Commission Information Collection Activities, Proposed Collection; Comment Request; Extension, 70339-70340 [E8-27563]
Download as PDF
rwilkins on PROD1PC63 with NOTICES
Federal Register / Vol. 73, No. 225 / Thursday, November 20, 2008 / Notices
electric energy purchased from electric
utilities and other suppliers within the
U.S. and export the energy on its own
behalf to Canada. NB Power has
requested an electricity export
authorization with a 5-year term. NB
Power does not own or control any
electric generation, transmission, or
distribution assets, nor does it have a
franchised service area. The electric
energy which NB Power proposes to
export to Canada would be surplus
energy purchased from electric utilities,
Federal power marketing agencies, and
other entities within the United States.
NB Power will arrange for the
delivery of exports to Canada over the
international transmission facilities
owned by Basin Electric Power
Cooperative, Bonneville Power
Administration, Eastern Maine Electric
Cooperative, International Transmission
Co., Joint Owners of the Highgate
Project, Long Sault, Inc., Maine Electric
Power Company, Maine Public Service
Company, Minnesota Power, Inc.,
Minnkota Power Cooperative, Inc., New
York Power Authority, Niagara Mohawk
Power Corp., Northern States Power
Company, Vermont Electric Power
Company, and Vermont Electric
Transmission Co.
The construction, operation,
maintenance, and connection of each of
the international transmission facilities
to be utilized by NB Power has
previously been authorized by a
Presidential permit issued pursuant to
Executive Order 10485, as amended.
NB Power has recently been granted
market-based rate authority by the
Federal Energy Regulatory Commission
and is scheduled to become a member
of ISO New England on December 1,
2008. Accordingly, NB Power has
requested expedited consideration of its
export application in order that it may
participate in the ISO New England
market as soon as its membership in ISO
New England becomes effective. In
response to NB Power’s request, DOE
has shortened the public comment
period to 15 days.
Procedural Matters: Any person
desiring to become a party to these
proceedings or to be heard by filing
comments or protests to this application
should file a petition to intervene,
comment, or protest at the address
provided above in accordance with
§§ 385.211 or 385.214 of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedures (18 CFR
385.211, 385.214). Fifteen copies of each
petition and protest should be filed with
DOE on or before the date listed above.
Comments on the NB Power
application to export electric energy to
Canada should be clearly marked with
VerDate Aug<31>2005
18:26 Nov 19, 2008
Jkt 217001
Docket No. EA–345. Additional copies
are to be filed directly with Bonnie A.
Suchman, Troutman Sanders LLP, 401
9th Street, NW., Suite 1000,
Washington, DC 20004.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to the National Environmental Policy
Act of 1969 and a determination is made
by DOE that the proposed action will
not adversely impact the reliability of
the U.S. electric power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://
www.oe.energy.gov/
permits_pending.htm, or by e-mailing
Odessa Hopkins at
Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on November
14, 2008.
Anthony J. Como,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. E8–27590 Filed 11–19–08; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[IC09–598–000, FERC–598]
Commission Information Collection
Activities, Proposed Collection;
Comment Request; Extension
November 14, 2008.
Federal Energy Regulatory
Commission, DOE.
ACTION: Notice.
AGENCY:
SUMMARY: In compliance with the
requirements of section 3507 of the
Paperwork Reduction Act of 1995, 44
U.S.C. 3507, the Federal Energy
Regulatory Commission (Commission) is
soliciting public comment on the
specific aspects of the information
collection described below.
DATES: Comments on the information
collection are due by January 22, 2009.
ADDRESSES: An example of this
information collection may be obtained
from the Commission’s Web site
(https://www.ferc.gov/docs-filings/
elibrary.asp) under the ‘‘EG’’ or ‘‘FC’’
docket prefix heading. Comments may
be filed either electronically or in paper
format. Those parties filing
electronically do not need to make a
paper filing. For a paper filing an
original and 14 copies of such
comments should be submitted to the
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
70339
Secretary of the Commission, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
and both the electronic and paper filings
should refer to Docket No. IC09–598–
000.
