am]
VerDate Aug<31>2005
17:56 Dec 11, 2008
Jkt 217001
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8588–4]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements.
Filed 12/01/2008 through 12/05/2008.
Pursuant to 40 CFR 1506.9.
EIS No. 20080499, Final EIS, NPS, MD,
White-Tailed Deer Management Plan,
Preferred Alternative is Alternative C,
Implementation, Catocin Mountain
Park, Frederick and Washington
Counties, MD, Wait Period Ends: 01/
12/2009, Contact: Sean Denniston,
301–416–0536.
EIS No. 20080500, Final EIS, DHS, 00,
National Bio and Agro-Defense
Facility, Preferred Alternative is (2)
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
75715
Manhattan Campus Site, Propose to
Site, Construct and Operate at one of
the Proposed Locations: (1) South
Milledge Avenue Site, Clarke County,
GA; (2) Manhattan Campus Site, Riley
County, KS; (3) Flora Industrial Park
Site, Madison County, MS; (4) Plum
Island Site, Suffolk County, NY; (5)
Umstead Research Park Site, Granville
County, NC; and (6) Texas Research
Park Site, Bexar and Medina Counties,
TX, Wait Period Ends: 01/12/2009,
Contact: James V. Johnson, 202–254–
6098.
EIS No. 20080501, Final EIS, AFS, 00,
Wild and Scenic River Suitability
Study for National Forest System
Lands on the Ashley, Dixie, Fishlake,
Manti-La Sal, Uinta and WasatchCache National Forests in UT and
Portion of National Forests extend
into Colorado and Wyoming, several
counties, UT, Montrose County, CO
and Uinta County, WY, Wait Period
Ends: 01/12/2009, Contact: Catherine
Kahlow, 801–236–3412.
EIS No. 20080502, Draft EIS, FTA, WA,
East Link Rail Transit Project,
Proposes to Construct and Operate an
Extension of the Light Rail System
from downtown Seattle to Mercer
Island, Bellevue, and Redmond via
Interstate 90, Funding and U.S. Army
COE Section 404 and 10 Permits,
Seattle, WA, Comment Period Ends:
02/25/2009, Contact: Johnn Witmer,
206–220–7964.
EIS No. 20080503, Draft EIS, NRC, PA,
GENERIC—License Renewal of
Nuclear Plants, Supplement 37 to
NUREG–1437, Regarding Three Mile
Island Nuclear Station, Unit 1, in
Londonterry Township in Dauphin
County, PA, Comment Period Ends:
03/04/2009, Contact: Sarah L. Lopas
301–415–1147.
EIS No. 20080504, Final EIS, FRC, MD,
Sparrows Point Liquefied Natural Gas
(LNG) Import Terminal Expansion
and Natural Gas Pipeline Facilities,
Construction and Operation,
Application Authorization, U.S. COE
Section 10 and 404 Permits, Baltimore
County, MD, Wait Period Ends: 01/12/
2009, Contact: Patricia Schaub, 1–
866–208–3372.
EIS No. 20080505, Final EIS, FHW, IN,
US 31 Improvement Project (I–465 to
IN 38), between I–465 North Leg and
IN–38, NPDES Permit and U.S. Army
Section 10 and 404 Permits, Hamilton
County, IN, Wait Period Ends: 01/12/
2009, Contact: Larry Heil, 317–226–
7480.
EIS No. 20080506, Draft EIS, USA, GA,
Maneuver Center of Excellence at Fort
Benning, Georgia Project, Proposed
Community Services, Personnel
Support, Classroom Barracks, and
E:\FR\FM\12DEN1.SGM
12DEN1
Agencies
[Federal Register Volume 73, Number 240 (Friday, December 12, 2008)]
[Notices]
[Pages 75714-75715]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-29489]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8588-5]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7146. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 6, 2008 (73 FR 19833).
Draft EISs
EIS No. 20080282, ERP No. D-UPS-K80007-CA, Aliso Viejo Incoming Mail
Facility, Proposed Construction and Operation of a Mail Processing
Facility on a 25-Acre Parcel, Aliso Viejo, Orange County, CA.
Summary: EPA expressed environmental concerns about air quality,
water quality and stormwater impacts, and requested that the final EIS
and ROD commit to all stated mitigation measures. Rating EC1.
EIS No. 20080292, ERP No. D-IBR-K65343-CA, Millerton Lake Resource
Management Plan (RMP) and General Plan, Implementation, Fresno and
Madera Counties, CA.
Summary: EPA expressed environmental concerns about environmental
resource and noise impacts. EPA also requested additional information
on climate change, funding, and enforcement. Rating EC2.
EIS No. 20080293, ERP No. D-IBR-K65344-CA, Cachuma Lake Resource
Management Plan, Implementation, Cachuma Lake, Santa Barbara County,
CA.
Summary: EPA expressed environmental concerns about air quality,
water quality and cumulative impacts. Rating EC2.
