PPL Holtwood, LLC, Pennsylvania; Notice of Availability of the Final Environmental Impact Statement for the Holtwood Project, 70343-70344 [E8-27565]
Download as PDF
Federal Register / Vol. 73, No. 225 / Thursday, November 20, 2008 / Notices
For assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–27569 Filed 11–19–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–19–000]
Port Barre Investments, LLC (d/b/a
Bobcat Gas Storage); Notice of
Amendment Application
rwilkins on PROD1PC63 with NOTICES
November 14, 2008.
On November 5, 2008, Bobcat Gas
Storage (Bobcat), pursuant to section
7(c) of the Natural Gas Act, as amended,
and parts 157 and 284 of the Federal
Energy Regulatory Commission’s
(Commission) regulations, filed to
amend its certificate. The requested
amendment would expand the Bobcat
Gas Storage Project certificated in CP06–
66–000 on April 19, 2007, as amended,
to add working gas capacity totaling 24
billion cubic feet (Bcf) in three new salt
dome storage caverns. The amendment
would expand total storage project
working gas capacity to 39.6 Bcf and
add additional compression and
pipeline interconnection facilities.
Compression additions would increase
maximum gas deliverability to 3.0 Bcf/
d. Bobcat requests a finding that after
the amendment the storage project’s
operation will not exercise market
power with respect to the storage and
hub services provided and that marketbased rates may continue to be charged
for these services.
Questions concerning this application
should be directed to Paul Bieniawski,
Bobcat Gas Storage, 11200 Westheimer,
Suite 625, Houston, TX 77042, (713)
800–3535 or Lisa Tonery, Fulbright &
Jaworski L.L.P., 666 Fifth Avenue, New
York, NY 10103, (212) 318–3009.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
VerDate Aug<31>2005
18:26 Nov 19, 2008
Jkt 217001
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on December 5, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–27562 Filed 11–19–08; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
70343
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1881–050]
PPL Holtwood, LLC, Pennsylvania;
Notice of Availability of the Final
Environmental Impact Statement for
the Holtwood Project
November 14, 2008.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the capacity
related amendment application for PPL
Holtwood LLC’s 107.2-megawatt
Holtwood Hydroelectric Project (Project
No. 1881), located on the Susquehanna
River in the counties of Lancaster and
York, Pennsylvania. Based upon this
review, the Office of Energy Projects has
prepared a Final Environmental Impact
Statement (final EIS) for the project.
The final EIS contains staff’s
evaluation of the applicant’s proposal
and alternatives. The proposal is for the
construction of a new powerhouse,
installation of turbines, construction of
a new skimmer wall, enlargement of the
forebay, and reconfiguration of the
project facilities to enhance upstream
fish passage through modifications of
the existing fishway and excavation in
the tailrace channel. The installed
capacity would increase by
approximately 80 MW. Additionally,
PPL Holtwood LLC requested a 16-year
extension of the current license term
until August 31, 2030. The final EIS
documents the views of governmental
agencies, non-governmental
organizations, affected Indian tribes, the
public, and Commission staff.
A copy of the final EIS is available for
review in the Commission’s Public
Reference Branch, Room 2A, located at
888 First Street, NE., Washington, DC
20426. The final EIS also may be viewed
on the Commission’s Web site at https://
www.ferc.gov under the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
E:\FR\FM\20NON1.SGM
20NON1
70344
Federal Register / Vol. 73, No. 225 / Thursday, November 20, 2008 / Notices
For assistance, contact FERC Online
Support.
For Further Information Contact:
Blake Condo at (202) 502–8914 or
blake.condo@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–27565 Filed 11–19–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2677–019]
City of Kaukauna, WI; Notice of Staff
Participation in Meeting
November 14, 2008.
On December 1, 2008, Office of
Energy Projects staff will participate by
teleconference in a work group meeting
to discuss information needs for an
assessment of recreational boating flows
in the bypassed reach of the Badger
Development for the relicensing of the
Badger-Rapide Croche Hydroelectric
Project (FERC No. 2677–019). The
meeting will begin at 1 p.m. CST.
For parties wishing to participate in
the teleconference, the call-in number is
608–443–0390 (PIN# 7608). For further
information please contact Arie DeWaal,
Project Manager, Mead & Hunt, Inc., at
(608) 273–6380, or e-mail at
arie.dewaal@meadhunt.com, or John
Smith, FERC, at (202) 502–8972, or email at john.smith@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–27567 Filed 11–19–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. OA08–62–000; ER08–1113–
000]
California Independent System
Operator Corporation; Notice of FERC
Staff Attendance
rwilkins on PROD1PC63 with NOTICES
November 14, 2008.
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that on the following dates
members of its staff will attend
stakeholder meetings of the California
Independent System Operator (CAISO).
Unless otherwise noted, these meetings
will be held at the CAISO, 151 Blue
Ravine Road, Folsom, CA or by
teleconference. The agenda and other
VerDate Aug<31>2005
18:26 Nov 19, 2008
Jkt 217001
DEPARTMENT OF ENERGY
with Internet access who desires to view
this event can do so by navigating to the
Calendar of Events at https://
www.ferc.gov and locating this event in
the Calendar. The event will contain a
link to its Webcast. The Capitol
Connection provides technical support
for the free Webcasts. It also offers
access to this event via television in the
Washington, DC area and via phonebridge for a fee. If you have any
questions, visit https://
www.CapitolConnection.org and click
on ‘‘FERC’’ or call (703) 993–3100.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations please
send an e-mail to accessibility@ferc.gov
or call toll free 866–208–3372 (voice) or
202–208–1659 (TTY), or send a FAX to
202–208–2106 with the required
accommodations.
