Environmental Impact Statements; Notice of Availability, 66242-66243 [E8-26605]
Download as PDF
66242
Federal Register / Vol. 73, No. 217 / Friday, November 7, 2008 / Notices
Final EISs
EIS No. 20080358, ERP No. F–SFW–
G99007–TX, Williamson County
Regional Habitat Conservation Plan,
Application for an Incidental Take
Permit, Williamson County, TX.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20080371, ERP No. F–FAA–
G59005–TX, ADOPTION—Northwest
Corridor Light Rail Transit Line (LRT)
to Irving/Dallas/Fort Worth
International Airport, Construction,
Dallas County, TX.
Summary: No formal EPA comment
letter was sent to the preparing agency.
EIS No. 20080400, ERP No. F–DOE–
J05080–MT, MATL 230–kV
Transmission Line Project, To
Construct, Operate, Maintain, and
Connects a 230–kV Electric
Transmission Line, Issuance of
Presidential Permit for Right-to-Way
Grant, Cascade, Teton, Chouteau,
Pondera, Toole and Glacier Counties,
MT.
Summary: EPA continues to have
environmental concern about water
quality impacts.
EIS No. 20080384, ERP No. FS–MMS–
G02016–00, Gulf of Mexico Outer
Continental Shelf Oil and Gas Lease
Sales: 2009–2012 Western Planning
Area Sales: 210 in 2009, 215 in 2010,
and 218 in 2011, and Central Planning
Area Sales: 208 in 2009, 213 in 2010,
216 in 2011, and 222 in 2012, TX, LA,
MS, AL and FL.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: November 4, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–26667 Filed 11–6–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8587–3]
ebenthall on PROD1PC60 with NOTICES
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 10/27/2008 Through 10/31/2008
Pursuant to 40 CFR 1506.9
EIS No. 20080440, Second Draft
Supplement, COE, CA, Hamilton
Wetland Restoration Project, Dredged
Material Aquatic Transfer Facility,
VerDate Aug<31>2005
15:04 Nov 06, 2008
Jkt 217001
Implementation, Marin County, CA,
Comment Period Ends: 12/22/2008,
Contact: Cynthia Jo Fowler 415–503–
6870.
EIS No. 20080441, Draft EIS, FHW, OR,
Sellwood Bridge Project, Rehabilitate
or Replace the Bridge Crosses the
Willamette River on Southeast
Tacoma Street and Oregon State
Highway 43, Funding, Multnomah
County, OR, Comment Period Ends:
12/22/2008, Contact: Jeffrey Graham
503–587–4727.
EIS No. 20080442, Draft Supplement,
AFS, CO, White River National Forest
Travel Management Plan, Updated
Information for the Preferred
Alternative, To Accommodate and
Balance Transportation Needs,
Implementation, Eagle, Garfield,
Gunnison, Mesa, Moffat, Pitkin, Rio
Blanco, Routt and Summit Counties,
CO, Comment Period Ends: 01/06/
2009, Contact: Wendy Haskins 970–
945–3303.
EIS No. 20080443, Final Supplement,
BLM, MT, Montana Statewide Oil and
Gas, Development Alternative for Coal
Bed Natural Gas Production and
Amendment of the Powder River and
Billings Resource Management Plans,
Additional Information Three New
Alternatives, Implementation, U.S.
Army COE Section 404 Permit,
NPDES Permit, Several Cos, MT, Wait
Period Ends: 12/08/2008, Contact:
Mary Bloom 406–233–2852.
EIS No. 20080444, Final EIS, NPS, HI,
PROGRAMMATIC EIS—Ala Kahakai
National Historic Trail
Comprehensive Management Plan, To
Provide Long-Term Direction for
Natural and Cultural Resource, Island
of Hawaii, HI, Wait Period Ends: 12/
08/2008, Contact: Aric Arakaki 808–
326–6012.
EIS No. 20080445, Draft EIS, FTA, CA,
Berkeley/Albany Ferry Terminal
Study, Proposing to Implement New
Ferry Service between Berkeley/
Albany and the San Francisco Ferry
Building, Funding, San Francisco
Water Transit Authority (WETA),
Berkeley/Albany, CA, Comment
Period Ends: 12/31/2008, Contact:
Ray Sukys 415–744–3133.
