Eugene Water and Electric Board; Notice of Authorization for Continued Project Operation, 75417 [E8-29353]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 73, No. 239 / Thursday, December 11, 2008 / Notices
(a) Represent the highest sales volume
type models;
(b) Together, have a nominal cooling
capacity between 95% and 105% of the
nominal cooling capacity of the outdoor
unit;
(c) Not, individually, have a nominal
cooling capacity greater than 50% of the
nominal cooling capacity of the outdoor
unit;
(d) Have a fan speed that is consistent
with the manufacturer’s specifications;
and
(e) All have the same external static
pressure.
(C) Representations. MEUS may make
representations about the energy
efficiency of the S&L Class, for
compliance, marketing, or other
purposes, only to the extent that such
representations are made consistent
with the provisions outlined below:
(i) For S&L Class combinations
utilizing a single outdoor unit that has
been tested in accordance with this
alternate test procedure, MEUS may
make representations based on these test
results.
(ii) For S&L Class combinations
utilizing a single outdoor unit that has
not been tested, MEUS may make
representations which are based on the
testing results for the tested
combination and which are consistent
with either of the two following
methods, except that only method (a)
may be used, if available:
(a) Representation of non-tested
combinations according to an
Alternative Rating Method (‘‘ARM’’)
approved by DOE.
(b) Representation of non-tested
combinations at the same energy
efficiency level as the tested
combination with the same outdoor
unit.
(iii) For S&L Class combinations
utilizing multiple outdoor units that
have been tested in accordance with this
alternate test procedure, MEUS may
make representations based on those
test results.
(iv) For S&L Class combinations
utilizing multiple outdoor units that
have not been tested, MEUS may make
representations which are consistent
with either of the two following
methods, except that only method (a)
may be used, if available:
(a) Representation of non-tested
combinations according to an
Alternative Rating Method (‘‘ARM’’)
approved by DOE.
(b) Representation of non-tested
combinations based on the capacityweighted average of the efficiency
ratings for the tested combinations for
each of the individual outdoor units
used in the system, as determined in
VerDate Aug<31>2005
17:27 Dec 10, 2008
Jkt 217001
accordance with the provisions of this
alternate test procedure.
[FR Doc. E8–29335 Filed 12–10–08; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2242]
Eugene Water and Electric Board;
Notice of Authorization for Continued
Project Operation
December 4, 2008.
On November 24, 2006, Eugene Water
and Electric Board, licensee for the
Carmen-Smith Hydroelectric Project,
filed an Application for a New License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Carmen-Smith
Hydroelectric Project is located on
McKenzie River in Lane and Linn
Counties, near McKenzie Bridge,
Oregon.
The license for Project No. 2242 was
issued for a period ending November 30,
2008. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2242
is issued to the Eugene Water and
Electric Board for a period effective
December 1, 2008 through November
30, 2009, or until the issuance of a new
license for the project or other
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
75417
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before November 30, 2009,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise. If the project is not subject to
section 15 of the FPA, notice is hereby
given that the Eugene Water and Electric
Board is authorized to continue
operation of the Carmen-Smith
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–29353 Filed 12–10–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–503–048]
Idaho Power Company; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
December 5, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–503–048.
c. Date filed: June 26, 2008.
d. Applicant: Idaho Power Company.
e. Name of Project: Swan Falls
Hydroelectric Project.
f. Location: The Swan Falls
Hydroelectric Project is located on the
Snake River at river mile (RM) 457.7 in
Ada and Owyhee counties of
southwestern Idaho, about 35 miles
southwest of Boise. The project
occupies 528.84 acres of lands of the
United States within the Snake River
Birds of Prey National Conservation
Area.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Tom
Saldin, Senior Vice President and
General Counsel, Idaho Power
Company, P.O. Box 70, Boise, Idaho
83707 (208) 388–2550.
i. FERC Contact: James Puglisi (202)
502–6241 or james.puglisi@ferc.gov.
j. Deadline for filing motions to
intervene and protests 60 days from the
issuance date of this notice.
E:\FR\FM\11DEN1.SGM
11DEN1
Agencies
[Federal Register Volume 73, Number 239 (Thursday, December 11, 2008)]
[Notices]
[Page 75417]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-29353]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2242]
Eugene Water and Electric Board; Notice of Authorization for
Continued Project Operation
December 4, 2008.
On November 24, 2006, Eugene Water and Electric Board, licensee for
the Carmen-Smith Hydroelectric Project, filed an Application for a New
License pursuant to the Federal Power Act (FPA) and the Commission's
regulations thereunder. The Carmen-Smith Hydroelectric Project is
located on McKenzie River in Lane and Linn Counties, near McKenzie
Bridge, Oregon.
The license for Project No. 2242 was issued for a period ending
November 30, 2008. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2242 is issued to
the Eugene Water and Electric Board for a period effective December 1,
2008 through November 30, 2009, or until the issuance of a new license
for the project or other disposition under the FPA, whichever comes
first. If issuance of a new license (or other disposition) does not
take place on or before November 30, 2009, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1)
of the FPA is renewed automatically without further order or notice by
the Commission, unless the Commission orders otherwise. If the project
is not subject to section 15 of the FPA, notice is hereby given that
the Eugene Water and Electric Board is authorized to continue operation
of the Carmen-Smith Hydroelectric Project, until such time as the
Commission acts on its application for a subsequent license.