Riverbank Ogdensburg, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 75701 [E8-29472]
Download as PDF
Federal Register / Vol. 73, No. 240 / Friday, December 12, 2008 / Notices
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. All filings must (1) Bear in all
capital letters the title ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or ‘‘FISHWAY
PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed
according to the following Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Commission issues
EA.
Comments on EA ......
Target date
May 2009
June 2009
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–29470 Filed 12–11–08; 8:45 am]
jlentini on PROD1PC65 with NOTICES
BILLING CODE 6717–01–P
VerDate Aug<31>2005
19:56 Dec 11, 2008
Jkt 217001
assistance, call toll-free 1–866–208–
3372.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E8–29472 Filed 12–11–08; 8:45 am]
[Project No. 13288–000]
Riverbank Ogdensburg, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
December 8, 2008.
On September 23, 2008, Riverbank
Ogdensburg, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Ogdensburg Pumped
Storage Project to be located on the St.
Lawrence River in St. Lawrence County,
New York.
The proposed project would consist
of: (1) The St. Lawrence River as an
upper reservoir; (2) an underground
lower reservoir with an elevation of
1,800 feet below MSL and a storage
capacity of 3,775 acre-feet; (3) four 13
foot diameter, 2,000 foot long, concrete
and steel penstocks; (4) an underground
powerhouse containing four pump/
turbine units with a total installed
capacity of 1,000 MW; (5) a 345 kV, 18.6
mile long transmission line; and (6)
appurtenant facilities. The annual
production would be 2,190 GWh which
would be sold to a local utility.
Applicant Contact: William S.
Helmer, Esq., 194 Washington Ave.,
Suite 315, Albany, New York 12210
(518) 689–3570.
FERC Contact: Kelly Houff (202) 502–
6393.
Deadline for filing comments, motions
to intervene: 60 days from the issuance
of this notice. Comments, motions to
intervene, notices of intent and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. If unable
to be filed electronically, documents
may be paper-filed. To paper-file, an
original and eight copies should be
mailed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13288) in the docket number
field to access the document. For
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
75701
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13302–000]
Scott’s Mill Hydropower, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
December 8, 2008.
On October 14, 2008, Scott’s Mill
Hydropower, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Scott’s Mill
Hydropower Project to be located in
Amherst and Bedford Counties,
Virginia.
The proposed project consists of: (1)
An existing 15-foot-high, 925-foot-long
masonry dam, (2) an existing reservoir
having a surface area of 316 acres, a
storage capacity of 3,790 acre-feet, and
normal maximum water surface
elevation of 511 feet msl, (3) a proposed
powerhouse with 4 generating units
having a total capacity of 3.6 MW; (4) a
proposed 250-foot-long transmission
line; and (5) appurtenant facilities. The
project would have an annual
generation of 14.9 GWh, and would be
sold to a local utility.
Applicant Contact: Mr. Kevin
Edwards, P.O. Box 143, Mayodan, NC
27027, Phone: 336–589–6138. FERC
Contact: Henry Woo, 202–502–8872.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
E:\FR\FM\12DEN1.SGM
12DEN1
Agencies
[Federal Register Volume 73, Number 240 (Friday, December 12, 2008)]
[Notices]
[Page 75701]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-29472]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13288-000]
Riverbank Ogdensburg, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
December 8, 2008.
On September 23, 2008, Riverbank Ogdensburg, LLC filed an
application, pursuant to section 4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the Ogdensburg Pumped Storage
Project to be located on the St. Lawrence River in St. Lawrence County,
New York.
The proposed project would consist of: (1) The St. Lawrence River
as an upper reservoir; (2) an underground lower reservoir with an
elevation of 1,800 feet below MSL and a storage capacity of 3,775 acre-
feet; (3) four 13 foot diameter, 2,000 foot long, concrete and steel
penstocks; (4) an underground powerhouse containing four pump/turbine
units with a total installed capacity of 1,000 MW; (5) a 345 kV, 18.6
mile long transmission line; and (6) appurtenant facilities. The annual
production would be 2,190 GWh which would be sold to a local utility.
Applicant Contact: William S. Helmer, Esq., 194 Washington Ave.,
Suite 315, Albany, New York 12210 (518) 689-3570.
FERC Contact: Kelly Houff (202) 502-6393.
Deadline for filing comments, motions to intervene: 60 days from
the issuance of this notice. Comments, motions to intervene, notices of
intent and competing applications may be filed electronically via the
Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and eight copies should be mailed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. For more information on how to submit these types
of filings please go to the Commission's Web site located at https://
www.ferc.gov/filing-comments.asp. More information about this project
can be viewed or printed on the ``eLibrary'' link of the Commission's
Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
docket number (P-13288) in the docket number field to access the
document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-29472 Filed 12-11-08; 8:45 am]
BILLING CODE 6717-01-P