Dominion Transmission, Inc.; Notice of Application, 69620 [E8-27412]

Download as PDF 69620 Federal Register / Vol. 73, No. 224 / Wednesday, November 19, 2008 / Notices (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13295) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3372. Kimberly D. Bose, Secretary. [FR Doc. E8–27414 Filed 11–18–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09–18–000] Dominion Transmission, Inc.; Notice of Application cprice-sewell on PROD1PC64 with NOTICES November 13, 2008. Take notice that on October 31, 2008, Dominion Transmission, Inc. (DTI), 120 Tredegar Street, Richmond, VA 23219, filed an application in Docket No. CP09–18–000, pursuant to section 7(c) of the Natural Gas Act (NGA) and Part 157 of the Commission’s regulations, for a certificate of public convenience and necessity to construct, install, own, operate and maintain 9.42 miles of 24inch-diameter loop pipeline in Greene County, Pennsylvania and a rewheel of an existing compressor station turbine in Wetzal County, West Virginia (Dominion Hub III Project). The project will allow existing DTI firm transportation customers to move a total 224,317 Dth per day of their existing firm receipt rights to the planned interconnection with Rockies Express Pipeline LLC in Clarington, Ohio. DTI proposes to charge shippers using the new Clarington receipt point an VerDate Aug<31>2005 15:14 Nov 18, 2008 Jkt 217001 incremental surcharge in addition to their existing firm transportation rates. Any questions regarding this application should be directed to Matthew R. Bley, Manager, Gas Transmission Certificates, Dominion Transmission, Inc., 120 Tredegar Street, Richmond, VA 23219, telephone no. (804) 819–2877, facsimile no. (804) 819– 2064 and e-mail: Matthew.R.Bley@dom.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: December 4, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–27412 Filed 11–18–08; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\19NON1.SGM 19NON1

Agencies

[Federal Register Volume 73, Number 224 (Wednesday, November 19, 2008)]
[Notices]
[Page 69620]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-27412]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP09-18-000]


Dominion Transmission, Inc.; Notice of Application

November 13, 2008.
    Take notice that on October 31, 2008, Dominion Transmission, Inc. 
(DTI), 120 Tredegar Street, Richmond, VA 23219, filed an application in 
Docket No. CP09-18-000, pursuant to section 7(c) of the Natural Gas Act 
(NGA) and Part 157 of the Commission's regulations, for a certificate 
of public convenience and necessity to construct, install, own, operate 
and maintain 9.42 miles of 24-inch-diameter loop pipeline in Greene 
County, Pennsylvania and a rewheel of an existing compressor station 
turbine in Wetzal County, West Virginia (Dominion Hub III Project). The 
project will allow existing DTI firm transportation customers to move a 
total 224,317 Dth per day of their existing firm receipt rights to the 
planned interconnection with Rockies Express Pipeline LLC in 
Clarington, Ohio. DTI proposes to charge shippers using the new 
Clarington receipt point an incremental surcharge in addition to their 
existing firm transportation rates.
    Any questions regarding this application should be directed to 
Matthew R. Bley, Manager, Gas Transmission Certificates, Dominion 
Transmission, Inc., 120 Tredegar Street, Richmond, VA 23219, telephone 
no. (804) 819-2877, facsimile no. (804) 819-2064 and e-mail: 
Matthew.R.Bley@dom.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either complete 
its environmental assessment (EA) and place it into the Commission's 
public record (eLibrary) for this proceeding; or issue a Notice of 
Schedule for Environmental Review. If a Notice of Schedule for 
Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 14 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Comment Date: December 4, 2008.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-27412 Filed 11-18-08; 8:45 am]