Documents filed electronically via the
Internet must be prepared in an
acceptable filing format and in
compliance with the Commission’s
submission guidelines. Complete filing
instructions and acceptable filing
formats are available at https://
www.ferc.gov/help/submissionguide.asp. To file the document, access
the Commission’s Web site at https://
www.ferc.gov, choose the Documents &
Filings tab, click on E-Filing (https://
www:ferc.gov/docs-filing/efiling.asp),
and then follow the instructions for
each screen. First time users will have
to establish a user name and password
(https://www.ferc.gov/docs-filing/
eregistration.asp). The Commission will
send an automatic acknowledgement to
the sender’s e-mail address upon receipt
of comments.
All comments may be viewed, printed
or downloaded remotely via the Internet
through the Commission’s homepage
using the eLibrary link. For user
assistance, contact FERC Online
Support (e-mail
ferconlinesupport@ferc.gov or call toll
free at (866) 208–3676 or for TTY,
contact (202) 502–8659. In addition,
users interested in tracking the docket
activity, may do so through
eSubscription (https://www.ferc.gov/
docs-filing/esubscription.asp).
FOR FURTHER INFORMATION CONTACT:
Michael Miller, Federal Energy
Regulatory Commission, 888 First St.,
NE., Washington, DC 20426. He may be
reached by telephone at (202) 502–8415,
by fax at (202) 273–0873, and by e-mail
at michael.miller@ferc.gov.
SUPPLEMENTARY INFORMATION: The
information collected under the
requirements of FERC–598 ‘‘Self
Certification for Entities Seeking
Exempt Wholesale Generator or Foreign
Utility Company Status’’ (OMB Control
No. 1902–0166) is used by the
Commission to implement the statutory
provisions of Title XII, subchapter F of
the Energy Policy Act of 2005 (EPAct
2005).1
EPAct 2005 repealed the Public
Utility Holding Company Act of 1935
(PUHCA 1935) in its entirety, including
section 32, which provided for the
Commission to exempt wholesale
generators from PUHCA 1935 on a caseby-case basis, upon application.
1 Energy Policy Act of 2005, Pub. L. No. 109–58,
119 Stat. 594 (2005) (codified at 42 U.S.C. 16451,
et seq.).
E:\FR\FM\20NON1.SGM
20NON1
70340
Federal Register / Vol. 73, No. 225 / Thursday, November 20, 2008 / Notices
Following the repeal of PUHCA 1935
and the enactment of PUHCA 2005, in
Order No. 667 2 the Commission
amended its regulations to add
procedures for self-certification by
entities seeking exempt wholesale
generator (EWG) and foreign utility
company (FUCO) status. This selfcertification is similar to the process
available to entities that seek qualifying
facility status.
An EWG is a ‘‘person engaged directly
or indirectly through one or more
affiliates, and exclusively in the
business of owning or operating, or both
owning and operating, all or part of one
or more eligible facilities and selling
electric energy at wholesale.’’ 3 A FUCO
is a company that ‘‘owns or operates
facilities that are not located in any state
and that are used for the generation,
transmission, or distribution of electric
energy for sale or the distribution at
retail of natural or manufactured gas for
heat, light, or power, if such company:
(1) Derives no part of its income,
directly or indirectly, from the
generation, transmission, or distribution
of electric energy for sale or the
distribution at retail of natural or
manufactured gas for heat, light, or
power, within the United States; and (2)
neither the company nor any of its
subsidiary companies is a public-utility
company operating in the United
States’’.4
An exempt EWG or FUCO or its
representative may file with the
Commission a notice of self certification
demonstrating that it satisfies the
definition of exempt wholesale
generator or foreign utility company. In
the case of EWGs, the person filing a
notice of self certification must also file
a copy of the notice of self certification
with the state regulatory authority of the
state in which the facility is located and
that person must also represent to the
Commission in its submission that it has
filed a copy of the notice with the
appropriate state regulatory authority.5
A submission of the information is
necessary for the Commission to carry
out its responsibilities under EPAct
2005.6 The Commission implements its
responsibilities through the Code of
Federal Regulations 18 CFR Part 366.
