Florida Gas Transmission Company, LLC; Notice of Application, 70630-70631 [E8-27688]
Download as PDF
70630
Federal Register / Vol. 73, No. 226 / Friday, November 21, 2008 / Notices
Issued at Washington, DC, on November
17, 2008.
Rachel Samuel,
Deputy Committee Management Officer.
[FR Doc. E8–27722 Filed 11–20–08; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–17–000, PF08–14–000]
Florida Gas Transmission Company,
LLC; Notice of Application
dwashington3 on PRODPC61 with NOTICES
November 17, 2008.
Take notice that on October 31, 2008,
Florida Gas Transmission Company,
LLC (FGT), 5444 Westheimer Road,
Houston, Texas 77056–5306, filed in the
above referenced docket an application
pursuant to section 7(c) of the Natural
Gas Act (NGA) and parts 157 and 284
of the Commission’s regulations, for an
order granting a certificate of public
convenience and necessity authorizing
the construction and operation of
natural gas pipeline and compression
facilities and to acquire pipeline
facilities, all as more fully set forth in
the application which is on file with the
Commission and open to public
inspection. The filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@gerc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Specifically, FGT proposes in its
Phase VIII Expansion Project to: (i)
Construct and operate 483.2 miles of
pipeline loop, mainline, and laterals; (ii)
install 213,600 horsepower of
compression at existing and new
compressor stations; (iii) acquire from
Florida Power & Light Company (FPL) a
22.7 mile pipeline; and (iv) construct
and operate various metering and
regulating facilities. All of the facilities
comprising the Phase VIII Expansion
Project will be located in the states of
Alabama and Florida. FGT estimates
that the proposed facilities will cost
approximately $2.455 billion. The
facilities will be able to provide an
annual average of 820,000 MMBtu/day
of firm transportation. FGT proposes a
new firm rate schedule, Rate Schedule
FTS–3 for service on the expansion.
Any questions concerning this
application may be directed to Stephen
VerDate Aug<31>2005
14:24 Nov 20, 2008
Jkt 217001
T. Veatch, Sr. Director, Certificates and
Tariffs, Florida Gas Transmission
Company, LLC, 5444 Westheimer Road,
Houston, Texas 77056–5306 or at 713–
989–2024 or stephen.veatch@sug.com.
On March 18, 2008, the Commission
staff granted FGT’s request to utilize the
FERC Pre-Filing Process and assigned
Docket No. PF08–14–000 to staff
activities involved the Phase VIII
Expansion Project. Now as of the filing
of FGT’s application on October 31,
2008, the Pre-Filing Process for this
project has ended. From this time
forward, this proceeding will be
conducted in Docket No. CP09–17–000,
as noted in the caption of this Notice.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice, the
Commission staff will either: complete
the environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street,
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
E:\FR\FM\21NON1.SGM
21NON1
Federal Register / Vol. 73, No. 226 / Friday, November 21, 2008 / Notices
Comment Date: December 8, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–27688 Filed 11–20–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
dwashington3 on PRODPC61 with NOTICES
November 14, 2008.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER08–321–002.
Applicants: New York Independent
System Operator, Inc.
Description: Motion for extension of
waiver and extension of Commission
instruction by the New York
Independent System Operator, Inc.
Filed Date: 11/12/2008.
Accession Number: 20081114–0195.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 19, 2008.
Docket Numbers: ER09–185–000.
Applicants: Weyerhaeuser NR
Company.
Description: Weyerhaeuser NR Co.
submits a Petition for Acceptance of
Initial Rate Schedule, Waivers and
Blanket Authority.
Filed Date: 11/07/2008.
Accession Number: 20081110–0260.
Comment Date: 5 p.m. Eastern Time
on Friday, November 28, 2008.
Docket Numbers: ER09–252–000.
Applicants: Mid-Continent Area
Power Pool.
