Notice of Intent To Prepare an Environmental Impact Statement for Basewide Utility Infrastructure Improvements at Marine Corps Base (MCB) Camp Pendleton, San Diego County, CA, 66879-66882 [E8-26817]

Download as PDF Federal Register / Vol. 73, No. 219 / Wednesday, November 12, 2008 / Notices PURPOSE(S): NOTIFICATION PROCEDURE: To support contingency planning and military operations, to conduct counterintelligence and intelligence operations, to confirm claims against the Army by source or heirs of source, and to document source operations pertaining to the U.S. Army’s responsibilities for intelligence and counterintelligence. Individuals seeking to determine whether information about themselves is contained in this system should address written inquiries to the U.S. Army Intelligence and Security Command, Freedom of Information/ Privacy Office, 4552 Pike Road, Fort George G. Meade, MD 20755–5995. Individual should provide their full name, any alias, Social Security Number (SSN), date and place of birth, current address, telephone number and notarized signature. ROUTINE USES OF RECORDS MAINTAINED IN THE SYSTEM, INCLUDING CATEGORIES OF USERS AND THE PURPOSES OF SUCH USES: In addition to those disclosures generally permitted under 5 U.S.C. 552a(b) of the Privacy Act, these records or information contained therein may specifically be disclosed outside the DoD as routine uses pursuant to 5 U.S.C. 552a(b)(3) as follows: The ‘Blanket Routine Uses’ published at the beginning of the Army’s compilation of systems of records notices also apply to this system. POLICIES AND PRACTICES FOR STORING, RETRIEVING, ACCESSING, RETAINING, AND DISPOSING OF RECORDS IN THE SYSTEM: STORAGE: Paper records and electronic storage media. By individual name or source/project name, date and place of birth, Social Security Number, and numerically by source or project number. SAFEGUARDS: Buildings employ alarms, security guards and/or rooms are security controlled accessible only to authorized persons. Paper records in the IRR are stored in security controlled areas accessible only to authorized persons. Electronically stored records are maintained in specialized software with password protected access and data backup measures. Records are accessible only to authorized persons with a needto-know who are properly screened, cleared, and trained. mstockstill on PROD1PC66 with NOTICES RETENTION AND DISPOSAL: Records are retained in active file until no longer needed; then retired to the IRR where they are destroyed 75 years after date of last action. Destruction is by shredding, burning, or pulping for paper records and magnetic erasing for electronic records. RECORD ACCESS PROCEDURES: Individuals seeking to determine whether information about themselves is contained in this system should address written inquiries to the U.S. Army Intelligence and Security Command, Freedom of Information/ Privacy Office, 4552 Pike Road, Fort George G. Meade, MD 20755–5995. Individual should provide their full name, any alias, Social Security Number (SSN), date and place of birth, current address, telephone number and notarized signature. The Army’s rules for accessing records, and for contesting contents and appealing initial agency determinations are contained in Army Regulation 340– 21; 32 CFR part 505; or may be obtained from the system manager. RECORD SOURCE CATEGORIES: From individual; Federal and Department of Defense investigative, intelligence and law enforcement agencies; and foreign investigative, intelligence, and law enforcement agencies. EXEMPTIONS CLAIMED FOR THE SYSTEM: Parts of this system may be exempt under 5 U.S.C. 552a(k)(1), (k)(2), or (k)(5), as applicable. An exemption rule for this system has been promulgated in accordance with requirements of 5 U.S.C. 553(b)(1), (2), and (3), (c), and (e) and published in 32 CFR part 505. For additional information contact the system manager. [FR Doc. E8–26754 Filed 11–10–08; 8:45 am] BILLING CODE 5001–06–P SYSTEM MANAGER(S) AND ADDRESS: Deputy Chief of Staff for Intelligence, Headquarters, Department of the Army, 1001 Army Pentagon, Washington, DC 20310–1001. VerDate Aug<31>2005 DEPARTMENT OF DEFENSE CONTESTING RECORD PROCEDURES: RETRIEVABILITY: 18:30 Nov 10, 2008 Jkt 217001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 66879 Department of the Navy Notice of Intent To Prepare an Environmental Impact Statement for Basewide Utility Infrastructure Improvements at Marine Corps Base (MCB) Camp Pendleton, San Diego County, CA Department of the Navy, DoD. Notice. AGENCY: ACTION: SUMMARY: In accordance with section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4332(2)(c)), as implemented by the Council on Environmental Quality Regulations (40 CFR parts 1500–1508), the Department of the Navy intends to prepare an environmental impact statement (EIS) and conduct a public scoping meeting for the proposed construction, installation, and operation of multiple utility infrastructure improvements throughout MCB Camp Pendleton in San Diego County, California. The Department of the Navy will review all comments received during the 30-day public scoping period, which starts with the publication of this Notice of Intent. The public scoping meeting will be held in the San Clemente Community Center, 100 North Calle Seville, San Clemente, California, 92672 from 6 p.m. to 8 p.m. on December 10, 2008. ADDRESSES: Written comments on the scope of the MCB Camp Pendleton Basewide Utility Infrastructure Improvements EIS should be directed to: Ms. Rebecca Loomis, Naval Facilities Engineering Command Southwest, 1220 Pacific Highway, San Diego, California, 92132. FOR FURTHER INFORMATION CONTACT: Ms. Rebecca Loomis, Naval Facilities Engineering Command Southwest at telephone: 619–532–3728, fax: 619– 532–4160, or e-mail: rebecca.l.loomis@navy.mil. DATES: The purpose of the proposed action is to provide reliable, new, expanded, compliant utility systems to support Military Training and Operations and delivery of life support and quality of life services. The proposed action will also provide system redundancy that will enable the delivery of utility services during periods of scheduled and unscheduled/emergency outages. The proposed action is needed to modernize and expand Camp Pendleton’s aging (1940s/50s era) utility systems and infrastructure in order to: SUPPLEMENTARY INFORMATION: E:\FR\FM\12NON1.SGM 12NON1 66880 Federal Register / Vol. 73, No. 219 / Wednesday, November 12, 2008 / Notices mstockstill on PROD1PC66 with NOTICES (1) Sustain compliance with current and future regulatory and code requirements, (2) provide reliable services and alternate sources for planned maintenance and unscheduled repairs, and to assure availability during periods of emergency and natural disaster, (3) conserve and effectively manage resources, and (4) accommodate current and potential future growth at MCB Camp Pendleton. The proposed action