Carolina Gas Transmission Corporation; Notice of Request Under Blanket Authorization, 70636 [E8-27689]

Download as PDF dwashington3 on PRODPC61 with NOTICES 70636 Federal Register / Vol. 73, No. 226 / Friday, November 21, 2008 / Notices list for the aforementioned project as follows: Don Klima or Representative, Advisory Council on Historic Preservation, The Old Post Office Building, Suite 803, 1100 Pennsylvania Avenue, NW., Washington, DC 20004 Michael Graves, Hall Estil Attorneys at Law, 320 South Boston Ave., Suite 400, Tulsa, OK 74103 Olen Hill or Representative, City Manager, City of Broken Bow, 210 North Broadway, Broken Bow, OK 74728 Melvena Heisch or Representative, Deputy SHPO, Oklahoma Historical Society, 2401 N. Laird Avenue, Oklahoma City, OK 73105 Robert L. Brooks or Representative, State Archaeologist, Oklahoma Archeological Survey, 111 E. Chesapeake St., Norman, OK 73019– 5111 Gregory E. Pyle or Representative, Chief, Choctaw Nation of Oklahoma, P.O. Drawer 1210, Durant, OK 74702–1210 LaRue Martin Parker or Representative, Chairperson, Caddo Nation of Oklahoma, PO Box 487, Binger, OK 73009 Scott Henderson, US Army Corps of Engineers, Tulsa District, 1645 S. 101st East Ave., Tulsa, OK 74128 Any person on the official service list for the above-captioned proceeding may request inclusion on the restricted service list, or may request that a restricted service list not be established, by filing a motion to that effect within 15 days of this notice date. In any such request for inclusion, the requesting entity should identify the reason(s) why there is an interest to be included. Also, please identify any concerns about historic properties, including Traditional Cultural Properties. If historic properties are identified within the motion, a separate page, labeled NON-PUBLIC Information, should be used and attached to the request. An original and 8 copies of any such motion must be filed with Kimberly D. Bose, Secretary of the Commission, 888 First Street, NE., Washington, DC 20426. The motion also must be served on each person whose name appears on the official service list. Please put the project name ‘‘Pine Creek Lake Dam Hydroelectric Project’’ and number ‘‘P–12646–001’’ on the front page of any motion. Motions may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov) under the ‘‘e-Filing’’ link. VerDate Aug<31>2005 14:24 Nov 20, 2008 Jkt 217001 If no such motions are filed, the restricted service list will be effective at the end of the 15 day period. Otherwise, a further notice will be issued ruling on any motion or motions filed within the 15 day period. Kimberly D. Bose, Secretary. [FR Doc. E8–27687 Filed 11–20–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09–21–000] Carolina Gas Transmission Corporation; Notice of Request Under Blanket Authorization November 17, 2008. Take notice that on November 7, 2008, Carolina Gas Transmission Corporation (CGT), 1426 Main Street, Columbia, South Carolina 29201, filed with the Commission in docket number CP09–21–000, a prior notice request pursuant to sections 157.205 and 157.214, Subpart F (2008), of the Commission’s Regulations under the Natural Gas Act, and CGT’s blanket certificate issued in Docket No. CP06– 72–000, to construct and operate a delivery point located in Effingham County, Georgia to serve Georgia Pacific Consumer Products LP facility. The construction of this delivery point will constitute a bypass of Atlanta Gas Light, a local distribution company that currently is serving the Georgia-Pacific facility. CTG’s facilities will have the capability of delivering up to 15,000 Dth per day. The estimated construction costs for these facilities are $194,385, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Randy D. Traylor, Jr., Manager of Engineering— Capital Projects, Carolina Gas Transmission Corporation, 601 Old Taylor Road, Cayce, South Carolina 29033, at (803) 217–2255 or by e-mail dtraoylor@scana.com. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E8–27689 Filed 11–20–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Southwestern Power Administration Solicitation of Interest for Transmission Line Projects Under EPAct05 Section 1222 Associated With Renewable Generation Sources United States Department of Energy, Southwestern Power Administration. ACTION: Request for Statements of Interest. AGENCY: SUMMARY: The United States Department of Energy (DOE or Department) acting through the Southwestern Power Administration (Southwestern), a power marketing administration within the Department, is seeking Statements of Interest (SOIs) from entities that are interested in providing contributed funds for Southwestern’s participation in the upgrade of Southwestern’s existing transmission facilities or the construction of new transmission line projects in the states in which Southwestern operates. The purpose of the request for SOIs is to identify potential projects which would facilitate the transmission of wind generation or other renewable generation sources to load centers under the authority granted the Secretary of Energy in section 1222 E:\FR\FM\21NON1.SGM 21NON1

Agencies

[Federal Register Volume 73, Number 226 (Friday, November 21, 2008)]
[Notices]
[Page 70636]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-27689]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP09-21-000]


Carolina Gas Transmission Corporation; Notice of Request Under 
Blanket Authorization

November 17, 2008.
    Take notice that on November 7, 2008, Carolina Gas Transmission 
Corporation (CGT), 1426 Main Street, Columbia, South Carolina 29201, 
filed with the Commission in docket number CP09-21-000, a prior notice 
request pursuant to sections 157.205 and 157.214, Subpart F (2008), of 
the Commission's Regulations under the Natural Gas Act, and CGT's 
blanket certificate issued in Docket No. CP06-72-000, to construct and 
operate a delivery point located in Effingham County, Georgia to serve 
Georgia Pacific Consumer Products LP facility. The construction of this 
delivery point will constitute a bypass of Atlanta Gas Light, a local 
distribution company that currently is serving the Georgia-Pacific 
facility. CTG's facilities will have the capability of delivering up to 
15,000 Dth per day. The estimated construction costs for these 
facilities are $194,385, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection. The 
filing may also be viewed on the Web at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to Randy 
D. Traylor, Jr., Manager of Engineering--Capital Projects, Carolina Gas 
Transmission Corporation, 601 Old Taylor Road, Cayce, South Carolina 
29033, at (803) 217-2255 or by e-mail dtraoylor@scana.com.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for protest. If a protest is filed and not 
withdrawn within 30 days after the time allowed for filing a protest, 
the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the Internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (https://www.ferc.gov) under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-27689 Filed 11-20-08; 8:45 am]
BILLING CODE 6717-01-P