These filing requirements are
mandatory.
Action: The Commission is requesting
a three-year extension of the current
expiration date without any changes to
the reporting requirements.
Burden Statement: Public reporting
burden for this collection is estimated
as:
Number of
responses per
respondent
Average
burden
hours per
response
Total annual
burden hours
(1)
(2)
(3)
(1)x(2)x(3)
199 ...............................................................................................................................................
rwilkins on PROD1PC63 with NOTICES
Number of
respondents annually
1
6
1,194
The estimated total cost to
respondents is $72,549 [1,194 hours ÷
2080 7 hours per year × $126,384 8 per
year = $72,549]. The cost per
respondent is equal to $364.
The reporting burden includes the
total time, effort, or financial resources
expended to generate, maintain, retain,
disclose, or provide the information
including: (1) Reviewing instructions;
(2) developing, acquiring, installing, and
utilizing technology and systems for the
purposes of collecting, validating,
verifying, processing, maintaining,
disclosing and providing information;
(3) training personnel to respond to an
information collection; (4) searching
data sources; (5) preparing and
reviewing the information collection;
and (6) transmitting or otherwise
disclosing the information.
The estimate of cost for respondents
is based upon salaries for professional
and clerical support, as well as direct
and indirect or overhead costs. Direct
costs include all costs directly
attributable to providing this
information, such as administrative
costs and the cost for information
technology. Indirect or overhead costs
are costs incurred by an organization in
support of its mission. These costs
apply to activities which benefit the
whole organization rather than any one
particular function or activity.
Comments are invited on: (1) Whether
the proposed collection of information
is necessary for the proper performance
of the functions of the Commission,
including whether the information will
have practical utility; (2) the accuracy of
the agency’s estimate of the burden of
the proposed collection of information,
including the validity of the
methodology and assumptions used; (3)
ways to enhance the quality, utility and
clarity of the information to be
collected; and (4) ways to minimize the
burden of the collection of information
on those who are to respond, including
the use of appropriate automated,
electronic, mechanical, or other
2 Repeal of the Public Utility Holding Company
Act of 1935 and Enactment of the Public Utility
Holding Company Act of 2005, 70 FR 75,592 (2005),
FERC Statutes and Regulations ¶ 31,197 (2005),
order on reh’g, 71 FR 28,446 (2006), FERC Statutes
and Regulations ¶ 31,213 (2006), order on reh’g, 71
FR 42,750 (2006), FERC Statutes and Regulations
¶ 31,224 (2006), order on reh’g, FERC ¶ 61,133
(2007).
3 18 CFR 366.1.
VerDate Aug<31>2005
18:26 Nov 19, 2008
Jkt 217001
technological collection techniques or
other forms of information technology.
Kimberly Bose,
Secretary.
[FR Doc. E8–27563 Filed 11–19–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2242–078]
Eugene Water and Electric Board;
Notice of Settlement Agreement and
Soliciting Comments, Application
Ready for Environmental Analysis and
Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions, and
Revised Schedule for Environmental
Assessment
November 14, 2008.
Take notice that the following
hydroelectric application has been filed
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
4 18
CFR 366.1.
CFR 366.7.
6 42 U.S.C. 16451 et seq.
7 Number of hours an employee works per year.
8 Average annual salary per employee.
5 18
E:\FR\FM\20NON1.SGM
20NON1
Agencies
[Federal Register Volume 73, Number 225 (Thursday, November 20, 2008)]
[Notices]
[Pages 70339-70340]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-27563]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[IC09-598-000, FERC-598]
Commission Information Collection Activities, Proposed
Collection; Comment Request; Extension
November 14, 2008.