consists of eight projects, which are discussed below. Northern Regional Tertiary Treatment Plant (NRTTP) and Associated Facilities (MILCON P–1043) P–1043 would construct a 5-milliongallon per day NRTTP and sludge treatment facility near the location of existing Sewage Treatment Plant (STP) 11. This project consolidates and replaces the existing Sewage Treatment Plants (STP) 10, 11, and 12 and would treat raw sewage from the associated collection system and conveyance lines. In order to accomplish this, the project would include modification or reuse of the existing headworks facilities at STPs 10, 11, and 12; a new sewer conveyance line from STP 12 in San Mateo (62 Area) to the new NRTTP; lift stations, and the conversion of STP 12 to a Tributary Area Pump Station (TAPS). The new NRTTP will include various sewage treatment components within the plant compound such as: an influent pump station, sludge treatment and handling facilities, preliminary treatment facilities, secondary treatment facilities, advanced (tertiary) wastewater treatment facilities, chemical storage and feed systems, odor control facilities, and a 4,600-square-foot operations facility. Some demolition may be required as part of the conversion of STPs 10, 11, and 12 to TAPS. P–1043 would construct approximately 36,000 linear feet (LF) of wastewater main lines sized from 8 to 15 inches in diameter. The project would begin in Talega (64 Area) and would continue through Cristianitos (63 Area) to the proposed TAPS 12 at San Mateo (62 Area). The project would provide new wastewater lines to replace the existing wastewater lines from the San Onofre Housing area to the proposed NRTTP. A new wastewater line would also replace the existing wastewater line from Horno (53 Area) through the School of Infantry (52 Area) to the proposed NRTTP. The project would also construct approximately 70,000 LF of pipeline from the NRTTP to convey recycled water to selected reuse areas in Talega (64 Area). The project would include new Reuse Pump Stations, a 2-million-gallon NRTTP VerDate Aug<31>2005 18:30 Nov 10, 2008 Jkt 217001 reuse water storage facility, and backflow preventors to prevent any cross connections between the potable and wastewater systems. Alternatives—The alternative for P– 1043 would be an alternative alignment from San Mateo (62 Area) to STP 11. This alignment would extend the line from STP/TAPS 12 south along Coast Road, east of the northern agriculture fields and to Basilone Road, and then east along Basilone Road to STP 11. This alignment would follow the alignment for P–1045 discussed below. Also, the use of Horizontal Directional Drilling (HDD) for passing under San Mateo Creek will also be considered as a feasible technology. This will be compared to more standard pipe laying construction methods such as trenching and backfilling. Advanced Water Treatment (AWT) North and Associated Facilities (MILCON P–1044) P–1044 would construct AWT facilities to serve the northern region of MCB Camp Pendleton to provide a reduction of total dissolved solids, total organic carbon, and corrosivity. Construction would include a Granulated Activated Carbon/Reverse Osmosis facility and associated Brine Disposal System. Micro-filtration system is used for water treatment. The Brine Disposal System would connect the Reverse Osmosis module and would include a brine/slurry dilution facility, brine line pump station, and pipeline to an ocean outfall at San Onofre Nuclear Generating Station (SONGS). The project would also construct wellhead collection points with associated piping and pumps and an 800-square-foot operations facility. P–1044 would construct approximately 59,000 LF of main water lines, with pipelines ranging in size from 10 to 14 inches in diameter for potable water conveyance in the northern region of MCB Camp Pendleton. The new lines would connect into the new AWT Facility North. The line would begin at the AWT facility in the San Onofre Housing Cantonment area and continue to Horno (53 Area). A second water line would link Talega (64 Area) to San Mateo (62 Area). The project would include three pump stations with emergency generators, asphalt patches, and connection to existing reservoirs and distribution system. Potable water loops, 8-inch in diameter would be installed within each cantonment and housing area totaling approximately 21,000 LF of piping. Alternative—Alternatives would include consideration of multiple independent raw water treatment PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 facilities and feasible treatment technologies located within multiple cantonment areas instead of consolidated regional treatment plants. Connection of North and South Water Systems (MILCON P–1045) P–1045 would construct approximately 90,000 LF of potable waterlines sized approximately 36 inches in diameter to connect the northern and southern water systems of MCB Camp Pendleton. A water line would begin at the proposed AWT Facility (P–1044), extend past the SONGS Mesa facility, and then continue along the east side of Interstate 5 (I–5) before crossing San Onofre Creek. The line would travel south along Stuart Mesa Road, cross the Santa Margarita River, and then would connect to the southern water system at the intersection of Stuart Mesa Road and Vandegrift Boulevard. The project would also include three pump stations at the north, central, and south portions of the Base to connect Las Pulgas, Las Flores, and the Stuart Mesa areas to the South Water System. Alternative Alignment—This alternative alignment would begin at the proposed AWT facilities (P–1044) and extend east along Basilone Road (instead of El Camino Real) to Las Pulgas Road and then south on Las Pulgas Road to Stuart Mesa Road. At Stuart Mesa Road the alignment would follow the same alignment of the proposed action to the connection of the southern system at the corner of Stuart Mesa Road and Vandegrift Boulevard. Also, the project would consider the use of approximately 7,000 LF of HDD beneath San Onofre Creek and the Santa Margarita River. Upgrades to Electrical Systems and Associated Facilities (MILCON P–1048) P–1048 would construct a 69 kilovolt (kV) electrical transmission system that will provide a more efficient and reliable transmission method, system redundancy and energy cost savings. The 69 KV system will meet industry standard for long distance delivery of power and provide capability to back feed all cantonment areas from a secondary source during blackouts caused by wildfires, other natural disasters, and/or systems failure. The project would construct four new 69 kV substations located (1) at the existing Haybarn Canyon location, (2) near the intersection of Pulgas Road and Stuart Mesa Road, (3) in the vicinity of the SONGS, and (4) in the general area of the intersection of Cristianitos Road and San Mateo Road. The first three substations would connect to existing