EIS No. 20080446, Final EIS, BLM, CA,
Mountain View IV Wind Energy
Project, Construction and Operation,
Wind Turbine Generators on Public
Lands in Section 22 and 28 and
Private Land Section 27, Right-of-Way
Grant and Conditional Use Permit in
the City of Palm Springs, CA, Wait
Period Ends: 12/08/2008, Contact:
Greg Hill 760–251–4848.
EIS No. 20080447, Draft EIS, AFS, WI,
Camp Four Vegetation Project,
Proposes Vegetation and Road
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Management Activities, Desired
Future Condition (DFC), MedfordPark Falls Ranger District,
Chequamegon-Nicolet National
Forest, Price County, WI, Comment
Period Ends: 12/22/2008, Contact:
Ann Hoefferle 715–758–4875 Ext 24.
EIS No. 20080448, Draft EIS, NPS, AZ,
Fire Management Plan, Management
of Wildland and Prescribed Fire,
Protection of Human Life and
Property Restoration and Maintenance
of Fire Dependent Ecosystems, and
Reduction of Hazardous Fuels, Grand
Canyon National Park, Coconino
County, AZ, Comment Period Ends:
12/22/2008, Contact: Chris Marks
986–606–1050.
EIS No. 20080449, Final EIS, AFS, CA,
Sugarberry Project, Proposes to
Protect Rural Communities from Fire
Hazards by Constructing Fuel Breaks
Known as Defensible Fuel Profile
Zones (DFPZs), Feather River Ranger
District, Plumas National Forest,
Plumas, Sierra, Yuba Counties, CA,
Wait Period Ends: 12/08/2008,
Contact: Sharen Parker 530–534–
6500.
EIS No. 20080450, Final EIS, NOA, 00,
Amendment 16 to the Fishery
Management Plan for the Snapper
Grouper Fishery, Additional
Information to Analyze Four New
Management Measures Alternatives
for Gag and Vermillion Snapper,
Implementation, South Atlantic
Region, Wait Period Ends: 12/08/
2008, Contact: Roy E. Crabtree 727–
824–5305.
EIS No. 20080451, Draft EIS, COE, CA,
University of California (UC) Merced
Campus and University Community
Project, Development of a Major
Research University, To Allow for the
Discharge of Fill Material into 76.7
Acres of Wetlands, U.S. Army COE
Section 404 Permit, Merced County,
CA, Comment Period Ends: 01/05/
2009, Contact: Nancy Haley 916–557–
7731.
EIS No. 20080452, Final EIS, GSA, DC,
Department of Homeland Security
Headquarters at the St. Elizabeths
West Campus, To Consolidate Federal
Office Space on a Secure Site,
Washington, DC, Wait Period Ends:
12/08/2008, Contact: Denise Decker
202–538–5643.
EIS No. 20080453, Final EIS, FTA, 00,
Access to the Region’s Core Project,
Additional Information on the Build
Alternative, To Increase TransHudson Commuter Rail Capacity,
Improve System Safety and Reliability
between Secaucus Junction Station in
NJ and midtown Manhattan, Funding,
Hudson County, NJ, and New York
County, NY, Wait Period Ends: 12/08/
E:\FR\FM\07NON1.SGM
07NON1
Federal Register / Vol. 73, No. 217 / Friday, November 7, 2008 / Notices
2008, Contact: Donald Burns 212–
668–2182.
EIS No. 20080454, Final EIS, OSM, 00,
Black Mesa Project, Revisions to the
Life-of-Mine Operation and
Reclamation for the Kayenta and
Black Mesa Surface-Coal Mining
Operations, Right-of-Way Grant,
Mohave, Navajo, Coconino and
Yavapai Counties, AZ, and Clark
County, NV, Wait Period Ends: 12/08/
2008, Contact: Dennis Winterringer
303–293–5030.
ENVIRONMENTAL PROTECTION
AGENCY
Amended Notices
SUMMARY: In accordance with Section
122(i) of the Comprehensive
Environmental Response Compensation,
and Liability Act, as amended
(‘‘CERCLA’’), 42 U.S.C. 9622(i), notice is
hereby given of a proposed
administrative settlement for recovery of
past costs concerning the Chase Brass &
Copper Superfund Site in Watertown,
Connecticut with the following settling
party: City of Waterbury, Connecticut.