Description: Mid-Continent Area
Power Pool submits clarifying revisions
to FERC Electric Tariff, First Revised
Volume No. 1 in compliance with Order
No. 676–C.
Filed Date: 10/31/2008.
Accession Number: 20081110–0246.
Comment Date: 5 p.m. Eastern Time
on Friday, November 21, 2008.
Docket Numbers: ER09–273–000.
Applicants: New York Independent
System Operator, Inc.
Description: New York Independent
System Operator, Inc submits tariff
revisions to its Market Administration
and Control Area Services Tariff to
replace the current method of
calculating the amount of Unforced
Capacity that Limited Control Run etc.
Filed Date: 11/12/2008.
Accession Number: 20081113–0102.
Comment Date: 5 p.m. Eastern Time
on Wednesday, December 3, 2008.
Docket Numbers: ER09–274–000.
Applicants: Tampa Electric Company.
VerDate Aug<31>2005
14:24 Nov 20, 2008
Jkt 217001
Description: Tampa Electric Company
submits the Operating Agreement
Between Tampa Electric Company and
Progress Energy Florida Corporation for
the Union Hall-Trilby Interconnection,
dated 10/31/08.
Filed Date: 11/12/2008.
Accession Number: 20081113–0101.
Comment Date: 5 p.m. Eastern Time
on Wednesday, December 3, 2008.
Docket Numbers: ER09–275–000.
Applicants: Calpine Bethpage 3, LLC.
Description: Calpine Bethpage 3, LLC
submits notice of cancellation of its
FERC Electric Tariff, First Revised
Volume 1.
Filed Date: 11/12/2008.
Accession Number: 20081114–0126.
Comment Date: 5 p.m. Eastern Time
on Wednesday, December 3, 2008.
Docket Numbers: ER09–276–000.
Applicants: Calpine Energy
Management, L.P.
Description: Calpine Energy
Management, LP submits notice of
cancellation of its FERC Electric Tariff,
First Revised Volume 1.
Filed Date: 11/12/2008.
Accession Number: 20081114–0125.
Comment Date: 5 p.m. Eastern Time
on Wednesday, December 3, 2008.
Docket Numbers: ER09–277–000.
Applicants: Calpine California
Equipment Finance Company.
Description: Calpine California
Equipment Finance Company, LLC
submits notice of cancellation of its
FERC Electric Tariff, First Revised
Volume 1.
Filed Date: 11/12/2008.
Accession Number: 20081114–0124.
Comment Date: 5 p.m. Eastern Time
on Wednesday, December 3, 2008.
Docket Numbers: ER09–278–000.
Applicants: Calpine Merchant
Services Company, Inc.
Description: Calpine Merchant
Services Company, Inc. submits notice
of cancellation of its FERC Electric
Tariff, First Revised Volume 1.
Filed Date: 11/12/2008.
Accession Number: 20081114–0123.
Comment Date: 5 p.m. Eastern Time
on Wednesday, December 3, 2008.
Docket Numbers: ER09–280–000.
Applicants: Calpine Northbrook
Energy Marketing, LLC.
Description: Calpine Northbrook
Energy Marketing, LLC submits a notice
of cancellation of its FERC Electric
Tariff, First Revised Volume 1.
Filed Date: 11/12/2008.
Accession Number: 20081114–0122.
Comment Date: 5 p.m. Eastern Time
on Wednesday, December 3, 2008.
Docket Numbers: ER09–283–000.
Applicants: Entergy Services, Inc.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
70631
Description: Entergy Operating
Companies submits Eighth Revised
Network Integration Transmission
Service Agreement with East Texas
Electric Cooperative, Inc. et al.
Filed Date: 11/12/2008.
Accession Number: 20081114–0120.
Comment Date: 5 p.m. Eastern Time
on Wednesday, December 3, 2008.
Docket Numbers: ER09–287–000.
Applicants: Alliant Energy Corporate
Services, Inc.
