Drawbridge Operation Regulations; Elizabeth River-Eastern Branch, at Norfolk, VA, Maintenance, 68345 [E8-27266]

Download as PDF Federal Register / Vol. 73, No. 223 / Tuesday, November 18, 2008 / Rules and Regulations regulation did not impose an unfunded mandate. Dated: October 9, 2008. Allen D. Klein, Regional Director, Western Region. 68345 Authority: 30 U.S.C. 1201 et seq. ■ § 931.15 Approval of New Mexico regulatory program amendments 1. The authority citation for part 931 continues to read as follows: Intergovernmental relations, Surface mining, Underground mining. 2. Section 931.15 is amended in the table by adding a new entry in chronological order by ‘‘Date of Final Publication’’ to read as follows: PART 931—New Mexico List of Subjects in 30 CFR Part 931 * ■ For the reasons set out in the preamble, 30 CFR part 931 is amended as set forth below: ■ * * * * Original amendment submission date Date of final publication Citation/description * November 28, 2007 ... * November 18, 2008 .. * * * * * 19 NMAC Parts 1 through 35 (recodification), 19.8.1.7.G(1); 19.8.11.1100.D(1); 19.8.11.1102.A; 19.8.11.1103.A; 19.8.11.1109.B and C; 19.8.13.1301.E(1) and E(2)(b); 19.8.13.1307.B(2); 19.8.14.1412.A(2)(f); 19.8.14.1412.F; 19.8.20.2065.A and B(1); 19.8.20.2068; 19.8.30.3000; 19.8.31.3108.B; 19.8.31.3110.B; 19.8.5.504.D; 19.8.7.701.F; 19.8.8.812.D; 19.8.11.1100.B(1), (2), (3), and (4), D(5), E(3), and F; 19.8.11.1103.B, E, and F; 19.8.13.1301.E(2)(a); 19.8.31.3106.B(3)(a). [FR Doc. E8–27360 Filed 11–17–08; 8:45 am] BILLING CODE 4310–05–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [USCG–2008–1104] RIN 1625–AA09 Drawbridge Operation Regulations; Elizabeth River—Eastern Branch, at Norfolk, VA, Maintenance Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. AGENCY: SUMMARY: The Commander, Fifth Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Norfolk Southern Railroad (NS# V2.8) Bridge, at mile 2.7, across the Elizabeth River—Eastern Branch at Norfolk, VA. Under this temporary deviation, the drawbridge may remain in the closed position on specific dates and times to facilitate mechanical repairs. This deviation is effective from 7 a.m. on December 8, 2008, to 11 p.m. on December 19, 2008. ADDRESSES: Documents indicated in this preamble as being available in the docket are part of docket USCG–2008– 1104 and are available online at www.regulations.gov. They are also available for inspection or copying at two locations: The Docket Management Facility (M–30), U.S. Department of dwashington3 on PRODPC61 with RULES DATES: VerDate Aug<31>2005 13:43 Nov 17, 2008 Jkt 217001 Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays, and the Commander (dpb), Fifth Coast Guard District, Federal Building, 1st Floor, 431 Crawford Street, Portsmouth, VA 23704–5004 between 8 a.m. and 4 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: Mr. Bill H. Brazier, Bridge Management Specialist, Fifth Coast Guard District, at (757) 398–6422. SUPPLEMENTARY INFORMATION: The Norfolk Southern Corporation, who owns and operates this single-leaf bascule drawbridge, has requested a temporary deviation from the current operating regulations set out in 33 CFR 117.1007(a) to facilitate mechanical repairs. The NS# V2.8 Bridge, a swing-type drawbridge, has a vertical clearance in the closed position to vessels of six feet, above mean high water To facilitate repairs to the center wedge machinery of the swing span, the drawbridge will be maintained in the closed-to-navigation position from 7 a.m. on December 8, 2008, until and including 11 p.m. on December 19, 2008. The Coast Guard will inform the users of the waterway through our Local and Broadcast Notices to Mariners of the opening restrictions of the draw span to minimize transiting delays caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This PO 00000 Frm 00055 Fmt 4700 Sfmt 4700 deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: November 5, 2008. Waverly W. Gregory, Jr., Chief, Bridge Administration Branch Fifth Coast Guard District. [FR Doc. E8–27266 Filed 11–17–08; 8:45 am] BILLING CODE 4910–15–P POSTAL REGULATORY COMMISSION 39 CFR Part 3020 [Docket Nos. MC2009–4 and CP2009–5; Order No. 131] Administrative Practice and Procedure, Postal Service Postal Regulatory Commission. Final rule. AGENCY: ACTION: SUMMARY: The Commission is adding Priority Mail Contract 3 (MC2009–4 and CP2009–5) to the Competitive Product List. It is also noticing a related contract. These actions are consistent with changes in a recent law governing postal operations and a related Postal Service request. Republication of the lists of market dominant and competitive products is also consistent with new requirements in the law. DATES: Effective November 18, 2008. FOR FURTHER INFORMATION CONTACT: Stephen L. Sharfman, General Counsel, 202–789–6820 and stephen.sharfman@prc.gov. Regulatory History, 73 FR 66075 (November 6, 2008). The Postal Service seeks to add a new product identified as Priority Mail Contract 3 to the Competitive Product SUPPLEMENTARY INFORMATION: E:\FR\FM\18NOR1.SGM 18NOR1