E:\FR\FM\12NON1.SGM 12NON1 Federal Register / Vol. 73, No. 219 / Wednesday, November 12, 2008 / Notices mstockstill on PROD1PC66 with NOTICES San Diego Gas and Electric (SDG&E) 69 kV lines. The fourth substation would convert the proposed MCB Camp Pendleton 69 kV line to the existing MCB Camp Pendleton 12 kV system. The project would provide distribution of electrical power through four different connecting segments. The first segment (Haybarn segment) would include a new 69 kV overhead distribution line with a 12 kV line running on the same utility poles. These lines would connect the proposed Substation #1 to Range 409. For the second segment, the 69 kV distribution line would extend underground (to avoid conflicts with aircraft training and safety) through Range 409 to resurface in the eastern portion of the Base. For the third segment, the 69 kV distribution line would continue overhead along the eastern and northern Base boundaries following the SDG&E 230 kV transmission lines, proceed down Cristianitos Road and connect to the proposed Substation #4, and continue to I–5. The line would parallel I–5 toward the proposed Substation #3 located in the vicinity of SONGS, completing the northern loop. For the fourth segment, the final 69 kV overhead power line would extend from the proposed Substation #2 and follow Pulgas Road with a 69 kV and 12 kV distribution line on the same utility pole. At Las Pulgas (43 Area), only the 69 kV line would continue south along Basilone Road to Roblar Road to connect to the Haybarn line, completing the southern loop. Alternative Alignment—The alternative to P–1048 would be to underground all four electrical line segments. Under the proposed action only the segment through Range 409 is proposed to be underground. MILCON P–1094 P–1094 would replace the existing 12 kV electrical distribution systems currently fed from the Haybarn substation, and the 4.16 kV subsystems fed from the 12 kV distribution system. The project would construct a total of 8 new 12 kV circuits, which would be fed from the new 69 kV substation (P–1048), to provide approximately 60 percent of the electrical power for MCB Camp Pendleton. Existing ‘‘A’’ circuit provides power to the 11, 12, 13, 15, and 16 (Mainside) areas of MCB Camp Pendleton. Existing ‘‘C’’ circuit would provide power to the 23 (Marine Corps Air Station Camp Pendleton (MCAS CP)), 25 Vado del Rio), 32 (MASS–3), and 33 (Margarita) areas. Existing ‘‘E’’ circuit would provide power to the 20 (Main Gate), 22 (Chappo), and 26 (at the bottom of Rattlesnake Canyon Rd) areas VerDate Aug<31>2005 18:30 Nov 10, 2008 Jkt 217001 and would also provide power to the housing areas at Wire Mountain. Existing ‘‘F’’ circuit would provide power to the 26 Area and the Naval Hospital. Existing ‘‘G’’ circuit would provide power to the 14 and 15 (Mainside) areas, O’Neil Housing, Camp Day, and Range 409. Existing ‘‘H’’ circuit would provide power to the 23 (MCAS CP) and 24 (Pico) areas. The project would provide replacement 12 kV circuits for the existing ‘‘A,’’ ‘‘C,’’ ‘‘E,’’ ‘‘F,’’ ‘‘G,’’ and ‘‘H’’ circuits and would provide new circuits to supply power to 21 Area (Del Mar) and the 31 Area (Edson Range and Assault Craft Unit-5). Overhead distribution lines would include aluminum core steel reinforced wire and both 45-foot and 70foot tall wood poles, with crossarms and insulators. Underground distribution lines would include copper insulation, 4 to 6-inch polyvinyl chloride conduit, trenching, pavement cutting, utility vault placement, conduit placement, grounding, concrete encasement, and asphalt pavement patching. Alternative Alignment—Similar to the alternative for P–1048, the alternative for P–1094 would be to underground the proposed electrical lines. Wastewater Facilities, Roadway Improvements, and Shoot House Construction and Expansion (MILCON P–1049) P–1049 would construct approximately 20,000 LF of potable water and sanitary sewer utilities, including new sewer lines, manholes, cleanouts, and a lift station, to better house and train Marines at the Range 130 Complex in the X-Ray Training Area. P–1049 would also include approximately 3 miles of roadway improvements, including 10-inch base material, track mix asphalt surface course, and culverts at established drainage points. Other facilities proposed include a 2,500-square-foot shoot house and a 24,000-square-foot covered small arms range. The project would also enlarge an existing covered small arms range to approximately 34,000 square feet. Alternative Alignment—This alignment would extend from the preferred alignment along the main access road to Range 130, west to the pump station in the 41 Area instead of continuing along the main access road southwest to Stuart Mesa Road. This would reduce the overall pipe length by approximately 3,000 LF. Communication Upgrades (MILCON P–1093) P–1093 would provide both intercamp and intracamp fiber-optic PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 66881 cable and telephone cable connections. This project would provide a redundant communications network by providing a minimum of two separate communication line paths to each area on the Base. Alternatives—Potential alternatives for P–1099 include placing all communication lines overhead. Another alternative to be addressed would include the use of wireless communication instead of landline communication. Natural Gas System Upgrades (MILCON P–1099) P–1099 installs new high pressure 6 inch High Density Polyethylene (HDPE) gas mains in four separate locations: (1) Approximately 15,000 LF from 62 (San Mateo) Area to 63 (Christainitos) Area and to 64 (Talega) Area (currently the 63 and 64 Cantonment Areas are only supplied by propane gas storage tanks), (2) approximately 30,000 LF from 41 Area to 43 Area, (3) approximately 30,000 LF from 43 Area to 25 Area (interconnecting the southern and northern natural gas systems, and (4) approximately 15,000 LF from the Naval Hospital to the Headquarters Area (providing the Naval Hospital with back-up source of natural gas). Construction would consist of saw cutting existing asphalt concrete pavement, trench excavation, and installation of new HDPE pipe including fittings, etc. P–1099 would also include patching of existing pavement and related roadway lane striping and traffic control. Alternative Alignment—The alternative alignment for P–1099 would extend the proposed natural gas the line from the Naval Hospital east through undeveloped land directly to De Luz Road. Preliminary Alternatives The EIS will address the proposed utility alignments, alternative utility segment alignments, and alternative alignment installation (aboveground, underground) as briefly discussed above. In addition, alternative technologies, including multiple smaller systems; and the No Action Alternative will be addressed. Environmental Issues and Resources To Be Examined The EIS will evaluate the