Sunshine Act Meeting Notice, 68427-68429 [E8-27410]

Download as PDF Federal Register / Vol. 73, No. 223 / Tuesday, November 18, 2008 / Notices Applicants: Kern River Gas Transmission Company. Description: Kern River Gas Transmission Company submits a refund report detailing refunds paid on October 1, 2008, and October 3, 2008, pursuant to the Settlement filed September 30, 2008, in accordance with 18 CFR 154.501(e). Filed Date: 10/31/2008. Accession Number: 20081031–5153. Comment Date: 5 p.m. Eastern Time on Wednesday, November 12, 2008. Docket Numbers: RP09–55–000. Applicants: Midwestern Gas Transmission Company. Description: Midwestern Gas Transmission Co submits its cashout report for September 2007 through August 2008. Filed Date: 11/05/2008. Accession Number: 20081106–0104. Comment Date: 5 p.m. Eastern Time on Monday, November 17, 2008. Docket Numbers: RP09–56–000. Applicants: Algonquin Gas Transmission Company. Description: Algonquin Gas Transmission, LLC submits its Fifth Revised Sheet 507 to FERC Gas Tariff, Fifth Revised Volume 1. Filed Date: 11/05/2008. Accession Number: 20081106–0103. Comment Date: 5 p.m. Eastern Time on Monday, November 17, 2008. Docket Numbers: RP09–57–000. Applicants: Texas Eastern Transmission LP. Description: Texas Eastern Transmission, LP submits Twenty-Ninth Revised Sheet 25 et al. to FERC Gas Tariff, Seventh Revised Volume 1 and First Revised Volume 2 under RP09–57. Filed Date: 11/03/2008. Accession Number: 20081107–0003. Comment Date: 5 p.m. Eastern Time on Monday, November 17, 2008. Docket Numbers: RP09–58–000. Applicants: CenterPoint Energy Gas Transmission Co. Description: CenterPoint Energy Gas Transmission Co submits its ‘‘Annual Report of Penalty Revenue Credits’’ covering activity during period ended 7/31/08. Filed Date: 11/06/2008. Accession Number: 20081107–0002. Comment Date: 5 p.m. Eastern Time on Tuesday, November 18, 2008. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E8–27332 Filed 11–17–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice November 13, 2008. The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: Federal Energy Regulatory Commission. AGENCY HOLDING MEETING: DATE AND TIME: November 20, 2008. 10 a.m. Room 2C, 888 First Street, NE., Washington, DC 20426. PLACE: STATUS: Open. Agenda. * Note—Items listed on the agenda may be deleted without further notice. MATTERS TO BE CONSIDERED: CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 941st—Meeting REGULAR MEETING [November 20, 2008; 10 a.m.] Item No. Docket No. Company dwashington3 on PRODPC61 with NOTICES ADMINISTRATIVE A–1 ........... A–2 ........... A–3 ........... VerDate Aug<31>2005 AD02–1–000 ............................................... AD02–7–000 ............................................... AD06–3–000 ............................................... 14:36 Nov 17, 2008 Jkt 217001 PO 00000 Agency Administrative Matters. Customer Matters, Reliability, Security and Market Operations. Energy Market Update. Frm 00024 Fmt 4703 Sfmt 4703 68427 E:\FR\FM\18NON1.SGM 18NON1 68428 Federal Register / Vol. 73, No. 223 / Tuesday, November 18, 2008 / Notices REGULAR MEETING—Continued [November 20, 2008; 10 a.m.] Item No. Docket No. Company ELECTRIC E–1 ........... RM08–16–000 ............................................ E–2 E–3 E–4 E–5 ........... ........... ........... ........... RR08–4–001, RR08–4–002 ....................... OMITTED. RC08–7–000 ............................................... RM08–12–000 ............................................ E–6 E–7 E–8 E–9 ........... ........... ........... ........... RM05–35–000 ............................................ ER07–521–003, ER07–521–004 ................ ER08–1606–000 ......................................... EL00–95–164, EL00–95–200 ..................... EL00–98–184, EL00–98–185 ..................... E–10 ......... E–11 ......... E–12 ......... OMITTED. EL07–81–001 ............................................. ER05–6–089 ............................................... ER05–6–034. ER05–6–102. ER05–6–105. ER05–6–106. EL04–135–092 ........................................... EL04–135–110. EL04–135–105. EL04–135–108. EL04–135–109. EL02–111–109 ........................................... ......... ......... ......... ......... EL02–111–127. EL02–111–122. EL02–111–125. EL02–111–126. EL03–212–105 ........................................... EL03–212–123. EL03–212–118. EL03–212–121. EL03–212–122. OMITTED. ER08–1567–000 ......................................... OMITTED. EC08–124–000 ........................................... E–17 ......... E–18 ......... ER02–2001–009, ER07–559–000 .............. PL09–2–000 ............................................... E–19 ......... E–20 ......... E–21 ......... EC08–91–000, EC08–91–001 .................... ER08–209–001 ........................................... ER00–3251–015, ER00–3251–017 ............ ER99–754–016, ER99–754–017 ................ ER98–1734–014, ER98–1734–016 ............ ER01–1919–011, ER01–1919–013 ............ ER01–1147–006, ER01–1147–007 ............ ER01–513–021 ........................................... ER01–513–022 ........................................... dwashington3 on PRODPC61 with NOTICES E–13 E–14 E–15 E–16 E–22 ......... ER99–2404–011, ER99–2404–012 ............ ER08–412–002 ........................................... Electric Reliability Organization Interpretations of Frequency Response and Bias and Voltage and Reactive Control Reliability Standards. North American Electric Reliability Corporation. Constellation Energy Commodities Group, Inc. Western Electricity Coordinating Council Regional Reliability Standard Regarding Automatic Time Error Correction. Standard of Review for Modifications to Jurisdictional Agreements. New York Independent System Operator, Inc. ISO New England Inc. San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange Corporation. Investigation of Practices of the California Independent System Operator Corporation and the California Power Exchange Corporation. NSTAR Electric Company v. ISO New England Inc. Midwest Independent Transmission System Operator, Inc. Midwest Independent Transmission System Operator, Inc. and PJM Interconnection, L.L.C. Midwest Independent Transmission System Operator, Inc. and PJM Interconnection, L.L.C. Ameren Services Company. Southern California Edison Company. SUEZ Energy North America, Inc. SUEZ Bidco, LLC. Energy Capital Partners GP I, LLC. FirstLight Power Enterprises, Inc. Electric Quarterly Reports Flat Earth Energy, LLC. Material Changes in Facts that Require Notifications Under Commission Regulations Under the Public Utility Holding Company Act of 2005. Horizon Asset Management, Inc. Midwest Independent Transmission System Operator, Inc. Exelon Generation Company, LLC. AmerGen Energy Company, LLC. Commonwealth Edison Company. Exelon Energy Company. PEPCO Energy Company. Exelon West Medway, LLC. Exelon Wyman, LLC. Exelon New Boston, LLC. Exelon Framingham, LLC. Exelon New England Power Marketing, L.P. Commonwealth Edison Company and Exelon Generation Company, LLC. GAS G–1 G–2 G–3 G–4 .......... .......... .......... .......... VerDate Aug<31>2005 RM08–2–000 .............................................. RM08–1–001 .............................................. CP07–405–002 ........................................... IS05–82–004, IS05–82–005 ....................... 14:36 Nov 17, 2008 Jkt 217001 PO 00000 Pipeline Posting Requirements under Section 23 of the Natural Gas Act. Promotion of a More Efficient Capacity Release Market. Texas Gas Transmission, LLC. BP Pipelines (Alaska) Inc. Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\18NON1.SGM 18NON1 Federal Register / Vol. 73, No. 223 / Tuesday, November 18, 2008 / Notices 68429 REGULAR MEETING—Continued [November 20, 2008; 10 a.m.] Item No. Docket No. Company IS05–80–004, IS05–80–005 ....................... IS05–72–004, IS05–72–005 ....................... IS05–96–004, IS05–96–005 ....................... IS05–107–003, IS05–107–004 ................... OR05–2–003, OR05–2–004 ....................... G–5 .......... G–6 .......... G–7 .......... OR05–3–014, OR05–3–015 ....................... OR05–10–003, OR05–10–004 ................... IS06–70–002, IS06–70–003 ....................... IS06–71–002, IS06–71–003 ....................... IS06–63–002, IS06–63–003 ....................... IS06–82–002, IS06–82–003 ....................... IS06–66–002, IS06–66–003 ....................... OR06–2–002, OR06–2–003 ....................... RM09–2–000 .............................................. RP08–606–000 ........................................... RM07–20–000 ............................................ ConocoPhillips Transportation Alaska Inc. ExxonMobil Pipeline Company. Koch Alaska Pipeline Company LLC. Unocal Pipeline Company. State of Alaska v. BP Pipelines (Alaska) Inc. ExxonMobil Pipeline Company. ConocoPhillips Transportation Alaska, Inc. Unocal Pipeline Company. Koch Alaska Pipeline Company. Anadarko Petroleum Corporation v. TAPS Carriers. BP Pipelines (Alaska) Inc. BP Pipelines (Alaska) Inc. ExxonMobil Pipeline Company. ConocoPhillips Transportation Alaska, Inc. Unocal Pipeline Company. Koch Alaska Pipeline Company. Anadarko Petroleum Corporation v. TAPS Carriers. Contract Reporting Requirements of Intrastate Natural Gas Companies. SG Resources Mississippi, L.L.C. Fuel Retention Practices of Natural Gas Companies. HYDRO H–1 H–2 H–3 H–4 H–5 ........... ........... ........... ........... ........... P–1417–229 P–1490–048 P–6066–033 P–9300–021 P–2082–049 ............................................... ............................................... ............................................... ............................................... ............................................... Central Nebraska Public Power and Irrigation District. Brazos River Authority. McCallum Enterprises I, Limited Partnership. James Lichoulas, Jr. PacifiCorp. CERTIFICATES C–1 ........... CP02–229–004 ........................................... dwashington3 on PRODPC61 with NOTICES Kimberly D. Bose, Secretary. ENVIRONMENTAL PROTECTION AGENCY A free webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to https://www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. E8–27410 Filed 11–17–08; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 14:36 Nov 17, 2008 SG Resources Mississippi, L.L.C. Jkt 217001 [EPA–HQ–OECA–2008–0368; FRL–8741–8] Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NSPS for Calciners and Dryers in Mineral Industries, (Renewal), EPA ICR Number 0746.07, OMB Control Number 2060–0251 Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost. DATES: Additional comments may be submitted on or before December 18, 2008. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Submit your comments, referencing docket ID number EPA– OECA–2008–0368, to (1) EPA online using www.regulations.gov (our preferred method), or by e-mail to docket.oeca@epa.gov, or by mail to: EPA Docket Center (EPA/DC), Environmental Protection Agency, Enforcement and Compliance Docket and Information Center, mail code 2201T, 1200 Pennsylvania Avenue, NW., Washington, DC 20460, and (2) OMB at: Office of Information and Regulatory Affairs, Office of Management and Budget (OMB), Attention: Desk Officer for EPA, 725 17th Street, NW., Washington, DC 20503. FOR FURTHER INFORMATION CONTACT: Sounjay Gairola, Office of Enforcement and Compliance Assurance, Environmental Protection Agency, 1200 Pennsylvania Avenue, NW., Washington, DC 20460; telephone number: (202) 564–4003; e-mail address: gairola.sounjay@epa.gov. SUPPLEMENTARY INFORMATION: EPA has submitted the following ICR to OMB for review and approval according to the procedures prescribed in 5 CFR 1320.12. On May 30, 2008 (73 FR 31088), EPA sought comments on this ICR pursuant to 5 CFR 1320.8(d). EPA received no ADDRESSES: E:\FR\FM\18NON1.SGM 18NON1

