Warmsprings Irrigation District; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 67151 [E8-26896]
Download as PDF
Federal Register / Vol. 73, No. 220 / Thursday, November 13, 2008 / Notices
number field to access the document.
For assistance, call toll-free 1–866–208–
3372.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12562–001]
Warmsprings Irrigation District; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
mstockstill on PROD1PC66 with NOTICES
November 5, 2008.
Warmsprings Irrigation District filed
an application on March 3, 2008,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of 2.5-megawatt (MW)
Warmsprings Dam Hydroelectric
Project. The project would be located on
the Malheur River, in Malheur County,
Oregon, on U.S. Bureau of Reclamation
lands. The proposed project would
utilize federal lands.
The proposed Warmsprings Dam
Hydroelectric Project would use the
U.S. Bureau of Reclamation’
Warmsprings Dam and would consist of:
(1) A proposed intake structure; (2) a
proposed 100-foot-long, 5-foot-diameter
steel penstock; (3) a proposed
powerhouse containing one generating
unit having a total installed capacity of
2.5 MW; (4) a proposed 100-foot-long,
15-kV transmission line; and (5)
appurtenant facilities.
Applicant Contact: Mr. Brent Smith,
Chief Operating Officer, Symbiotics,
LLC., P.O. Box 535, Rigby, Idaho 83442;
phone: (208) 745–0834. FERC Contact:
Tom Papsidero, 202–502–6002.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–12562–001) in the docket
VerDate Aug<31>2005
17:13 Nov 12, 2008
Jkt 217001
Kimberly D. Bose,
Secretary.
[FR Doc. E8–26896 Filed 11–12–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
November 6, 2008.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP09–49–000.
Applicants: Chandeleur Pipe Line
Company.
Description: Chandeleur Pipe Line Co.
submits Seventh Revised Sheet No. 3 et
al. to FERC Gas Tariff, Second Revised
Volume No. 1 to be effective 10/1/08.
Filed Date: 11/03/2008.
Accession Number: 20081105–0119.
Comment Date: 5 p.m. Eastern Time
on Monday, November 17, 2008.
Docket Numbers: RP09–50–000.
Applicants: Puget Sound Energy, Inc.
Description: Puget Sound Energy, Inc.
submits Eighth Revised Sheet No. 1 et
al. to FERC Gas Tariff, Original Volume
No. 1, to be effective 11/1/08 re Jackson
Prairie Gas Storage Project Agreement.
Filed Date: 10/31/2008.
Accession Number: 20081104–0097.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 12, 2008.
Docket Numbers: RP09–51–000.
Applicants: Central New York Oil and
Gas Co., LLC.
Description: Central New York Oil
and Gas Co. LLC submits Fourth
Revised Sheet No. 0 et al. to FERC Gas
Tariff, Original Volume No. 1, to be
effective 12/1/08.
Filed Date: 10/31/2008.
Accession Number: 20081104–0096.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 12, 2008.
Docket Numbers: RP09–52–000.
Applicants: Transcontinental Gas
Pipe Line Corporation.
Description: Transcontinental Gas
Pipe Line Corporation submits First
Revised Sheet No. 40R et al. to FERC
Gas Tariff, Third Revised Volume No. 1,
to be effective 12/1/08.
Filed Date: 10/31/2008.
Accession Number: 20081104–0095.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 12, 2008.
Docket Numbers: RP09–53–000.
Applicants: Dominion Transmission,
Inc.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
67151
Description: Dominion Transmission,
Inc. submits Second Revised Sheet No.
1 et al. to FERC Gas Tariff, Third
Revised Volume No. 1, to be effective
12/4/08.
Filed Date: 11/03/2008.
Accession Number: 20081104–0094.
Comment Date: 5 p.m. Eastern Time
on Friday, November 14, 2008.
Docket Numbers: RP09–54–000.
Applicants: El Paso Natural Gas
Company.
Description: El Paso Natural Gas Co.
submits Second Revised Sheet No.3 to
FERC Gas Tariff, Second Revised
Volume No. 1A to be effective 12/5/08.
Filed Date: 11/04/2008.
Accession Number: 20081105–0120.
Comment Date: 5 p.m. Eastern Time
on Monday, November 17, 2008.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
E:\FR\FM\13NON1.SGM
13NON1
Agencies
[Federal Register Volume 73, Number 220 (Thursday, November 13, 2008)]
[Notices]
[Page 67151]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-26896]
[[Page 67151]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12562-001]
Warmsprings Irrigation District; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comment, Motions To
Intervene, and Competing Applications
November 5, 2008.
Warmsprings Irrigation District filed an application on March 3,
2008, pursuant to section 4(f) of the Federal Power Act, proposing to
study the feasibility of 2.5-megawatt (MW) Warmsprings Dam
Hydroelectric Project. The project would be located on the Malheur
River, in Malheur County, Oregon, on U.S. Bureau of Reclamation lands.
The proposed project would utilize federal lands.
The proposed Warmsprings Dam Hydroelectric Project would use the
U.S. Bureau of Reclamation' Warmsprings Dam and would consist of: (1) A
proposed intake structure; (2) a proposed 100-foot-long, 5-foot-
diameter steel penstock; (3) a proposed powerhouse containing one
generating unit having a total installed capacity of 2.5 MW; (4) a
proposed 100-foot-long, 15-kV transmission line; and (5) appurtenant
facilities.
Applicant Contact: Mr. Brent Smith, Chief Operating Officer,
Symbiotics, LLC., P.O. Box 535, Rigby, Idaho 83442; phone: (208) 745-
0834. FERC Contact: Tom Papsidero, 202-502-6002.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
12562-001) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-26896 Filed 11-12-08; 8:45 am]