Description: Alliant Energy Corporate
Services, Inc. request for waiver/
suspension and notice of cancellation of
Ancillary Service Schedules of Open
Access Transmission Tariffs.
Filed Date: 11/12/2008.
Accession Number: 20081114–0116.
Comment Date: 5 p.m. Eastern Time
on Wednesday, December 3, 2008.
Docket Numbers: ER09–290–000.
Applicants: Maine Electric Power
Company, Inc.
Description: Maine Electric Power
Company, Inc. et al. submits revised
Attachment H of the ISO New England
Open Access Transmission Tariff etc, to
be effective 12/1/08 under ER09–290.
Filed Date: 11/12/2008.
Accession Number: 20081114–0174.
Comment Date: 5 p.m. Eastern Time
on Wednesday, December 3, 2008.
Take notice that the Commission
received the following open access
transmission tariff filings:
Docket Numbers: OA07–19–004;
OA07–43–005; ER07–1171–005.
Applicants: Arizona Public Service
Company.
Description: Arizona Public Service
Company submits its Supplemental
Annual Compliance Report on Penalty
Assessments and Distributions.
Filed Date: 10/30/2008.
Accession Number: 20081030–5127.
Comment Date: 5 p.m. Eastern Time
on Thursday, November 20, 2008.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
E:\FR\FM\21NON1.SGM
21NON1
Agencies
[Federal Register Volume 73, Number 226 (Friday, November 21, 2008)]
[Notices]
[Pages 70630-70631]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-27688]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP09-17-000, PF08-14-000]
Florida Gas Transmission Company, LLC; Notice of Application
November 17, 2008.
Take notice that on October 31, 2008, Florida Gas Transmission
Company, LLC (FGT), 5444 Westheimer Road, Houston, Texas 77056-5306,
filed in the above referenced docket an application pursuant to section
7(c) of the Natural Gas Act (NGA) and parts 157 and 284 of the
Commission's regulations, for an order granting a certificate of public
convenience and necessity authorizing the construction and operation of
natural gas pipeline and compression facilities and to acquire pipeline
facilities, all as more fully set forth in the application which is on
file with the Commission and open to public inspection. The filing is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at FERCOnlineSupport@gerc.gov or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
Specifically, FGT proposes in its Phase VIII Expansion Project to:
(i) Construct and operate 483.2 miles of pipeline loop, mainline, and
laterals; (ii) install 213,600 horsepower of compression at existing
and new compressor stations; (iii) acquire from Florida Power & Light
Company (FPL) a 22.7 mile pipeline; and (iv) construct and operate
various metering and regulating facilities. All of the facilities
comprising the Phase VIII Expansion Project will be located in the
states of Alabama and Florida. FGT estimates that the proposed
facilities will cost approximately $2.455 billion. The facilities will
be able to provide an annual average of 820,000 MMBtu/day of firm
transportation. FGT proposes a new firm rate schedule, Rate Schedule
FTS-3 for service on the expansion.
Any questions concerning this application may be directed to
Stephen T. Veatch, Sr. Director, Certificates and Tariffs, Florida Gas
Transmission Company, LLC, 5444 Westheimer Road, Houston, Texas 77056-
5306 or at 713-989-2024 or stephen.veatch@sug.com.
On March 18, 2008, the Commission staff granted FGT's request to
utilize the FERC Pre-Filing Process and assigned Docket No. PF08-14-000
to staff activities involved the Phase VIII Expansion Project. Now as
of the filing of FGT's application on October 31, 2008, the Pre-Filing
Process for this project has ended. From this time forward, this
proceeding will be conducted in Docket No. CP09-17-000, as noted in the
caption of this Notice.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice, the Commission staff will either:
complete the environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 14 copies of filings made in the proceeding with the Commission
and must mail a copy to the applicant and to every other party. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
[[Page 70631]]
Comment Date: December 8, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-27688 Filed 11-20-08; 8:45 am]