AGENCY: Federal Energy Regulatory Commission, DOE.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of section 3507 of the
Paperwork Reduction Act of 1995, 44 U.S.C. 3507, the Federal Energy
Regulatory Commission (Commission) is soliciting public comment on the
specific aspects of the information collection described below.
DATES: Comments on the information collection are due by January 22,
2009.
ADDRESSES: An example of this information collection may be obtained
from the Commission's Web site (https://www.ferc.gov/docs-filings/
elibrary.asp) under the ``EG'' or ``FC'' docket prefix heading.
Comments may be filed either electronically or in paper format. Those
parties filing electronically do not need to make a paper filing. For a
paper filing an original and 14 copies of such comments should be
submitted to the Secretary of the Commission, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426, and both the
electronic and paper filings should refer to Docket No. IC09-598-000.
Documents filed electronically via the Internet must be prepared in
an acceptable filing format and in compliance with the Commission's
submission guidelines. Complete filing instructions and acceptable
filing formats are available at https://www.ferc.gov/help/submission-
guide.asp. To file the document, access the Commission's Web site at
https://www.ferc.gov, choose the Documents & Filings tab, click on E-
Filing (https://www:ferc.gov/docs-filing/efiling.asp), and then follow
the instructions for each screen. First time users will have to
establish a user name and password (https://www.ferc.gov/docs-filing/
eregistration.asp). The Commission will send an automatic
acknowledgement to the sender's e-mail address upon receipt of
comments.
All comments may be viewed, printed or downloaded remotely via the
Internet through the Commission's homepage using the eLibrary link. For
user assistance, contact FERC Online Support (e-mail
ferconlinesupport@ferc.gov or call toll free at (866) 208-3676 or for
TTY, contact (202) 502-8659. In addition, users interested in tracking
the docket activity, may do so through eSubscription (https://
www.ferc.gov/docs-filing/esubscription.asp).
FOR FURTHER INFORMATION CONTACT: Michael Miller, Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426. He may
be reached by telephone at (202) 502-8415, by fax at (202) 273-0873,
and by e-mail at michael.miller@ferc.gov.
SUPPLEMENTARY INFORMATION: The information collected under the
requirements of FERC-598 ``Self Certification for Entities Seeking
Exempt Wholesale Generator or Foreign Utility Company Status'' (OMB
Control No. 1902-0166) is used by the Commission to implement the
statutory provisions of Title XII, subchapter F of the Energy Policy
Act of 2005 (EPAct 2005).\1\
---------------------------------------------------------------------------
\1\ Energy Policy Act of 2005, Pub. L. No. 109-58, 119 Stat. 594
(2005) (codified at 42 U.S.C. 16451, et seq.).
---------------------------------------------------------------------------
EPAct 2005 repealed the Public Utility Holding Company Act of 1935
(PUHCA 1935) in its entirety, including section 32, which provided for
the Commission to exempt wholesale generators from PUHCA 1935 on a
case-by-case basis, upon application.
[[Page 70340]]
Following the repeal of PUHCA 1935 and the enactment of PUHCA 2005, in
Order No. 667 \2\ the Commission amended its regulations to add
procedures for self-certification by entities seeking exempt wholesale
generator (EWG) and foreign utility company (FUCO) status. This self-
certification is similar to the process available to entities that seek
qualifying facility status.
---------------------------------------------------------------------------
\2\ Repeal of the Public Utility Holding Company Act of 1935 and
Enactment of the Public Utility Holding Company Act of 2005, 70 FR
75,592 (2005), FERC Statutes and Regulations ] 31,197 (2005), order
on reh'g, 71 FR 28,446 (2006), FERC Statutes and Regulations ]
31,213 (2006), order on reh'g, 71 FR 42,750 (2006), FERC Statutes
and Regulations ] 31,224 (2006), order on reh'g, FERC ] 61,133
(2007).
