FFP Project 1, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 74165 [E8-28776]
Download as PDF
Federal Register / Vol. 73, No. 235 / Friday, December 5, 2008 / Notices
assistance, call toll-free 1–866–208–
3372.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E8–28776 Filed 12–4–08; 8:45 am]
[Project No. 13271–000]
BILLING CODE 6717–01–P
FFP Project 1, LLC; Notice of
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
dwashington3 on PROD1PC60 with NOTICES
[Project No. 13312–000]
On August 11, 2008, FFP Project 1,
LLC filed an application, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Crescent City Project, to be located on
the Mississippi River Jefferson, Orleans,
St Bernard Parishes, Louisiana.
The proposed Crescent City Project
consists of: (1) 4,850 proposed 20
kilowatt free flow generating units
having a total installed capacity of 97
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Project 1, LLC, project would have
an average annual generation of 420.86
gigawatt-hours and be sold to a local
utility.
Applicant Contact: Mr. Dan Irvin, FFP
Project 1, LLC, 33 Commercial Street,
Gloucester, MA 01930, phone (978)
226–7361.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments,
motions to intervene, competing
applications (without notices of intent),
or notices of intent to file competing
applications: 60 days from the issuance
of this notice. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. If unable
to be filed electronically, documents
may be paper-filed. To paper-file, an
original and eight copies should be
mailed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13271) in the docket number
field to access the document. For
Grays Harbor Ocean Energy Company,
LLC; Notice of Preliminary Permit
Applications Accepted for Filing and
Soliciting Comment, Motions To
Intervene, and Competing Applications
15:27 Dec 04, 2008
Jkt 217001
November 28, 2008.
On October 22, 2008, Grays Harbor
Ocean Energy Company, LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Rhode Island
Ocean Energy Project, to be located on
the Atlantic Ocean 12 to 25 miles
offshore from Suffolk County, New York
and Washington County, Rhode Island.
The proposed Rhode Island Ocean
Energy Project consists of: (1) 100
proposed 1 megawatt OceanLinx Wave
Energy Converter generating units
having a total installed capacity of 100
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
Grays Harbor Ocean Energy Company,
LLC, project would have an average
annual generation of 300 gigawatt-hours
and be sold to a local utility.
Applicant Contact: Mr. W. Burton
Hamner, Grays Harbor Ocean Energy
Company, LLC, 5534 30th Avenue NE.,
Seattle, WA 98105, phone (206) 491–
0945.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s website under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13312) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–28772 Filed 12–4–08; 8:45 am]
November 28, 2008.
VerDate Aug<31>2005
74165
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13306–000]
Grays Harbor Ocean Energy Company,
LLC; Notice of Preliminary Permit
Applications Accepted for Filing and
Soliciting Comment, Motions To
Intervene, and Competing Applications
November 28, 2008.
On October 22, 2008, Grays Harbor
Ocean Energy Company, LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the New Jersey
Ocean Energy Project, to be located on
the Atlantic Ocean 12 to 25 miles
offshore from Atlantic County, New
Jersey.
The proposed New Jersey Ocean
Energy Project consists of: (1) 100
proposed 1 megawatt OceanLinx Wave
Energy Converter generating units
having a total installed capacity of 100
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
Grays Harbor Ocean Energy Company,
LLC, project would have an average
annual generation of 300 gigawatt-hours
and be sold to a local utility.
Applicant Contact: Mr. W. Burton
Hamner, Grays Harbor Ocean Energy
Company, LLC, 5534 30th Avenue, NE.,
Seattle, WA 98105, phone (206) 491–
0945.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
E:\FR\FM\05DEN1.SGM
05DEN1
Agencies
[Federal Register Volume 73, Number 235 (Friday, December 5, 2008)]
[Notices]
[Page 74165]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-28776]
[[Page 74165]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13271-000]
FFP Project 1, LLC; Notice of Preliminary Permit Applications
Accepted for Filing and Soliciting Comment, Motions To Intervene, and
Competing Applications
November 28, 2008.
On August 11, 2008, FFP Project 1, LLC filed an application,
pursuant to section 4(f) of the Federal Power Act, proposing to study
the feasibility of the Crescent City Project, to be located on the
Mississippi River Jefferson, Orleans, St Bernard Parishes, Louisiana.
The proposed Crescent City Project consists of: (1) 4,850 proposed
20 kilowatt free flow generating units having a total installed
capacity of 97 megawatts, (2) a proposed transmission line, and (3)
appurtenant facilities. The FFP Project 1, LLC, project would have an
average annual generation of 420.86 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP Project 1, LLC, 33 Commercial
Street, Gloucester, MA 01930, phone (978) 226-7361.
FERC Contact: Robert Bell, (202) 502-6062.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of the Commission's Web site at http:/
/www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13271) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-28776 Filed 12-4-08; 8:45 am]
BILLING CODE 6717-01-P