potential environmental effects associated with each of the alternatives. Issues to be addressed include, but are not limited to, biological resources, historic and archaeological resources, geology and soils, hydrology, water quality, air quality, visual resources, and public E:\FR\FM\12NON1.SGM 12NON1 66882 Federal Register / Vol. 73, No. 219 / Wednesday, November 12, 2008 / Notices services. Relevant and reasonable measures that could alleviate environmental effects will be identified and considered. Other Agency Involvement mstockstill on PROD1PC66 with NOTICES The Department of the Navy will undertake necessary consultations with regulatory entities pursuant to the Endangered Species Act, Clean Water Act, National Historic Preservation Act, and any other applicable law or regulation. Consultation will include but is not limited to the following federal, state, and local agencies: U.S. Fish and Wildlife Service; State Historic Preservation Officer; American Indian Tribes; U.S. Army Corps of Engineers; U.S. Environmental Protection Agency; all local Historic Site Boards and Heritage organizations; California Regional Water Quality Control Board; California Coastal Commission; San Diego Air Pollution Control District; and the County of San Diego, Department of Environmental Health. Public Scoping Process: The Department of the Navy is initiating the scoping process to identify community concerns and local issues that should be addressed in the EIS. Federal, State, and local agencies and interested persons are encouraged to provide oral and/or written comments to identify specific issues or topics of environmental concern for consideration in the EIS. The Navy will consider these comments in determining the scope for the EIS. The public scoping period begins with the publication of this Notice of Intent, and will continue for 30 days, ending on December 15, 2008. Written comments on the scope of the EIS should be submitted no later than December 15, 2008 by mail to Ms. Rebecca Loomis, Naval Facilities Engineering Command, Southwest, 1220 Pacific Highway, San Diego, California 92132 or e-mail to Rebecca.l.loomis@navy.mil. The public scoping meeting will be held in the San Clemente Community Center, 100 North Calle Seville, San Clemente, California 92672 from 6 p.m. to 8 p.m. on December 10, 2008. The meeting also will be announced by notices published in the North County Times and San Clemente Times 15 days prior to the scoping meeting. A court reporter will be available at the meeting to accept oral comments. Dated: November 5, 2008. T. M. Cruz, Lieutenant Commander, Judge Advocate General’s Corps, U.S. Navy, Federal Register Liaison Officer. [FR Doc. E8–26817 Filed 11–10–08; 8:45 am] BILLING CODE 3810–FF–P VerDate Aug<31>2005 18:30 Nov 10, 2008 Jkt 217001 20380–1775. The Cross Domain Solution (CDS) server will be located at the Defense Information Support Agency (DISA), 701 South Courthouse Road, Arlington, VA 22204–2199. DEPARTMENT OF DEFENSE Department of the Navy [Docket ID USN–2008–0057] Privacy Act of 1974; System of Records U.S. Marine Corps, DoD. Notice to add a system of AGENCY: ACTION: records. SUMMARY: The U.S. Marine Corps is proposing to add a new system of records notice to its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended. This proposed action will be effective without further notice on December 12, 2008, unless comments are received which result in a contrary determination. ADDRESSES: Send comments to Headquarters, U.S. Marine Corps, FOIA/ PA Section (ARSF), 2 Navy Annex, Room 3134, Washington, DC 20380– 1775. DATES: Ms. Tracy Ross at (703) 614–4008. SUPPLEMENTARY INFORMATION: The U.S. Marine Corps system of records notices subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended, have been published in the Federal Register and are available from the address above. The proposed system report, as required by 5 U.S.C. 552a, of the Privacy Act of 1974, as amended, was submitted on October 24, 2008, to the House Committee on Oversight and Government Reform, the Senate Committee on Homeland Security and Governmental Affairs, and the Office of Management and Budget (OMB) pursuant to paragraph 4c of Appendix I to OMB Circular No. A–130, ‘‘Federal Agency Responsibilities for Maintaining Records About Individuals,’’ dated February 8, 1996 (February 20, 1996, 61 FR 6427). FOR FURTHER INFORMATION CONTACT: Dated: November 3, 2008. Morgan E. Frazier, Alternate OSD Federal Register Liaison Officer, Department of Defense. M–01080–1 SYSTEM NAME: Total Force Administration System Secure Personnel Accountability (TFAS SPA) Records. SYSTEM LOCATION: Web servers will be located at Information Systems Management Branch (ARI), Headquarters Marine Corps, #2 Navy Annex, Washington, DC PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 CATEGORIES OF INDIVIDUALS COVERED BY THE SYSTEM: Deployed active duty Marines, as well as DoD members who are under the status of United States Code Title 10 Armed Forces Operational Control (OPCON) and Administrative Control (ADCON) to Marine Force Commands to include Army National Guard, and reserve military service members of the Air Force, Navy, Army, and approved foreign military personnel. CATEGORIES OF RECORDS IN THE SYSTEM: Deployed service data such as: current location (Country, Area of Operation, Military Grid, Lat/Long, etc.), Title 10 OPCON, Title 10 ADCON, assigned, attached, tenant command relationships; full name, rank, Social Security Number (SSN), date of birth, sex, death date, marital status, citizenship, country code, personnel category code, personnel entitlement condition type code, service, primary occupation code, and pay plan code. The system contains specific unit information (commander name and unit location), for the personnel it tracks. AUTHORITY FOR MAINTENANCE OF THE SYSTEM: 10 U.S.C. 5013, Secretary of the Navy; 10 U.S.C. 5041, Headquarters, Marine Corps; CJCSM 3150.13B Joint Reporting Structure—Personnel Manual; Title 10 U.S.C. 136, Uniform Code of Military Justice; and E.O. 9397 (SSN). PURPOSE(S): The TFAS SPA Module provides a tool to implement deployed accountability for all active duty U.S. Marines, as well as DoD members who are Title 10 OPCON to Marine Force Commands to include Army National Guard, and reserve military service members of the Air Force, Navy, Army, and approved foreign military personnel. ROUTINE USES OF RECORDS MAINTAINED IN THE SYSTEM, INCLUDING CATEGORIES OF USERS AND THE PURPOSES OF SUCH USES: In addition to those disclosures generally permitted under 5 U.S.C. 552a(b) of the Privacy Act, these records or information contained therein may specifically be disclosed outside the DoD as a routine use pursuant to 5 U.S.C. 552a(b)(3) as follows: To officials and employees of other departments and agencies of the Executive Branch of government, upon request, in the performance of their E:\FR\FM\12NON1.SGM 12NON1