EIS No. 20080314, ERP No. D-NOA-L39067-OR, Elliott State Forest Habitat
Conservation Plan, Proposed Issuance of an Incidental Take Permit, US
Army Corps section 10 and 404 Permits, Coos and Douglas Counties, OR.
Summary: EPA expressed environmental concerns about impacts to
headwater streams and aquatic resources. Rating EC2.
EIS No. 20080372, ERP No. D-AFS-L65558-ID, Salmon-Challis National
Forest (SCNF), Proposes Travel Planning and OHV Route Designation,
Lemhi, Custer and Butte Counties, ID.
Summary: EPA expressed environmental concerns about potential
impacts to water quality, fish habitat, noxious weed infestations and
air quality. EPA recommends increased restrictions in vulnerable
watersheds, especially for motorized dispersed camping and for crossing
streams and wet meadows. Rating EC2.
EIS No. 20080381, ERP No. D-IBR-K39115-CA, South Coast Conduit/Upper
Reach Reliability Project, Construction of a Second Water Pipeline for
Improving Water Supply, U.S. Army COE section 10 and 404 Permits, Santa
Barbara County, CA.
Summary: EPA continues to have environmental concerns about impacts
to aquatic resources and oak woodland habitat. Rating EC2.
EIS No. 20080388, ERP No. D-AFS-L65559-OR, BLT Project, Proposed
Vegetation Management Activities, Crescent Ranger District, Deschutes
National Forest, Deschutes County, OR.
Summary: EPA expressed environmental concerns about air quality and
visibility, water quality, and health impacts. Rating EC2.
EIS No. 20080391, ERP No. D-FHW-F40444-MN, Trunk Highway 14 (US 14)
Project, Proposed Construction from Interstate 35 to Trunk Highway 56,
Funding, NPDES and U.S. Army COE section 404 Permits, Steele and Doge
Counties, MN.
[[Page 75715]]
Summary: EPA expressed environmental concerns about wetland and
noise impacts. EPA also recommended green construction and development
practices. Rating EC2.
EIS No. 20080330, ERP No. DS-COE-E11060-NC, Topsail Beach Interim
(Emergency) Beach Fill Project--Permit Request, Proposal to Place Sand
on 4.7 miles of the Town's Shoreline to Protect the Dune Complex and
Oceanfront Development, Onslow and Pender Counties, NC.
Summary: EPA expressed environmental concerns about borrow site
impacts to Lea/Hutaff Island. EPA requested clarification on beach
erosion, and the assumptions of beachfront real estate values used in
the economic impact analysis. Rating EC2.
EIS No. 20080364, ERP No. DS-NPS-E61077-GA, Chattahoochee River
National Recreation Area General Management Plan, Updated Information
on Analyzing Six Alternative Future Directions for the Management and
Use of Chattachoochee River National Recreation Area, Implementation,
Chattahoochee River, Atlanta, GA.
Summary: EPA does not object to the proposed project. Rating LO.
Final EISs
EIS No. 20080355, ERP No. F-AFS-L65489-OR, Ashland Forest
Resiliency Project, To Recover from Large-Scale High-Severity Wild Land
Fire, Upper Bear Analysis Area, Ashland Ranger District, Rogue River-
Siskiyou National Forest, Jackson County, OR.
Summary: The Final EIS addressed EPA's concerns about potential
impacts from sediment to drinking water; therefore, EPA does not object
to the proposed action.
EIS No. 20080424, ERP No. F-NOA-E91025-00, Reef Fish Amendment 30B:
Gag-End Overfishing and Set Management Thresholds and Targets; Red
Grouper--Set Optimum Yield, Total Allowable Catch (TAC), and Management
Measures: Area Closures: and Federal Regulatory Compliance,
Implementation, Gulf of Mexico.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20080429, ERP No. F-BLM-A09825-00, PROGRAMMATIC--Geothermal
Leasing in the Western United States.
Summary: EPA continues to have environmental concerns about
groundwater quantity and quality impacts, especially where there are
sole source aquifers and protected geothermal resources.
EIS No. 20080430, ERP No. F-COE-K39114-CA, Three Rivers Levee
Improvement Authority, proposes construct and maintain the Feather
River Levee Repair Project, Segment 2, Issuing 408 Permission and 404
Permit, Yuba County, CA.
Summary: EPA continues to have environmental concerns and
recommends sustainable agricultural practices to reduce impacts to
water quality and requested review of the Best Management Practices
Plan required by the State of California.
EIS No. 20080444, ERP No. F-NPS-K65334-HI, PROGRAMMATIC EIS--Ala
Kahakai National Historic Trail Comprehensive Management Plan, To
Provide Long-Term Direction for Natural and Cultural Resource, Island
of Hawaii, HI.
Summary: EPA does not object to the proposed project.
EIS No. 20080410, ERP No. FA-FTA-K40208-CA, South Sacramento Corridor
Phase 2, Improve Transit Service and Enhance Regional Connectivity,
Funding, in the City and County Sacramento, CA.
Summary: EPA does not object to the proposed project.
Dated: December 9, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-29489 Filed 12-11-08; 8:45 am]
BILLING CODE 6560-50-P