---------------------------------------------------------------------------
An EWG is a ``person engaged directly or indirectly through one or
more affiliates, and exclusively in the business of owning or
operating, or both owning and operating, all or part of one or more
eligible facilities and selling electric energy at wholesale.'' \3\ A
FUCO is a company that ``owns or operates facilities that are not
located in any state and that are used for the generation,
transmission, or distribution of electric energy for sale or the
distribution at retail of natural or manufactured gas for heat, light,
or power, if such company: (1) Derives no part of its income, directly
or indirectly, from the generation, transmission, or distribution of
electric energy for sale or the distribution at retail of natural or
manufactured gas for heat, light, or power, within the United States;
and (2) neither the company nor any of its subsidiary companies is a
public-utility company operating in the United States''.\4\
---------------------------------------------------------------------------
\3\ 18 CFR 366.1.
\4\ 18 CFR 366.1.
---------------------------------------------------------------------------
An exempt EWG or FUCO or its representative may file with the
Commission a notice of self certification demonstrating that it
satisfies the definition of exempt wholesale generator or foreign
utility company. In the case of EWGs, the person filing a notice of
self certification must also file a copy of the notice of self
certification with the state regulatory authority of the state in which
the facility is located and that person must also represent to the
Commission in its submission that it has filed a copy of the notice
with the appropriate state regulatory authority.\5\
---------------------------------------------------------------------------
\5\ 18 CFR 366.7.
---------------------------------------------------------------------------
A submission of the information is necessary for the Commission to
carry out its responsibilities under EPAct 2005.\6\ The Commission
implements its responsibilities through the Code of Federal Regulations
18 CFR Part 366. These filing requirements are mandatory.
---------------------------------------------------------------------------
\6\ 42 U.S.C. 16451 et seq.
---------------------------------------------------------------------------
Action: The Commission is requesting a three-year extension of the
current expiration date without any changes to the reporting
requirements.
Burden Statement: Public reporting burden for this collection is
estimated as:
----------------------------------------------------------------------------------------------------------------
Number of Average burden
Number of respondents annually responses per hours per Total annual
respondent response burden hours
(1) (2) (3) (1)x(2)x(3)
----------------------------------------------------------------------------------------------------------------
199.......................................................... 1 6 1,194
----------------------------------------------------------------------------------------------------------------
The estimated total cost to respondents is $72,549 [1,194 hours /
2080 \7\ hours per year x $126,384 \8\ per year = $72,549]. The cost
per respondent is equal to $364.
---------------------------------------------------------------------------
\7\ Number of hours an employee works per year.
\8\ Average annual salary per employee.
---------------------------------------------------------------------------
The reporting burden includes the total time, effort, or financial
resources expended to generate, maintain, retain, disclose, or provide
the information including: (1) Reviewing instructions; (2) developing,
acquiring, installing, and utilizing technology and systems for the
purposes of collecting, validating, verifying, processing, maintaining,
disclosing and providing information; (3) training personnel to respond
to an information collection; (4) searching data sources; (5) preparing
and reviewing the information collection; and (6) transmitting or
otherwise disclosing the information.
The estimate of cost for respondents is based upon salaries for
professional and clerical support, as well as direct and indirect or
overhead costs. Direct costs include all costs directly attributable to
providing this information, such as administrative costs and the cost
for information technology. Indirect or overhead costs are costs
incurred by an organization in support of its mission. These costs
apply to activities which benefit the whole organization rather than
any one particular function or activity.
Comments are invited on: (1) Whether the proposed collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimate of the burden of the
proposed collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information to be collected; and (4) ways to
minimize the burden of the collection of information on those who are
to respond, including the use of appropriate automated, electronic,
mechanical, or other technological collection techniques or other forms
of information technology.
Kimberly Bose,
Secretary.