Warmsprings Irrigation District; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 67151 [E8-26896]

Download as PDF Federal Register / Vol. 73, No. 220 / Thursday, November 13, 2008 / Notices number field to access the document. For assistance, call toll-free 1–866–208– 3372. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12562–001] Warmsprings Irrigation District; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications mstockstill on PROD1PC66 with NOTICES November 5, 2008. Warmsprings Irrigation District filed an application on March 3, 2008, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of 2.5-megawatt (MW) Warmsprings Dam Hydroelectric Project. The project would be located on the Malheur River, in Malheur County, Oregon, on U.S. Bureau of Reclamation lands. The proposed project would utilize federal lands. The proposed Warmsprings Dam Hydroelectric Project would use the U.S. Bureau of Reclamation’ Warmsprings Dam and would consist of: (1) A proposed intake structure; (2) a proposed 100-foot-long, 5-foot-diameter steel penstock; (3) a proposed powerhouse containing one generating unit having a total installed capacity of 2.5 MW; (4) a proposed 100-foot-long, 15-kV transmission line; and (5) appurtenant facilities. Applicant Contact: Mr. Brent Smith, Chief Operating Officer, Symbiotics, LLC., P.O. Box 535, Rigby, Idaho 83442; phone: (208) 745–0834. FERC Contact: Tom Papsidero, 202–502–6002. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–12562–001) in the docket VerDate Aug<31>2005 17:13 Nov 12, 2008 Jkt 217001 Kimberly D. Bose, Secretary. [FR Doc. E8–26896 Filed 11–12–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings November 6, 2008. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP09–49–000. Applicants: Chandeleur Pipe Line Company. Description: Chandeleur Pipe Line Co. submits Seventh Revised Sheet No. 3 et al. to FERC Gas Tariff, Second Revised Volume No. 1 to be effective 10/1/08. Filed Date: 11/03/2008. Accession Number: 20081105–0119. Comment Date: 5 p.m. Eastern Time on Monday, November 17, 2008. Docket Numbers: RP09–50–000. Applicants: Puget Sound Energy, Inc. Description: Puget Sound Energy, Inc. submits Eighth Revised Sheet No. 1 et al. to FERC Gas Tariff, Original Volume No. 1, to be effective 11/1/08 re Jackson Prairie Gas Storage Project Agreement. Filed Date: 10/31/2008. Accession Number: 20081104–0097. Comment Date: 5 p.m. Eastern Time on Wednesday, November 12, 2008. Docket Numbers: RP09–51–000. Applicants: Central New York Oil and Gas Co., LLC. Description: Central New York Oil and Gas Co. LLC submits Fourth Revised Sheet No. 0 et al. to FERC Gas Tariff, Original Volume No. 1, to be effective 12/1/08. Filed Date: 10/31/2008. Accession Number: 20081104–0096. Comment Date: 5 p.m. Eastern Time on Wednesday, November 12, 2008. Docket Numbers: RP09–52–000. Applicants: Transcontinental Gas Pipe Line Corporation. Description: Transcontinental Gas Pipe Line Corporation submits First Revised Sheet No. 40R et al. to FERC Gas Tariff, Third Revised Volume No. 1, to be effective 12/1/08. Filed Date: 10/31/2008. Accession Number: 20081104–0095. Comment Date: 5 p.m. Eastern Time on Wednesday, November 12, 2008. Docket Numbers: RP09–53–000. Applicants: Dominion Transmission, Inc. PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 67151 Description: Dominion Transmission, Inc. submits Second Revised Sheet No. 1 et al. to FERC Gas Tariff, Third Revised Volume No. 1, to be effective 12/4/08. Filed Date: 11/03/2008. Accession Number: 20081104–0094. Comment Date: 5 p.m. Eastern Time on Friday, November 14, 2008. Docket Numbers: RP09–54–000. Applicants: El Paso Natural Gas Company. Description: El Paso Natural Gas Co. submits Second Revised Sheet No.3 to FERC Gas Tariff, Second Revised Volume No. 1A to be effective 12/5/08. Filed Date: 11/04/2008. Accession Number: 20081105–0120. Comment Date: 5 p.m. Eastern Time on Monday, November 17, 2008. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in E:\FR\FM\13NON1.SGM 13NON1

Agencies

[Federal Register Volume 73, Number 220 (Thursday, November 13, 2008)]
[Notices]
[Page 67151]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-26896]



[[Page 67151]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12562-001]


Warmsprings Irrigation District; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comment, Motions To 
Intervene, and Competing Applications

November 5, 2008.
    Warmsprings Irrigation District filed an application on March 3, 
2008, pursuant to section 4(f) of the Federal Power Act, proposing to 
study the feasibility of 2.5-megawatt (MW) Warmsprings Dam 
Hydroelectric Project. The project would be located on the Malheur 
River, in Malheur County, Oregon, on U.S. Bureau of Reclamation lands. 
The proposed project would utilize federal lands.
    The proposed Warmsprings Dam Hydroelectric Project would use the 
U.S. Bureau of Reclamation' Warmsprings Dam and would consist of: (1) A 
proposed intake structure; (2) a proposed 100-foot-long, 5-foot-
diameter steel penstock; (3) a proposed powerhouse containing one 
generating unit having a total installed capacity of 2.5 MW; (4) a 
proposed 100-foot-long, 15-kV transmission line; and (5) appurtenant 
facilities.
    Applicant Contact: Mr. Brent Smith, Chief Operating Officer, 
Symbiotics, LLC., P.O. Box 535, Rigby, Idaho 83442; phone: (208) 745-
0834. FERC Contact: Tom Papsidero, 202-502-6002.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or 
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
12562-001) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-26896 Filed 11-12-08; 8:45 am]
BILLING CODE 6717-01-P