Agencies

[Federal Register Volume 73, Number 223 (Tuesday, November 18, 2008)]
[Notices]
[Pages 68427-68429]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-27410]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

November 13, 2008.
    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

Agency Holding Meeting: Federal Energy Regulatory Commission.

Date and Time: November 20, 2008. 10 a.m.

Place: Room 2C, 888 First Street, NE., Washington, DC 20426.

Status: Open.

Matters to be Considered: Agenda. * Note--Items listed on the agenda 
may be deleted without further notice.

CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400. For a recorded message listing items struck 
from or added to the meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

941st--Meeting

                                                 Regular Meeting
                                          [November 20, 2008; 10 a.m.]
----------------------------------------------------------------------------------------------------------------
         Item No.                     Docket No.                                   Company
----------------------------------------------------------------------------------------------------------------
                                                 ADMINISTRATIVE
----------------------------------------------------------------------------------------------------------------
A-1......................  AD02-1-000......................  Agency Administrative Matters.
A-2......................  AD02-7-000......................  Customer Matters, Reliability, Security and Market
                                                              Operations.
A-3......................  AD06-3-000......................  Energy Market Update.
----------------------------------------------------------------------------------------------------------------

[[Page 68428]]

 
                                                    ELECTRIC
----------------------------------------------------------------------------------------------------------------
E-1......................  RM08-16-000.....................  Electric Reliability Organization Interpretations
                                                              of Frequency Response and Bias and Voltage and
                                                              Reactive Control Reliability Standards.
E-2......................  RR08-4-001, RR08-4-002..........  North American Electric Reliability Corporation.
E-3......................  OMITTED.........................
E-4......................  RC08-7-000......................  Constellation Energy Commodities Group, Inc.
E-5......................  RM08-12-000.....................  Western Electricity Coordinating Council Regional
                                                              Reliability Standard Regarding Automatic Time
                                                              Error Correction.
E-6......................  RM05-35-000.....................  Standard of Review for Modifications to
                                                              Jurisdictional Agreements.
E-7......................  ER07-521-003, ER07-521-004......  New York Independent System Operator, Inc.
E-8......................  ER08-1606-000...................  ISO New England Inc.
E-9......................  EL00-95-164, EL00-95-200........  San Diego Gas & Electric Company v. Sellers of
                                                              Energy and Ancillary Services Into Markets
                                                              Operated by the California Independent System
                                                              Operator Corporation and the California Power
                                                              Exchange Corporation.
                           EL00-98-184, EL00-98-185........  Investigation of Practices of the California
                                                              Independent System Operator Corporation and the
                                                              California Power Exchange Corporation.
E-10.....................  OMITTED.........................
E-11.....................  EL07-81-001.....................  NSTAR Electric Company v. ISO New England Inc.
E-12.....................  ER05-6-089......................  Midwest Independent Transmission System Operator,
                                                              Inc.
                           ER05-6-034......................
                           ER05-6-102......................
                           ER05-6-105......................
                           ER05-6-106......................
                           EL04-135-092....................  Midwest Independent Transmission System Operator,
                                                              Inc. and PJM Interconnection, L.L.C.
                           EL04-135-110....................
                           EL04-135-105....................
                           EL04-135-108....................
                           EL04-135-109....................
                           EL02-111-109....................  Midwest Independent Transmission System Operator,
                                                              Inc. and PJM Interconnection, L.L.C.
                           EL02-111-127....................
                           EL02-111-122....................
                           EL02-111-125....................
                           EL02-111-126....................
                           EL03-212-105....................  Ameren Services Company.
                           EL03-212-123....................
                           EL03-212-118....................
                           EL03-212-121....................
                           EL03-212-122....................
E-13.....................  OMITTED.........................
E-14.....................  ER08-1567-000...................  Southern California Edison Company.
E-15.....................  OMITTED.........................
E-16.....................  EC08-124-000....................  SUEZ Energy North America, Inc.
                                                             SUEZ Bidco, LLC.
                                                             Energy Capital Partners GP I, LLC.
                                                             FirstLight Power Enterprises, Inc.
E-17.....................  ER02-2001-009, ER07-559-000.....  Electric Quarterly Reports Flat Earth Energy, LLC.
E-18.....................  PL09-2-000......................  Material Changes in Facts that Require
                                                              Notifications Under Commission Regulations Under
                                                              the Public Utility Holding Company Act of 2005.
E-19.....................  EC08-91-000, EC08-91-001........  Horizon Asset Management, Inc.
E-20.....................  ER08-209-001....................  Midwest Independent Transmission System Operator,
                                                              Inc.
E-21.....................  ER00-3251-015, ER00-3251-017....  Exelon Generation Company, LLC.
                           ER99-754-016, ER99-754-017......  AmerGen Energy Company, LLC.
                           ER98-1734-014, ER98-1734-016....  Commonwealth Edison Company.
                           ER01-1919-011, ER01-1919-013....  Exelon Energy Company.
                           ER01-1147-006, ER01-1147-007....  PEPCO Energy Company.
                           ER01-513-021....................  Exelon West Medway, LLC.
                           ER01-513-022....................  Exelon Wyman, LLC.
                                                             Exelon New Boston, LLC.
                                                             Exelon Framingham, LLC.
                           ER99-2404-011, ER99-2404-012....  Exelon New England Power Marketing, L.P.
E-22.....................  ER08-412-002....................  Commonwealth Edison Company and Exelon Generation
                                                              Company, LLC.
----------------------------------------------------------------------------------------------------------------
                                                       GAS
----------------------------------------------------------------------------------------------------------------
G-1......................  RM08-2-000......................  Pipeline Posting Requirements under Section 23 of
                                                              the Natural Gas Act.
G-2......................  RM08-1-001......................  Promotion of a More Efficient Capacity Release
                                                              Market.
G-3......................  CP07-405-002....................  Texas Gas Transmission, LLC.
G-4......................  IS05-82-004, IS05-82-005........  BP Pipelines (Alaska) Inc.

