Dominion Transmission, Inc.; Notice of Application, 69620 [E8-27412]
Download as PDF
69620
Federal Register / Vol. 73, No. 224 / Wednesday, November 19, 2008 / Notices
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13295) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–27414 Filed 11–18–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–18–000]
Dominion Transmission, Inc.; Notice of
Application
cprice-sewell on PROD1PC64 with NOTICES
November 13, 2008.
Take notice that on October 31, 2008,
Dominion Transmission, Inc. (DTI), 120
Tredegar Street, Richmond, VA 23219,
filed an application in Docket No.
CP09–18–000, pursuant to section 7(c)
of the Natural Gas Act (NGA) and Part
157 of the Commission’s regulations, for
a certificate of public convenience and
necessity to construct, install, own,
operate and maintain 9.42 miles of 24inch-diameter loop pipeline in Greene
County, Pennsylvania and a rewheel of
an existing compressor station turbine
in Wetzal County, West Virginia
(Dominion Hub III Project). The project
will allow existing DTI firm
transportation customers to move a total
224,317 Dth per day of their existing
firm receipt rights to the planned
interconnection with Rockies Express
Pipeline LLC in Clarington, Ohio. DTI
proposes to charge shippers using the
new Clarington receipt point an
VerDate Aug<31>2005
15:14 Nov 18, 2008
Jkt 217001
incremental surcharge in addition to
their existing firm transportation rates.
Any questions regarding this
application should be directed to
Matthew R. Bley, Manager, Gas
Transmission Certificates, Dominion
Transmission, Inc., 120 Tredegar Street,
Richmond, VA 23219, telephone no.
(804) 819–2877, facsimile no. (804) 819–
2064 and e-mail:
Matthew.R.Bley@dom.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: December 4, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–27412 Filed 11–18–08; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\19NON1.SGM
19NON1
Agencies
[Federal Register Volume 73, Number 224 (Wednesday, November 19, 2008)]
[Notices]
[Page 69620]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-27412]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP09-18-000]
Dominion Transmission, Inc.; Notice of Application
November 13, 2008.
Take notice that on October 31, 2008, Dominion Transmission, Inc.
(DTI), 120 Tredegar Street, Richmond, VA 23219, filed an application in
Docket No. CP09-18-000, pursuant to section 7(c) of the Natural Gas Act
(NGA) and Part 157 of the Commission's regulations, for a certificate
of public convenience and necessity to construct, install, own, operate
and maintain 9.42 miles of 24-inch-diameter loop pipeline in Greene
County, Pennsylvania and a rewheel of an existing compressor station
turbine in Wetzal County, West Virginia (Dominion Hub III Project). The
project will allow existing DTI firm transportation customers to move a
total 224,317 Dth per day of their existing firm receipt rights to the
planned interconnection with Rockies Express Pipeline LLC in
Clarington, Ohio. DTI proposes to charge shippers using the new
Clarington receipt point an incremental surcharge in addition to their
existing firm transportation rates.
Any questions regarding this application should be directed to
Matthew R. Bley, Manager, Gas Transmission Certificates, Dominion
Transmission, Inc., 120 Tredegar Street, Richmond, VA 23219, telephone
no. (804) 819-2877, facsimile no. (804) 819-2064 and e-mail:
Matthew.R.Bley@dom.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either complete
its environmental assessment (EA) and place it into the Commission's
public record (eLibrary) for this proceeding; or issue a Notice of
Schedule for Environmental Review. If a Notice of Schedule for
Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 14 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: December 4, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-27412 Filed 11-18-08; 8:45 am]
BILLING CODE 6717-01-P