Agencies

[Federal Register Volume 73, Number 219 (Wednesday, November 12, 2008)]
[Notices]
[Pages 66879-66882]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-26817]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Navy


Notice of Intent To Prepare an Environmental Impact Statement for 
Basewide Utility Infrastructure Improvements at Marine Corps Base (MCB) 
Camp Pendleton, San Diego County, CA

AGENCY: Department of the Navy, DoD.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: In accordance with section 102(2)(c) of the National 
Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4332(2)(c)), as 
implemented by the Council on Environmental Quality Regulations (40 CFR 
parts 1500-1508), the Department of the Navy intends to prepare an 
environmental impact statement (EIS) and conduct a public scoping 
meeting for the proposed construction, installation, and operation of 
multiple utility infrastructure improvements throughout MCB Camp 
Pendleton in San Diego County, California.

DATES: The Department of the Navy will review all comments received 
during the 30-day public scoping period, which starts with the 
publication of this Notice of Intent. The public scoping meeting will 
be held in the San Clemente Community Center, 100 North Calle Seville, 
San Clemente, California, 92672 from 6 p.m. to 8 p.m. on December 10, 
2008.

ADDRESSES: Written comments on the scope of the MCB Camp Pendleton 
Basewide Utility Infrastructure Improvements EIS should be directed to: 
Ms. Rebecca Loomis, Naval Facilities Engineering Command Southwest, 
1220 Pacific Highway, San Diego, California, 92132.

FOR FURTHER INFORMATION CONTACT: Ms. Rebecca Loomis, Naval Facilities 
Engineering Command Southwest at telephone: 619-532-3728, fax: 619-532-
4160, or e-mail: rebecca.l.loomis@navy.mil.