The settlement requires the settling
party to pay $75,000 to the Hazardous
Substance Superfund. The settlement
includes a covenant not to sue for the
settling party pursuant to Section 107(a)
of CERCLA, 42 U.S.C. 9607(a). For thirty
(30) days following the date of
publication of this notice, the Agency
will receive written comments relating
to the settlement. The Agency will
consider all comments received and
may modify or withdraw its consent to
the settlement if comments received
disclose facts or considerations which
indicate that the settlement is
inappropriate, improper, or inadequate.
The Agency’s response to any
comments received will be available for
public inspection at One Congress
Street, Boston, MA 02114–2023.
DATES: Comments must be submitted by
December 8, 2008.
ADDRESSES: Comments should be
addressed to Mary Jane O’Donnell,
Chief, ME/VT/CT Superfund Section,
U.S. Environmental Protection Agency,
Region I, One Congress Street, Suite
1100 (HBT), Boston, Massachusetts
02114–2023 (Telephone No. 617–918–
1371) and should refer to: In re: Chase
Brass & Copper Superfund Site, U.S.
EPA Docket No. 01–2008–0010.
FOR FURTHER INFORMATION CONTACT: A
copy of the proposed settlement may be
obtained from Mary Jane O’Donnell,
Chief, ME/VT/CT Superfund Section,
U.S. Environmental Protection Agency,
Region I, One Congress Street, Suite
1100 (HBT), Boston, Massachusetts
02114–2023 (Telephone No. 617–918–
1371; E-mail odonnell.maryjane@
epa.gov).
EIS No. 20080296, Final EIS, FHW, TX,
Grand Parkway (State Highway 99)
Selected the Preferred Alternative
Alignment, Segment F–2 from SH 249
to IH 45, Right-of-Way Permit and
U.S. Army COE Section 404 Permit,
Harris County, TX, Wait Period Ends:
11/26/2008, Contact: Justin Ham 512–
536–5963. Revision to FR Notice
Published 08/08/2008. Extending
Wait Period from 11/07/2008 to 11/
26/2008.
EIS No. 20080333, Draft EIS, IBR, CO,
Windy Gap Firming Project, Construct
a New Water Storage Reservoir To
Deliver Water to Front Range and
West Slope Communities and
Industries, Funding, NPDES and U.S.
Army COE Section 404 Permit, Grand
and Larimer Counties, CO, Comment
Period Ends: 12/29/2008, Contact:
Will Tully 970–962–4368. Revision to
FR Notice Published 08/29/2008:
Extending Comment Period 10/28/
2008 to 12/29/2008.
EIS No. 20080416, Final EIS, BLM, OR,
Western Oregon Bureau of Land
Management Districts of Salem,
Eugene, Roseburg, Coos Bay, and
Medford Districts, and the Klamath
Falls Resource Area of the Lakeview
District, Revision of the Resource
Management Plans, Implementation,
OR, Wait Period Ends: 11/17/2008,
Contact: Jerry Hubbard 503–808–
6115. Revision of FR Notice Published
10/17/2008: Correction to Wait Period
from 12/01/2008 to 11/17/2008.
ebenthall on PROD1PC60 with NOTICES
Dated: November 4, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–26605 Filed 11–6–08; 8:45 am]
BILLING CODE 6560–50–P
VerDate Aug<31>2005
15:04 Nov 06, 2008
Jkt 217001
[FRL–8738–6]
Proposed CERCLA Administrative
Cost Recovery Settlement; City of
Waterbury, CT, Chase Brass & Copper
Site, Watertown, CT
Environmental Protection
Agency (EPA).
ACTION: Notice of proposed settlement;
request for public comment.
AGENCY:
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
66243
Dated: September 8, 2008.
James T. Owens, III,
Director, Office of Site Remediation and
Restoration, Region 1.
[FR Doc. E8–26670 Filed 11–6–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8739–5]
State Program Requirements;
Approval of Application by Alaska To
Administer the National Pollutant
Discharge Elimination System
(NPDES) Program; Alaska
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: On October 31, 2008, the
Regional Administrator for the
Environmental Protection Agency,
Region 10 (EPA), approved the
application by the State of Alaska to
administer and enforce an Alaska
version of the National Pollutant
Discharge Elimination System (NPDES)
program, pursuant to section 402 of the
Clean Water Act (CWA or ‘‘the Act’’).
The State will administer the approved
Alaska Pollutant Discharge Elimination
System (APDES) program through the
Alaska Department of Environmental
Conservation (ADEC) regulating
discharges of pollutants into waters of
the United States under its jurisdiction.
