Download as PDF mstockstill on PROD1PC66 with NOTICES Federal Register / Vol. 73, No. 239 / Thursday, December 11, 2008 / Notices (a) Represent the highest sales volume type models; (b) Together, have a nominal cooling capacity between 95% and 105% of the nominal cooling capacity of the outdoor unit; (c) Not, individually, have a nominal cooling capacity greater than 50% of the nominal cooling capacity of the outdoor unit; (d) Have a fan speed that is consistent with the manufacturer’s specifications; and (e) All have the same external static pressure. (C) Representations. MEUS may make representations about the energy efficiency of the S&L Class, for compliance, marketing, or other purposes, only to the extent that such representations are made consistent with the provisions outlined below: (i) For S&L Class combinations utilizing a single outdoor unit that has been tested in accordance with this alternate test procedure, MEUS may make representations based on these test results. (ii) For S&L Class combinations utilizing a single outdoor unit that has not been tested, MEUS may make representations which are based on the testing results for the tested combination and which are consistent with either of the two following methods, except that only method (a) may be used, if available: (a) Representation of non-tested combinations according to an Alternative Rating Method (‘‘ARM’’) approved by DOE. (b) Representation of non-tested combinations at the same energy efficiency level as the tested combination with the same outdoor unit. (iii) For S&L Class combinations utilizing multiple outdoor units that have been tested in accordance with this alternate test procedure, MEUS may make representations based on those test results. (iv) For S&L Class combinations utilizing multiple outdoor units that have not been tested, MEUS may make representations which are consistent with either of the two following methods, except that only method (a) may be used, if available: (a) Representation of non-tested combinations according to an Alternative Rating Method (‘‘ARM’’) approved by DOE. (b) Representation of non-tested combinations based on the capacityweighted average of the efficiency ratings for the tested combinations for each of the individual outdoor units used in the system, as determined in VerDate Aug<31>2005 17:27 Dec 10, 2008 Jkt 217001 accordance with the provisions of this alternate test procedure. [FR Doc. E8–29335 Filed 12–10–08; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2242] Eugene Water and Electric Board; Notice of Authorization for Continued Project Operation December 4, 2008. On November 24, 2006, Eugene Water and Electric Board, licensee for the Carmen-Smith Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Carmen-Smith Hydroelectric Project is located on McKenzie River in Lane and Linn Counties, near McKenzie Bridge, Oregon. The license for Project No. 2242 was issued for a period ending November 30, 2008. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2242 is issued to the Eugene Water and Electric Board for a period effective December 1, 2008 through November 30, 2009, or until the issuance of a new license for the project or other PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 75417 disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before November 30, 2009, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the Eugene Water and Electric Board is authorized to continue operation of the Carmen-Smith Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Kimberly D. Bose, Secretary. [FR Doc. E8–29353 Filed 12–10–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P–503–048] Idaho Power Company; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests December 5, 2008. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: P–503–048. c. Date filed: June 26, 2008. d. Applicant: Idaho Power Company. e. Name of Project: Swan Falls Hydroelectric Project. f. Location: The Swan Falls Hydroelectric Project is located on the Snake River at river mile (RM) 457.7 in Ada and Owyhee counties of southwestern Idaho, about 35 miles southwest of Boise. The project occupies 528.84 acres of lands of the United States within the Snake River Birds of Prey National Conservation Area. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Mr. Tom Saldin, Senior Vice President and General Counsel, Idaho Power Company, P.O. Box 70, Boise, Idaho 83707 (208) 388–2550. i. FERC Contact: James Puglisi (202) 502–6241 or james.puglisi@ferc.gov. j. Deadline for filing motions to intervene and protests 60 days from the issuance date of this notice. E:\FR\FM\11DEN1.SGM 11DEN1

Agencies

[Federal Register Volume 73, Number 239 (Thursday, December 11, 2008)]
[Notices]
[Page 75417]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-29353]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2242]


Eugene Water and Electric Board; Notice of Authorization for 
Continued Project Operation

December 4, 2008.
    On November 24, 2006, Eugene Water and Electric Board, licensee for 
the Carmen-Smith Hydroelectric Project, filed an Application for a New 
License pursuant to the Federal Power Act (FPA) and the Commission's 
regulations thereunder. The Carmen-Smith Hydroelectric Project is 
located on McKenzie River in Lane and Linn Counties, near McKenzie 
Bridge, Oregon.
    The license for Project No. 2242 was issued for a period ending 
November 30, 2008. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 2242 is issued to 
the Eugene Water and Electric Board for a period effective December 1, 
2008 through November 30, 2009, or until the issuance of a new license 
for the project or other disposition under the FPA, whichever comes 
first. If issuance of a new license (or other disposition) does not 
take place on or before November 30, 2009, notice is hereby given that, 
pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) 
of the FPA is renewed automatically without further order or notice by 
the Commission, unless the Commission orders otherwise. If the project 
is not subject to section 15 of the FPA, notice is hereby given that 
the Eugene Water and Electric Board is authorized to continue operation 
of the Carmen-Smith Hydroelectric Project, until such time as the 
Commission acts on its application for a subsequent license.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-29353 Filed 12-10-08; 8:45 am]
BILLING CODE 6717-01-P