Agencies

[Federal Register Volume 73, Number 223 (Tuesday, November 18, 2008)]
[Rules and Regulations]
[Page 68345]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-27266]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[USCG-2008-1104]
RIN 1625-AA09


Drawbridge Operation Regulations; Elizabeth River--Eastern 
Branch, at Norfolk, VA, Maintenance

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, Fifth Coast Guard District, has approved a 
temporary deviation from the regulations governing the operation of the 
Norfolk Southern Railroad (NS V2.8) Bridge, at mile 2.7, 
across the Elizabeth River--Eastern Branch at Norfolk, VA. Under this 
temporary deviation, the drawbridge may remain in the closed position 
on specific dates and times to facilitate mechanical repairs.

DATES: This deviation is effective from 7 a.m. on December 8, 2008, to 
11 p.m. on December 19, 2008.

ADDRESSES: Documents indicated in this preamble as being available in 
the docket are part of docket USCG-2008-1104 and are available online 
at www.regulations.gov. They are also available for inspection or 
copying at two locations: The Docket Management Facility (M-30), U.S. 
Department of Transportation, West Building Ground Floor, Room W12-140, 
1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 
p.m., Monday through Friday, except Federal holidays, and the Commander 
(dpb), Fifth Coast Guard District, Federal Building, 1st Floor, 431 
Crawford Street, Portsmouth, VA 23704-5004 between 8 a.m. and 4 p.m., 
Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: Mr. Bill H. Brazier, Bridge Management 
Specialist, Fifth Coast Guard District, at (757) 398-6422.

SUPPLEMENTARY INFORMATION: The Norfolk Southern Corporation, who owns 
and operates this single-leaf bascule drawbridge, has requested a 
temporary deviation from the current operating regulations set out in 
33 CFR 117.1007(a) to facilitate mechanical repairs.
    The NS V2.8 Bridge, a swing-type drawbridge, has a 
vertical clearance in the closed position to vessels of six feet, above 
mean high water
    To facilitate repairs to the center wedge machinery of the swing 
span, the drawbridge will be maintained in the closed-to-navigation 
position from 7 a.m. on December 8, 2008, until and including 11 p.m. 
on December 19, 2008.
    The Coast Guard will inform the users of the waterway through our 
Local and Broadcast Notices to Mariners of the opening restrictions of 
the draw span to minimize transiting delays caused by the temporary 
deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: November 5, 2008.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch Fifth Coast Guard District.
 [FR Doc. E8-27266 Filed 11-17-08; 8:45 am]
BILLING CODE 4910-15-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.