EPA has approved the State’s
implementation plan that transfers the
administration of specific program
components from EPA to the State over
a three year period from the date of
program approval, subject to continuing
EPA oversight and enforcement
authority, in place of the NPDES
program previously administered by
EPA in Alaska. Upon approval of the
Alaska program, the Regional
Administrator notified the State, signed
the Memorandum of Agreement
between EPA and ADEC, and will
suspend issuance of NPDES permits in
Alaska in accordance with the State’s
approved schedule to transfer NPDES
program authority. EPA retains NPDES
permitting authority and primary
enforcement responsibility for: the biosolids program; facilities operating in
the Denali National Park and Preserve
pursuant to Alaska Statehood Act
Section 11; facilities discharging in
Indian Country as defined in 18 U.S.C.
1151; facilities operating outside state
waters (three miles offshore); and
facilities with CWA section 301(h)
waivers. This approval includes an
implementation plan that transfers the
E:\FR\FM\07NON1.SGM
07NON1
Agencies
[Federal Register Volume 73, Number 217 (Friday, November 7, 2008)]
[Notices]
[Pages 66242-66243]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-26605]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8587-3]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 10/27/2008 Through 10/31/2008
Pursuant to 40 CFR 1506.9
EIS No. 20080440, Second Draft Supplement, COE, CA, Hamilton Wetland
Restoration Project, Dredged Material Aquatic Transfer Facility,
Implementation, Marin County, CA, Comment Period Ends: 12/22/2008,
Contact: Cynthia Jo Fowler 415-503-6870.
EIS No. 20080441, Draft EIS, FHW, OR, Sellwood Bridge Project,
Rehabilitate or Replace the Bridge Crosses the Willamette River on
Southeast Tacoma Street and Oregon State Highway 43, Funding, Multnomah
County, OR, Comment Period Ends: 12/22/2008, Contact: Jeffrey Graham
503-587-4727.
EIS No. 20080442, Draft Supplement, AFS, CO, White River National
Forest Travel Management Plan, Updated Information for the Preferred
Alternative, To Accommodate and Balance Transportation Needs,
Implementation, Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio
Blanco, Routt and Summit Counties, CO, Comment Period Ends: 01/06/2009,
Contact: Wendy Haskins 970-945-3303.
EIS No. 20080443, Final Supplement, BLM, MT, Montana Statewide Oil and
Gas, Development Alternative for Coal Bed Natural Gas Production and
Amendment of the Powder River and Billings Resource Management Plans,
Additional Information Three New Alternatives, Implementation, U.S.
Army COE Section 404 Permit, NPDES Permit, Several Cos, MT, Wait Period
Ends: 12/08/2008, Contact: Mary Bloom 406-233-2852.
EIS No. 20080444, Final EIS, NPS, HI, PROGRAMMATIC EIS--Ala Kahakai
National Historic Trail Comprehensive Management Plan, To Provide Long-
Term Direction for Natural and Cultural Resource, Island of Hawaii, HI,
Wait Period Ends: 12/08/2008, Contact: Aric Arakaki 808-326-6012.
EIS No. 20080445, Draft EIS, FTA, CA, Berkeley/Albany Ferry Terminal
Study, Proposing to Implement New Ferry Service between Berkeley/Albany
and the San Francisco Ferry Building, Funding, San Francisco Water
Transit Authority (WETA), Berkeley/Albany, CA, Comment Period Ends: 12/
31/2008, Contact: Ray Sukys 415-744-3133.
EIS No. 20080446, Final EIS, BLM, CA, Mountain View IV Wind Energy
Project, Construction and Operation, Wind Turbine Generators on Public
Lands in Section 22 and 28 and Private Land Section 27, Right-of-Way
Grant and Conditional Use Permit in the City of Palm Springs, CA, Wait
Period Ends: 12/08/2008, Contact: Greg Hill 760-251-4848.
EIS No. 20080447, Draft EIS, AFS, WI, Camp Four Vegetation Project,
Proposes Vegetation and Road Management Activities, Desired Future
Condition (DFC), Medford-Park Falls Ranger District, Chequamegon-
Nicolet National Forest, Price County, WI, Comment Period Ends: 12/22/
2008, Contact: Ann Hoefferle 715-758-4875 Ext 24.