Questions about the conference
should be directed to Raymond James
by phone at 202–502–8588 or by e-mail
at raymond.james@ferc.gov.
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E8–27570 Filed 11–19–08; 8:45 am]
[Docket No. AD08–12–000]
BILLING CODE 6717–01–P
State of the Natural Gas Infrastructure
Conference; Supplemental Notice of
Commission Conference
ENVIRONMENTAL PROTECTION
AGENCY
November 14, 2008.
[FRL–8742–4]
documents for the meetings are
available on the CAISO’s Web site,
https://www.caiso.com.
November 19, 2008: Integrated
Balancing Authority Area compliance
filing.
November 20, 2008: CAISO 2009
Transmission Plan.
Sponsored by the CAISO, these
meetings are open to all market
participants, and staff’s attendance is
part of the Commission’s ongoing
outreach efforts. The meetings may
discuss matters at issue in the above
captioned dockets.
For further information, contact Saeed
Farrokhpay at
saeed.farrokhpay@ferc.gov; (916) 294–
0233 or Maury Kruth at
maury.kruth@ferc.gov; (916) 294–0275.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–27564 Filed 11–19–08; 8:45 am]
BILLING CODE 6717–01–P
On October 7, 2008, the Federal
Energy Regulatory Commission
(Commission) issued a notice
announcing a conference in this
proceeding, to be held on November 21,
2008. As mentioned in that notice, the
focus of the conference is on natural gas
demand and supply issues as they relate
to the development of the domestic
natural gas industry and the effect upon
infrastructure. The Commission has
invited industry representatives to
provide perspectives and comments.
The agenda for the conference is
attached.
As noted in the October 7 Notice, the
conference will be held at the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426
in the Commission Meeting Room (2–C)
from 9:30 a.m. until 12:30 p.m. (Eastern
Standard Time). All interested parties
are invited, and there is no registration
required.
This conference will be transcribed.
Transcripts of the conference will be
immediately available from Ace
Reporting Company (202–347–3700 or
1–800–336–6646) for a fee. A free
Webcast of this event is available
through https://www.ferc.gov. Anyone
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
EPA Science Advisory Board Staff
Office; Notification of a Public
Teleconference Meeting of the
Chartered Science Advisory Board
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: The EPA Science Advisory
Board (SAB) Staff Office announces two
public teleconference meetings of the
chartered SAB to: (1) Conduct its quality
review of several draft SAB reports, and
(2) to receive a briefing from EPA on
biofuels.
The meeting dates are Tuesday,
December 9, 2008, from 1 p.m. to 3 p.m.
(Eastern Time) and Tuesday, December
16, 2008, from 11 a.m. to 12 p.m.
(Eastern Time).
Location: The meeting will be
conducted by telephone only.
FOR FURTHER INFORMATION CONTACT: Any
member of the public wishing to obtain
general information concerning this
public teleconference meeting should
contact Mr. Thomas Miller, Designated
Federal Officer (DFO), EPA Science
Advisory Board (1400F), 1200
DATES:
E:\FR\FM\20NON1.SGM
20NON1
Agencies
[Federal Register Volume 73, Number 225 (Thursday, November 20, 2008)]
[Notices]
[Pages 70343-70344]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-27565]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1881-050]
PPL Holtwood, LLC, Pennsylvania; Notice of Availability of the
Final Environmental Impact Statement for the Holtwood Project
November 14, 2008.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects has reviewed the capacity related amendment
application for PPL Holtwood LLC's 107.2-megawatt Holtwood
Hydroelectric Project (Project No. 1881), located on the Susquehanna
River in the counties of Lancaster and York, Pennsylvania. Based upon
this review, the Office of Energy Projects has prepared a Final
Environmental Impact Statement (final EIS) for the project.
The final EIS contains staff's evaluation of the applicant's
proposal and alternatives. The proposal is for the construction of a
new powerhouse, installation of turbines, construction of a new skimmer
wall, enlargement of the forebay, and reconfiguration of the project
facilities to enhance upstream fish passage through modifications of
the existing fishway and excavation in the tailrace channel. The
installed capacity would increase by approximately 80 MW. Additionally,
PPL Holtwood LLC requested a 16-year extension of the current license
term until August 31, 2030. The final EIS documents the views of
governmental agencies, non-governmental organizations, affected Indian
tribes, the public, and Commission staff.
A copy of the final EIS is available for review in the Commission's
Public Reference Branch, Room 2A, located at 888 First Street, NE.,
Washington, DC 20426. The final EIS also may be viewed on the
Commission's Web site at https://www.ferc.gov under the eLibrary link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, contact FERC
Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-
3676, or for TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects.
[[Page 70344]]
For assistance, contact FERC Online Support.
For Further Information Contact: Blake Condo at (202) 502-8914 or
blake.condo@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-27565 Filed 11-19-08; 8:45 am]