Grays Harbor Ocean Energy Company, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 74165-74166 [E8-28780]

Download as PDF Federal Register / Vol. 73, No. 235 / Friday, December 5, 2008 / Notices assistance, call toll-free 1–866–208– 3372. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. E8–28776 Filed 12–4–08; 8:45 am] [Project No. 13271–000] BILLING CODE 6717–01–P FFP Project 1, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications DEPARTMENT OF ENERGY Federal Energy Regulatory Commission dwashington3 on PROD1PC60 with NOTICES [Project No. 13312–000] On August 11, 2008, FFP Project 1, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Crescent City Project, to be located on the Mississippi River Jefferson, Orleans, St Bernard Parishes, Louisiana. The proposed Crescent City Project consists of: (1) 4,850 proposed 20 kilowatt free flow generating units having a total installed capacity of 97 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The FFP Project 1, LLC, project would have an average annual generation of 420.86 gigawatt-hours and be sold to a local utility. Applicant Contact: Mr. Dan Irvin, FFP Project 1, LLC, 33 Commercial Street, Gloucester, MA 01930, phone (978) 226–7361. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13271) in the docket number field to access the document. For Grays Harbor Ocean Energy Company, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications 15:27 Dec 04, 2008 Jkt 217001 November 28, 2008. On October 22, 2008, Grays Harbor Ocean Energy Company, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Rhode Island Ocean Energy Project, to be located on the Atlantic Ocean 12 to 25 miles offshore from Suffolk County, New York and Washington County, Rhode Island. The proposed Rhode Island Ocean Energy Project consists of: (1) 100 proposed 1 megawatt OceanLinx Wave Energy Converter generating units having a total installed capacity of 100 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The Grays Harbor Ocean Energy Company, LLC, project would have an average annual generation of 300 gigawatt-hours and be sold to a local utility. Applicant Contact: Mr. W. Burton Hamner, Grays Harbor Ocean Energy Company, LLC, 5534 30th Avenue NE., Seattle, WA 98105, phone (206) 491– 0945. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s website under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13312) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E8–28772 Filed 12–4–08; 8:45 am] November 28, 2008. VerDate Aug<31>2005 74165 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13306–000] Grays Harbor Ocean Energy Company, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications November 28, 2008. On October 22, 2008, Grays Harbor Ocean Energy Company, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the New Jersey Ocean Energy Project, to be located on the Atlantic Ocean 12 to 25 miles offshore from Atlantic County, New Jersey. The proposed New Jersey Ocean Energy Project consists of: (1) 100 proposed 1 megawatt OceanLinx Wave Energy Converter generating units having a total installed capacity of 100 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The Grays Harbor Ocean Energy Company, LLC, project would have an average annual generation of 300 gigawatt-hours and be sold to a local utility. Applicant Contact: Mr. W. Burton Hamner, Grays Harbor Ocean Energy Company, LLC, 5534 30th Avenue, NE., Seattle, WA 98105, phone (206) 491– 0945. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the E:\FR\FM\05DEN1.SGM 05DEN1 74166 Federal Register / Vol. 73, No. 235 / Friday, December 5, 2008 / Notices ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https:// www.ferc.gov/filing-comments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13306) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E8–28780 Filed 12–4–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13307–000] Grays Harbor Ocean Energy Company, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications dwashington3 on PROD1PC60 with NOTICES November 28, 2008. On October 22, 2008, Grays Harbor Ocean Energy Company, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Hawaii Ocean Energy Project, to be located on the Pacific Ocean 12 to 25 miles offshore from Honolulu County, Hawaii. The proposed Hawaii Ocean Energy Project consists of: (1) 100 proposed 1 megawatt OceanLinx Wave Energy Converter generating units having a total installed capacity of 100 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The Grays Harbor Ocean Energy Company, LLC, project would have an average annual generation of 300 gigawatt-hours and be sold to a local utility. Applicant Contact: Mr. W. Burton Hamner, Grays Harbor Ocean Energy Company, LLC, 5534 30th Avenue, NE., Seattle, WA 98105, phone (206) 491– 0945. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, motions to intervene, competing applications VerDate Aug<31>2005 15:27 Dec 04, 2008 Jkt 217001 (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13307) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E8–28781 Filed 12–4–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. E8–28782 Filed 12–4–08; 8:45 am] [Project No. 13308–000] Grays Harbor Ocean Energy Company, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications November 28, 2008. On October 22, 2008, Grays Harbor Ocean Energy Company, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the San Francisco Ocean Energy Project, to be located on the Pacific Ocean 20 to 25 mile offshore from San Francisco and Marin Counties, California. The proposed San Francisco Ocean Energy Project consists of: (1) 100 proposed 1 megawatt OceanLinx Wave Energy Converter generating units having a total installed capacity of 100 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The Grays Harbor Ocean Energy Company, LLC, project would have an average annual generation of 300 gigawatt-hours and be sold to a local utility. PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 Applicant Contact: Mr. W. Burton Hamner, Grays Harbor Ocean Energy Company, LLC, 5534 30th Avenue, NE., Seattle, WA 98105, phone (206) 491– 0945. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13308) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13309–000] Grays Harbor Ocean Energy Company, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications November 28, 2008. On October 22, 2008, Grays Harbor Ocean Energy Company, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Ventura Ocean Energy Project, to be located on the Pacific Ocean 12 to 25 mile offshore from Ventura and Santa Barbara Counties, Massachusetts. The proposed Ventura Ocean Energy Project consists of: (1) 100 proposed 1 E:\FR\FM\05DEN1.SGM 05DEN1

Agencies

[Federal Register Volume 73, Number 235 (Friday, December 5, 2008)]
[Notices]
[Pages 74165-74166]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-28780]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13306-000]


Grays Harbor Ocean Energy Company, LLC; Notice of Preliminary 
Permit Applications Accepted for Filing and Soliciting Comment, Motions 
To Intervene, and Competing Applications

November 28, 2008.
    On October 22, 2008, Grays Harbor Ocean Energy Company, LLC filed 
an application, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the New Jersey Ocean Energy 
Project, to be located on the Atlantic Ocean 12 to 25 miles offshore 
from Atlantic County, New Jersey.
    The proposed New Jersey Ocean Energy Project consists of: (1) 100 
proposed 1 megawatt OceanLinx Wave Energy Converter generating units 
having a total installed capacity of 100 megawatts, (2) a proposed 
transmission line, and (3) appurtenant facilities. The Grays Harbor 
Ocean Energy Company, LLC, project would have an average annual 
generation of 300 gigawatt-hours and be sold to a local utility.
    Applicant Contact: Mr. W. Burton Hamner, Grays Harbor Ocean Energy 
Company, LLC, 5534 30th Avenue, NE., Seattle, WA 98105, phone (206) 
491-0945.
    FERC Contact: Robert Bell, (202) 502-6062.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the

[[Page 74166]]

``e-Filing'' link. If unable to be filed electronically, documents may 
be paper-filed. To paper-file, an original and eight copies should be 
mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426. For more 
information on how to submit these types of filings please go to the 
Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or 
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13306) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-28780 Filed 12-4-08; 8:45 am]
BILLING CODE 6717-01-P