EIS No. 20080448, Draft EIS, NPS, AZ, Fire Management Plan, Management
of Wildland and Prescribed Fire, Protection of Human Life and Property
Restoration and Maintenance of Fire Dependent Ecosystems, and Reduction
of Hazardous Fuels, Grand Canyon National Park, Coconino County, AZ,
Comment Period Ends: 12/22/2008, Contact: Chris Marks 986-606-1050.
EIS No. 20080449, Final EIS, AFS, CA, Sugarberry Project, Proposes to
Protect Rural Communities from Fire Hazards by Constructing Fuel Breaks
Known as Defensible Fuel Profile Zones (DFPZs), Feather River Ranger
District, Plumas National Forest, Plumas, Sierra, Yuba Counties, CA,
Wait Period Ends: 12/08/2008, Contact: Sharen Parker 530-534-6500.
EIS No. 20080450, Final EIS, NOA, 00, Amendment 16 to the Fishery
Management Plan for the Snapper Grouper Fishery, Additional Information
to Analyze Four New Management Measures Alternatives for Gag and
Vermillion Snapper, Implementation, South Atlantic Region, Wait Period
Ends: 12/08/2008, Contact: Roy E. Crabtree 727-824-5305.
EIS No. 20080451, Draft EIS, COE, CA, University of California (UC)
Merced Campus and University Community Project, Development of a Major
Research University, To Allow for the Discharge of Fill Material into
76.7 Acres of Wetlands, U.S. Army COE Section 404 Permit, Merced
County, CA, Comment Period Ends: 01/05/2009, Contact: Nancy Haley 916-
557-7731.
EIS No. 20080452, Final EIS, GSA, DC, Department of Homeland Security
Headquarters at the St. Elizabeths West Campus, To Consolidate Federal
Office Space on a Secure Site, Washington, DC, Wait Period Ends: 12/08/
2008, Contact: Denise Decker 202-538-5643.
EIS No. 20080453, Final EIS, FTA, 00, Access to the Region's Core
Project, Additional Information on the Build Alternative, To Increase
Trans-Hudson Commuter Rail Capacity, Improve System Safety and
Reliability between Secaucus Junction Station in NJ and midtown
Manhattan, Funding, Hudson County, NJ, and New York County, NY, Wait
Period Ends: 12/08/
[[Page 66243]]
2008, Contact: Donald Burns 212-668-2182.
EIS No. 20080454, Final EIS, OSM, 00, Black Mesa Project, Revisions to
the Life-of-Mine Operation and Reclamation for the Kayenta and Black
Mesa Surface-Coal Mining Operations, Right-of-Way Grant, Mohave,
Navajo, Coconino and Yavapai Counties, AZ, and Clark County, NV, Wait
Period Ends: 12/08/2008, Contact: Dennis Winterringer 303-293-5030.
Amended Notices
EIS No. 20080296, Final EIS, FHW, TX, Grand Parkway (State Highway 99)
Selected the Preferred Alternative Alignment, Segment F-2 from SH 249
to IH 45, Right-of-Way Permit and U.S. Army COE Section 404 Permit,
Harris County, TX, Wait Period Ends: 11/26/2008, Contact: Justin Ham
512-536-5963. Revision to FR Notice Published 08/08/2008. Extending
Wait Period from 11/07/2008 to 11/26/2008.
EIS No. 20080333, Draft EIS, IBR, CO, Windy Gap Firming Project,
Construct a New Water Storage Reservoir To Deliver Water to Front Range
and West Slope Communities and Industries, Funding, NPDES and U.S. Army
COE Section 404 Permit, Grand and Larimer Counties, CO, Comment Period
Ends: 12/29/2008, Contact: Will Tully 970-962-4368. Revision to FR
Notice Published 08/29/2008: Extending Comment Period 10/28/2008 to 12/
29/2008.
EIS No. 20080416, Final EIS, BLM, OR, Western Oregon Bureau of Land
Management Districts of Salem, Eugene, Roseburg, Coos Bay, and Medford
Districts, and the Klamath Falls Resource Area of the Lakeview
District, Revision of the Resource Management Plans, Implementation,
OR, Wait Period Ends: 11/17/2008, Contact: Jerry Hubbard 503-808-6115.
Revision of FR Notice Published 10/17/2008: Correction to Wait Period
from 12/01/2008 to 11/17/2008.
Dated: November 4, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-26605 Filed 11-6-08; 8:45 am]
BILLING CODE 6560-50-P