SUPPLEMENTARY INFORMATION: The purpose of the proposed action is to 
provide reliable, new, expanded, compliant utility systems to support 
Military Training and Operations and delivery of life support and 
quality of life services. The proposed action will also provide system 
redundancy that will enable the delivery of utility services during 
periods of scheduled and unscheduled/emergency outages. The proposed 
action is needed to modernize and expand Camp Pendleton's aging (1940s/
50s era) utility systems and infrastructure in order to:

[[Page 66880]]

(1) Sustain compliance with current and future regulatory and code 
requirements, (2) provide reliable services and alternate sources for 
planned maintenance and unscheduled repairs, and to assure availability 
during periods of emergency and natural disaster, (3) conserve and 
effectively manage resources, and (4) accommodate current and potential 
future growth at MCB Camp Pendleton. The proposed action consists of 
eight projects, which are discussed below.

Northern Regional Tertiary Treatment Plant (NRTTP) and Associated 
Facilities (MILCON P-1043)

    P-1043 would construct a 5-million-gallon per day NRTTP and sludge 
treatment facility near the location of existing Sewage Treatment Plant 
(STP) 11. This project consolidates and replaces the existing Sewage 
Treatment Plants (STP) 10, 11, and 12 and would treat raw sewage from 
the associated collection system and conveyance lines. In order to 
accomplish this, the project would include modification or reuse of the 
existing headworks facilities at STPs 10, 11, and 12; a new sewer 
conveyance line from STP 12 in San Mateo (62 Area) to the new NRTTP; 
lift stations, and the conversion of STP 12 to a Tributary Area Pump 
Station (TAPS). The new NRTTP will include various sewage treatment 
components within the plant compound such as: an influent pump station, 
sludge treatment and handling facilities, preliminary treatment 
facilities, secondary treatment facilities, advanced (tertiary) 
wastewater treatment facilities, chemical storage and feed systems, 
odor control facilities, and a 4,600-square-foot operations facility. 
Some demolition may be required as part of the conversion of STPs 10, 
11, and 12 to TAPS.
    P-1043 would construct approximately 36,000 linear feet (LF) of 
wastewater main lines sized from 8 to 15 inches in diameter. The 
project would begin in Talega (64 Area) and would continue through 
Cristianitos (63 Area) to the proposed TAPS 12 at San Mateo (62 Area). 
The project would provide new wastewater lines to replace the existing 
wastewater lines from the San Onofre Housing area to the proposed 
NRTTP. A new wastewater line would also replace the existing wastewater 
line from Horno (53 Area) through the School of Infantry (52 Area) to 
the proposed NRTTP. The project would also construct approximately 
70,000 LF of pipeline from the NRTTP to convey recycled water to 
selected reuse areas in Talega (64 Area). The project would include new 
Reuse Pump Stations, a 2-million-gallon NRTTP reuse water storage 
facility, and backflow preventors to prevent any cross connections 
between the potable and wastewater systems.
    Alternatives--The alternative for P-1043 would be an alternative 
alignment from San Mateo (62 Area) to STP 11. This alignment would 
extend the line from STP/TAPS 12 south along Coast Road, east of the 
northern agriculture fields and to Basilone Road, and then east along 
Basilone Road to STP 11. This alignment would follow the alignment for 
P-1045 discussed below. Also, the use of Horizontal Directional 
Drilling (HDD) for passing under San Mateo Creek will also be 
considered as a feasible technology. This will be compared to more 
standard pipe laying construction methods such as trenching and 
backfilling.

Advanced Water Treatment (AWT) North and Associated Facilities (MILCON 
P-1044)

    P-1044 would construct AWT facilities to serve the northern region 
of MCB Camp Pendleton to provide a reduction of total dissolved solids, 
total organic carbon, and corrosivity. Construction would include a 
Granulated Activated Carbon/Reverse Osmosis facility and associated 
Brine Disposal System. Micro-filtration system is used for water 
treatment. The Brine Disposal System would connect the Reverse Osmosis 
module and would include a brine/slurry dilution facility, brine line 
pump station, and pipeline to an ocean outfall at San Onofre Nuclear 
Generating Station (SONGS). The project would also construct wellhead 
collection points with associated piping and pumps and an 800-square-
foot operations facility. P-1044 would construct approximately 59,000 
LF of main water lines, with pipelines ranging in size from 10 to 14 
inches in diameter for potable water conveyance in the northern region 
of MCB Camp Pendleton. The new lines would connect into the new AWT 
Facility North. The line would begin at the AWT facility in the San 
Onofre Housing Cantonment area and continue to Horno (53 Area). A 
second water line would link Talega (64 Area) to San Mateo (62 Area). 
The project would include three pump stations with emergency 
generators, asphalt patches, and connection to existing reservoirs and 
distribution system. Potable water loops, 8-inch in diameter would be 
installed within each cantonment and housing area totaling 
approximately 21,000 LF of piping.
    Alternative--Alternatives would include consideration of multiple 
independent raw water treatment facilities and feasible treatment 
technologies located within multiple cantonment areas instead of 
consolidated regional treatment plants.

