[FFP Missouri 26, LLC, Project No. 13207–
000, FFP Missouri 27, LLC, Project No.
13208–000]
Notice of Preliminary Permit
Applications Accepted for Filing and
Soliciting Comment, Motions To
Intervene, and Competing Applications
cprice-sewell on PROD1PC64 with NOTICES
November 12, 2008.
On April 15, 2008, FFP Missouri 26,
LLC and FFP Missouri 27, LLC each
filed an application, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Missouri
26 and Missouri 27 Projects, to be
located on the Missouri River in Clay
and Jackson Counties, Missouri.
The proposed Missouri 26 Project
consists of: (1) 3,720 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 97.2
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Missouri 26, LLC, project would
have an average annual generation of
74.4 gigawatt-hours and be sold to a
local utility.
The proposed Missouri 27 Project
consists of: (1) 7,860 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 157.2
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Missouri 27, LLC, project would
have an average annual generation of
688.54 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP
Missouri 26, LLC and FFP Missouri 27,
LLC, 69 Bridge Street, Manchester, MA
01944, phone (978) 232–3536.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
VerDate Aug<31>2005
15:14 Nov 18, 2008
Jkt 217001
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13207 or P–
13208) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–27374 Filed 11–18–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2354–103]
Georgia Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
a. Type of Application: Non-project
use of project lands and waters.
b. Project Number: 2354–103.
c. Date Filed: October 24, 2008.
d. Applicant: Georgia Power
Company.
e. Name of Project: North Georgia
Hydroelectric Project.
f. Location: The LaPrades Marina is
located in the Wildcat Creek cove on
Lake Burton in Rabun County, Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a) 825(r) and § 799
and 801.
h. Applicant Contact: Ms. Wanda
Greene, Compliance & Forestry
Manager, Georgia Power Company,
telephone: (404) 506–2392.
i. FERC Contact: Any questions on
this notice should be addressed to
Christopher Yeakel at (202) 502–8132,
or e-mail address:
christopher.yeakel@ferc.gov.
j. Deadline for filing comments and/
or motions: December 12, 2008.
k. Description of Request: Georgia
Power Company requests approval to
permit Vinings Marine Group, LLC, to:
(1) Remove two existing docks with a
total capacity of 62 watercraft; (2)
remove 7 existing boathouses; (3)
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
construct four new covered boat docks
with a total capacity of 140 watercraft;
(4) construct one new uncovered dock
with a capacity of 40 watercraft; and (5)
construct 16 new boathouses. The
existing boat ramp and two fuel docks
would remain. No dredging is proposed.
In developing the application, the
licensee consulted with the U.S. Fish
and Wildlife Service, the Georgia
Department of Natural Resources,
Wildlife Resources and Law
Enforcement Divisions, and the Georgia
State Historic Preservation Officer.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (p–2354) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via e-mail of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3372 or e-mail
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS,’’
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS,’’ ‘‘PROTEST,’’ OR
‘‘MOTION TO INTERVENE,’’ as
applicable, and the Project Number of
the particular application to which the
filing refers (p–2354–103). All
E:\FR\FM\19NON1.SGM
19NON1
Agencies
[Federal Register Volume 73, Number 224 (Wednesday, November 19, 2008)]
[Notices]
[Page 69624]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-27374]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[FFP Missouri 26, LLC, Project No. 13207-000, FFP Missouri 27, LLC,
Project No. 13208-000]
Notice of Preliminary Permit Applications Accepted for Filing and
Soliciting Comment, Motions To Intervene, and Competing Applications
November 12, 2008.
On April 15, 2008, FFP Missouri 26, LLC and FFP Missouri 27, LLC
each filed an application, pursuant to section 4(f) of the Federal
Power Act, proposing to study the feasibility of the Missouri 26 and
Missouri 27 Projects, to be located on the Missouri River in Clay and
Jackson Counties, Missouri.
The proposed Missouri 26 Project consists of: (1) 3,720 proposed 20
kilowatt Free Flow generating units having a total installed capacity
of 97.2 megawatts, (2) a proposed transmission line, and (3)
appurtenant facilities. The FFP Missouri 26, LLC, project would have an
average annual generation of 74.4 gigawatt-hours and be sold to a local
utility.
The proposed Missouri 27 Project consists of: (1) 7,860 proposed 20
kilowatt Free Flow generating units having a total installed capacity
of 157.2 megawatts, (2) a proposed transmission line, and (3)
appurtenant facilities. The FFP Missouri 27, LLC, project would have an
average annual generation of 688.54 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP Missouri 26, LLC and FFP
Missouri 27, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978)
232-3536.
FERC Contact: Robert Bell, (202) 502-6062.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13207
or P-13208) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-27374 Filed 11-18-08; 8:45 am]
BILLING CODE 6717-01-P