Mackay Bar Corporation; Notice of Conduit Exemption Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 66033 [E8-26456]
Download as PDF
sroberts on PROD1PC70 with NOTICES
Federal Register / Vol. 73, No. 216 / Thursday, November 6, 2008 / Notices
project is to produce electrical power for
sale.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210,.211,.214. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or ‘‘ FISHWAY
PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule: The
application will be processed according
to the following revised Hydro
VerDate Aug<31>2005
19:11 Nov 05, 2008
Jkt 217001
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target Date
Commission issues EA ............
Comments on EA .....................
March 2009.
April 2009.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–26450 Filed 11–5–08; 8:45 am]
BILLING CODE 6717–01–P
66033
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13203) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. E8–26456 Filed 11–5–08; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Project No. 3041–004]
DEPARTMENT OF ENERGY
Mackay Bar Corporation; Notice of
Conduit Exemption Application
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
October 30, 2008.
On April 28, 2008, Mackay Bar
Corporation filed an application,
pursuant to section 16U.S.C. 791a—825r
of the Federal Power Act, for conduit
exemption of the Hettinger Project, to be
located on an irrigation system in Idaho
County, Idaho.
The proposed Hettinger Project
consists of: (1) A proposed powerhouse
containing one generating unit having
an installed capacity of 17.9 kilowatts,
and (2) appurtenant facilities. Mackay
Bar Corporation, estimates the project
would have an average annual
generation of 140 megawatt-hours and
be sold to a local utility.
Applicant Contact: Mrs. Yvonne
Goundry, General Manager, Mackay Bar
Corporation, P.O. Box 7968, Boise, ID
83707, phone (208) 344–9904.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Project No. 13269–000]
Town of Bennington, Vermont; Notice
of Conduit Exemption Application
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
October 30, 2008.
On July 23, 2008, Town of
Bennington, Vermont filed an
application, pursuant to section 16
U.S.C. 791a—825r of the Federal Power
Act, for conduit exemption of the
Bennington Water Treatment Project, to
be located on the water treatment
pipeline in Bennington County,
Vermont.
The proposed Bennington Water
Treatment Project consists of: (1) A
proposed powerhouse containing one
generating unit having an installed
capacity of 17 kilowatts, and (2)
appurtenant facilities. The Town of
Bennington, Vermont, estimates the
project would have an average annual
generation of 140 megawatt-hours and
be sold to a local utility.
Applicant Contact: Mr. Stuart A.
Huard, Town Manager, Town of
Bennington, Vermont, P.O. Box 469,
Bennington, VT 05201, phone (802)
442–1037.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
E:\FR\FM\06NON1.SGM
06NON1
Agencies
[Federal Register Volume 73, Number 216 (Thursday, November 6, 2008)]
[Notices]
[Page 66033]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-26456]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3041-004]
Mackay Bar Corporation; Notice of Conduit Exemption Application
Accepted for Filing and Soliciting Comment, Motions To Intervene, and
Competing Applications
October 30, 2008.
On April 28, 2008, Mackay Bar Corporation filed an application,
pursuant to section 16U.S.C. 791a--825r of the Federal Power Act, for
conduit exemption of the Hettinger Project, to be located on an
irrigation system in Idaho County, Idaho.
The proposed Hettinger Project consists of: (1) A proposed
powerhouse containing one generating unit having an installed capacity
of 17.9 kilowatts, and (2) appurtenant facilities. Mackay Bar
Corporation, estimates the project would have an average annual
generation of 140 megawatt-hours and be sold to a local utility.
Applicant Contact: Mrs. Yvonne Goundry, General Manager, Mackay Bar
Corporation, P.O. Box 7968, Boise, ID 83707, phone (208) 344-9904.
FERC Contact: Robert Bell, (202) 502-6062.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13203) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-26456 Filed 11-5-08; 8:45 am]