Riverbank Ogdensburg, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 75701 [E8-29472]

Download as PDF Federal Register / Vol. 73, No. 240 / Friday, December 12, 2008 / Notices for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. All filings must (1) Bear in all capital letters the title ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘FISHWAY PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Commission issues EA. Comments on EA ...... Target date May 2009 June 2009 p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of this notice. Kimberly D. Bose, Secretary. [FR Doc. E8–29470 Filed 12–11–08; 8:45 am] jlentini on PROD1PC65 with NOTICES BILLING CODE 6717–01–P VerDate Aug<31>2005 19:56 Dec 11, 2008 Jkt 217001 assistance, call toll-free 1–866–208– 3372. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. E8–29472 Filed 12–11–08; 8:45 am] [Project No. 13288–000] Riverbank Ogdensburg, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications December 8, 2008. On September 23, 2008, Riverbank Ogdensburg, LLC filed an application, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Ogdensburg Pumped Storage Project to be located on the St. Lawrence River in St. Lawrence County, New York. The proposed project would consist of: (1) The St. Lawrence River as an upper reservoir; (2) an underground lower reservoir with an elevation of 1,800 feet below MSL and a storage capacity of 3,775 acre-feet; (3) four 13 foot diameter, 2,000 foot long, concrete and steel penstocks; (4) an underground powerhouse containing four pump/ turbine units with a total installed capacity of 1,000 MW; (5) a 345 kV, 18.6 mile long transmission line; and (6) appurtenant facilities. The annual production would be 2,190 GWh which would be sold to a local utility. Applicant Contact: William S. Helmer, Esq., 194 Washington Ave., Suite 315, Albany, New York 12210 (518) 689–3570. FERC Contact: Kelly Houff (202) 502– 6393. Deadline for filing comments, motions to intervene: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13288) in the docket number field to access the document. For PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 75701 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13302–000] Scott’s Mill Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications December 8, 2008. On October 14, 2008, Scott’s Mill Hydropower, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Scott’s Mill Hydropower Project to be located in Amherst and Bedford Counties, Virginia. The proposed project consists of: (1) An existing 15-foot-high, 925-foot-long masonry dam, (2) an existing reservoir having a surface area of 316 acres, a storage capacity of 3,790 acre-feet, and normal maximum water surface elevation of 511 feet msl, (3) a proposed powerhouse with 4 generating units having a total capacity of 3.6 MW; (4) a proposed 250-foot-long transmission line; and (5) appurtenant facilities. The project would have an annual generation of 14.9 GWh, and would be sold to a local utility. Applicant Contact: Mr. Kevin Edwards, P.O. Box 143, Mayodan, NC 27027, Phone: 336–589–6138. FERC Contact: Henry Woo, 202–502–8872. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https:// E:\FR\FM\12DEN1.SGM 12DEN1

Agencies

[Federal Register Volume 73, Number 240 (Friday, December 12, 2008)]
[Notices]
[Page 75701]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-29472]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13288-000]


Riverbank Ogdensburg, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

December 8, 2008.
    On September 23, 2008, Riverbank Ogdensburg, LLC filed an 
application, pursuant to section 4(f) of the Federal Power Act (FPA), 
proposing to study the feasibility of the Ogdensburg Pumped Storage 
Project to be located on the St. Lawrence River in St. Lawrence County, 
New York.
    The proposed project would consist of: (1) The St. Lawrence River 
as an upper reservoir; (2) an underground lower reservoir with an 
elevation of 1,800 feet below MSL and a storage capacity of 3,775 acre-
feet; (3) four 13 foot diameter, 2,000 foot long, concrete and steel 
penstocks; (4) an underground powerhouse containing four pump/turbine 
units with a total installed capacity of 1,000 MW; (5) a 345 kV, 18.6 
mile long transmission line; and (6) appurtenant facilities. The annual 
production would be 2,190 GWh which would be sold to a local utility.
    Applicant Contact: William S. Helmer, Esq., 194 Washington Ave., 
Suite 315, Albany, New York 12210 (518) 689-3570.
    FERC Contact: Kelly Houff (202) 502-6393.
    Deadline for filing comments, motions to intervene: 60 days from 
the issuance of this notice. Comments, motions to intervene, notices of 
intent and competing applications may be filed electronically via the 
Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's Web site under the ``e-Filing'' link. If unable to be 
filed electronically, documents may be paper-filed. To paper-file, an 
original and eight copies should be mailed to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426. For more information on how to submit these types 
of filings please go to the Commission's Web site located at https://
www.ferc.gov/filing-comments.asp. More information about this project 
can be viewed or printed on the ``eLibrary'' link of the Commission's 
Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the 
docket number (P-13288) in the docket number field to access the 
document. For assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-29472 Filed 12-11-08; 8:45 am]