Connection of North and South Water Systems (MILCON P-1045)

    P-1045 would construct approximately 90,000 LF of potable 
waterlines sized approximately 36 inches in diameter to connect the 
northern and southern water systems of MCB Camp Pendleton. A water line 
would begin at the proposed AWT Facility (P-1044), extend past the 
SONGS Mesa facility, and then continue along the east side of 
Interstate 5 (I-5) before crossing San Onofre Creek. The line would 
travel south along Stuart Mesa Road, cross the Santa Margarita River, 
and then would connect to the southern water system at the intersection 
of Stuart Mesa Road and Vandegrift Boulevard. The project would also 
include three pump stations at the north, central, and south portions 
of the Base to connect Las Pulgas, Las Flores, and the Stuart Mesa 
areas to the South Water System.
    Alternative Alignment--This alternative alignment would begin at 
the proposed AWT facilities (P-1044) and extend east along Basilone 
Road (instead of El Camino Real) to Las Pulgas Road and then south on 
Las Pulgas Road to Stuart Mesa Road. At Stuart Mesa Road the alignment 
would follow the same alignment of the proposed action to the 
connection of the southern system at the corner of Stuart Mesa Road and 
Vandegrift Boulevard. Also, the project would consider the use of 
approximately 7,000 LF of HDD beneath San Onofre Creek and the Santa 
Margarita River.

Upgrades to Electrical Systems and Associated Facilities (MILCON P-
1048)

    P-1048 would construct a 69 kilovolt (kV) electrical transmission 
system that will provide a more efficient and reliable transmission 
method, system redundancy and energy cost savings. The 69 KV system 
will meet industry standard for long distance delivery of power and 
provide capability to back feed all cantonment areas from a secondary 
source during blackouts caused by wildfires, other natural disasters, 
and/or systems failure. The project would construct four new 69 kV 
substations located (1) at the existing Haybarn Canyon location, (2) 
near the intersection of Pulgas Road and Stuart Mesa Road, (3) in the 
vicinity of the SONGS, and (4) in the general area of the intersection 
of Cristianitos Road and San Mateo Road. The first three substations 
would connect to existing

[[Page 66881]]

San Diego Gas and Electric (SDG&E) 69 kV lines. The fourth substation 
would convert the proposed MCB Camp Pendleton 69 kV line to the 
existing MCB Camp Pendleton 12 kV system. The project would provide 
distribution of electrical power through four different connecting 
segments. The first segment (Haybarn segment) would include a new 69 kV 
overhead distribution line with a 12 kV line running on the same 
utility poles. These lines would connect the proposed Substation 
1 to Range 409. For the second segment, the 69 kV distribution 
line would extend underground (to avoid conflicts with aircraft 
training and safety) through Range 409 to resurface in the eastern 
portion of the Base. For the third segment, the 69 kV distribution line 
would continue overhead along the eastern and northern Base boundaries 
following the SDG&E 230 kV transmission lines, proceed down 
Cristianitos Road and connect to the proposed Substation 4, 
and continue to I-5. The line would parallel I-5 toward the proposed 
Substation 3 located in the vicinity of SONGS, completing the 
northern loop. For the fourth segment, the final 69 kV overhead power 
line would extend from the proposed Substation 2 and follow 
Pulgas Road with a 69 kV and 12 kV distribution line on the same 
utility pole. At Las Pulgas (43 Area), only the 69 kV line would 
continue south along Basilone Road to Roblar Road to connect to the 
Haybarn line, completing the southern loop.
    Alternative Alignment--The alternative to P-1048 would be to 
underground all four electrical line segments. Under the proposed 
action only the segment through Range 409 is proposed to be 
underground.

MILCON P-1094

    P-1094 would replace the existing 12 kV electrical distribution 
systems currently fed from the Haybarn substation, and the 4.16 kV 
subsystems fed from the 12 kV distribution system. The project would 
construct a total of 8 new 12 kV circuits, which would be fed from the 
new 69 kV substation (P-1048), to provide approximately 60 percent of 
the electrical power for MCB Camp Pendleton. Existing ``A'' circuit 
provides power to the 11, 12, 13, 15, and 16 (Mainside) areas of MCB 
Camp Pendleton. Existing ``C'' circuit would provide power to the 23 
(Marine Corps Air Station Camp Pendleton (MCAS CP)), 25 Vado del Rio), 
32 (MASS-3), and 33 (Margarita) areas. Existing ``E'' circuit would 
provide power to the 20 (Main Gate), 22 (Chappo), and 26 (at the bottom 
of Rattlesnake Canyon Rd) areas and would also provide power to the 
housing areas at Wire Mountain. Existing ``F'' circuit would provide 
power to the 26 Area and the Naval Hospital. Existing ``G'' circuit 
would provide power to the 14 and 15 (Mainside) areas, O'Neil Housing, 
Camp Day, and Range 409. Existing ``H'' circuit would provide power to 
the 23 (MCAS CP) and 24 (Pico) areas. The project would provide 
replacement 12 kV circuits for the existing ``A,'' ``C,'' ``E,'' ``F,'' 
``G,'' and ``H'' circuits and would provide new circuits to supply 
power to 21 Area (Del Mar) and the 31 Area (Edson Range and Assault 
Craft Unit-5). Overhead distribution lines would include aluminum core 
steel reinforced wire and both 45-foot and 70-foot tall wood poles, 
with crossarms and insulators. Underground distribution lines would 
include copper insulation, 4 to 6-inch polyvinyl chloride conduit, 
trenching, pavement cutting, utility vault placement, conduit 
placement, grounding, concrete encasement, and asphalt pavement 
patching.
    Alternative Alignment--Similar to the alternative for P-1048, the 
alternative for P-1094 would be to underground the proposed electrical 
lines.