[[Page 68429]]

 
                           IS05-80-004, IS05-80-005........  ConocoPhillips Transportation Alaska Inc.
                           IS05-72-004, IS05-72-005........  ExxonMobil Pipeline Company.
                           IS05-96-004, IS05-96-005........  Koch Alaska Pipeline Company LLC.
                           IS05-107-003, IS05-107-004......  Unocal Pipeline Company.
                           OR05-2-003, OR05-2-004..........  State of Alaska v. BP Pipelines (Alaska) Inc.
                                                             ExxonMobil Pipeline Company.
                                                             ConocoPhillips Transportation Alaska, Inc.
                                                             Unocal Pipeline Company.
                                                             Koch Alaska Pipeline Company.
                           OR05-3-014, OR05-3-015..........  Anadarko Petroleum Corporation v. TAPS Carriers.
                           OR05-10-003, OR05-10-004........  BP Pipelines (Alaska) Inc.
                           IS06-70-002, IS06-70-003........  BP Pipelines (Alaska) Inc.
                           IS06-71-002, IS06-71-003........  ExxonMobil Pipeline Company.
                           IS06-63-002, IS06-63-003........  ConocoPhillips Transportation Alaska, Inc.
                           IS06-82-002, IS06-82-003........  Unocal Pipeline Company.
                           IS06-66-002, IS06-66-003........  Koch Alaska Pipeline Company.
                           OR06-2-002, OR06-2-003..........  Anadarko Petroleum Corporation v. TAPS Carriers.
G-5......................  RM09-2-000......................  Contract Reporting Requirements of Intrastate
                                                              Natural Gas Companies.
G-6......................  RP08-606-000....................  SG Resources Mississippi, L.L.C.
G-7......................  RM07-20-000.....................  Fuel Retention Practices of Natural Gas Companies.
----------------------------------------------------------------------------------------------------------------
                                                      HYDRO
----------------------------------------------------------------------------------------------------------------
H-1......................  P-1417-229......................  Central Nebraska Public Power and Irrigation
                                                              District.
H-2......................  P-1490-048......................  Brazos River Authority.
H-3......................  P-6066-033......................  McCallum Enterprises I, Limited Partnership.
H-4......................  P-9300-021......................  James Lichoulas, Jr.
H-5......................  P-2082-049......................  PacifiCorp.
----------------------------------------------------------------------------------------------------------------
                                                  CERTIFICATES
----------------------------------------------------------------------------------------------------------------
C-1......................  CP02-229-004....................  SG Resources Mississippi, L.L.C.
----------------------------------------------------------------------------------------------------------------


Kimberly D. Bose,
Secretary.
    A free webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this 
event can do so by navigating to https://www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its webcast. The Capitol Connection provides technical 
support for the free webcasts. It also offers access to this event via 
television in the DC area and via phone bridge for a fee. If you have 
any questions, visit https://www.CapitolConnection.org or contact 
Danelle Springer or David Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.
[FR Doc. E8-27410 Filed 11-17-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.