Wastewater Facilities, Roadway Improvements, and Shoot House 
Construction and Expansion (MILCON P-1049)

    P-1049 would construct approximately 20,000 LF of potable water and 
sanitary sewer utilities, including new sewer lines, manholes, 
cleanouts, and a lift station, to better house and train Marines at the 
Range 130 Complex in the X-Ray Training Area. P-1049 would also include 
approximately 3 miles of roadway improvements, including 10-inch base 
material, track mix asphalt surface course, and culverts at established 
drainage points. Other facilities proposed include a 2,500-square-foot 
shoot house and a 24,000-square-foot covered small arms range. The 
project would also enlarge an existing covered small arms range to 
approximately 34,000 square feet.
    Alternative Alignment--This alignment would extend from the 
preferred alignment along the main access road to Range 130, west to 
the pump station in the 41 Area instead of continuing along the main 
access road southwest to Stuart Mesa Road. This would reduce the 
overall pipe length by approximately 3,000 LF.

Communication Upgrades (MILCON P-1093)

    P-1093 would provide both intercamp and intracamp fiber-optic cable 
and telephone cable connections. This project would provide a redundant 
communications network by providing a minimum of two separate 
communication line paths to each area on the Base.
    Alternatives--Potential alternatives for P-1099 include placing all 
communication lines overhead. Another alternative to be addressed would 
include the use of wireless communication instead of landline 
communication.

Natural Gas System Upgrades (MILCON P-1099)

    P-1099 installs new high pressure 6 inch High Density Polyethylene 
(HDPE) gas mains in four separate locations: (1) Approximately 15,000 
LF from 62 (San Mateo) Area to 63 (Christainitos) Area and to 64 
(Talega) Area (currently the 63 and 64 Cantonment Areas are only 
supplied by propane gas storage tanks), (2) approximately 30,000 LF 
from 41 Area to 43 Area, (3) approximately 30,000 LF from 43 Area to 25 
Area (interconnecting the southern and northern natural gas systems, 
and (4) approximately 15,000 LF from the Naval Hospital to the 
Headquarters Area (providing the Naval Hospital with back-up source of 
natural gas). Construction would consist of saw cutting existing 
asphalt concrete pavement, trench excavation, and installation of new 
HDPE pipe including fittings, etc. P-1099 would also include patching 
of existing pavement and related roadway lane striping and traffic 
control.
    Alternative Alignment--The alternative alignment for P-1099 would 
extend the proposed natural gas the line from the Naval Hospital east 
through undeveloped land directly to De Luz Road.

Preliminary Alternatives

    The EIS will address the proposed utility alignments, alternative 
utility segment alignments, and alternative alignment installation 
(aboveground, underground) as briefly discussed above. In addition, 
alternative technologies, including multiple smaller systems; and the 
No Action Alternative will be addressed.

Environmental Issues and Resources To Be Examined

    The EIS will evaluate the potential environmental effects 
associated with each of the alternatives. Issues to be addressed 
include, but are not limited to, biological resources, historic and 
archaeological resources, geology and soils, hydrology, water quality, 
air quality, visual resources, and public

[[Page 66882]]

services. Relevant and reasonable measures that could alleviate 
environmental effects will be identified and considered.

Other Agency Involvement

    The Department of the Navy will undertake necessary consultations 
with regulatory entities pursuant to the Endangered Species Act, Clean 
Water Act, National Historic Preservation Act, and any other applicable 
law or regulation. Consultation will include but is not limited to the 
following federal, state, and local agencies: U.S. Fish and Wildlife 
Service; State Historic Preservation Officer; American Indian Tribes; 
U.S. Army Corps of Engineers; U.S. Environmental Protection Agency; all 
local Historic Site Boards and Heritage organizations; California 
Regional Water Quality Control Board; California Coastal Commission; 
San Diego Air Pollution Control District; and the County of San Diego, 
Department of Environmental Health.
    Public Scoping Process: The Department of the Navy is initiating 
the scoping process to identify community concerns and local issues 
that should be addressed in the EIS. Federal, State, and local agencies 
and interested persons are encouraged to provide oral and/or written 
comments to identify specific issues or topics of environmental concern 
for consideration in the EIS. The Navy will consider these comments in 
determining the scope for the EIS. The public scoping period begins 
with the publication of this Notice of Intent, and will continue for 30 
days, ending on December 15, 2008. Written comments on the scope of the 
EIS should be submitted no later than December 15, 2008 by mail to Ms. 
Rebecca Loomis, Naval Facilities Engineering Command, Southwest, 1220 
Pacific Highway, San Diego, California 92132 or e-mail to 
Rebecca.l.loomis@navy.mil. The public scoping meeting will be held in 
the San Clemente Community Center, 100 North Calle Seville, San 
Clemente, California 92672 from 6 p.m. to 8 p.m. on December 10, 2008. 
The meeting also will be announced by notices published in the North 
County Times and San Clemente Times 15 days prior to the scoping 
meeting. A court reporter will be available at the meeting to accept 
oral comments.

    Dated: November 5, 2008.
T. M. Cruz,
Lieutenant Commander, Judge Advocate General's Corps, U.S. Navy, 
Federal Register Liaison Officer.
 [FR Doc. E8-26817 Filed 11-10-08; 8:45 am]
BILLING CODE 3810-FF-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.