Environmental Impact Statements and Regulations; Availability of EPA Comments, 63469-63470 [E8-25454]
Download as PDF
Federal Register / Vol. 73, No. 207 / Friday, October 24, 2008 / Notices
Comment Date: 5 p.m. Eastern Time
on November 4, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–25345 Filed 10–23–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OA08–62–000]
California Independent System
Operator Corporation; Notice of FERC
Staff Attendance
October 17, 2008.
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that on October 21, 2008,
members of its staff will participate in
a meeting to be conducted by the
California Independent System Operator
(CAISO) regarding the CAISO’s
transmission planning standards
agreement. The information and
documents for the meeting can be
obtained from Judi Sanders,
jsanders@caiso.com.
Sponsored by the CAISO, this meeting
is open to all market participants, and
staff’s participation is part of the
Commission’s ongoing outreach efforts.
This meeting may discuss matters at
issue in the above captioned docket.
For further information, contact Saeed
Farrokhpay at
saeed.farrokhpay@ferc.gov; (916) 294–
0233 or Maury Kruth at
maury.kruth@ferc.gov, (916) 294–0275.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–25341 Filed 10–23–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12948–002]
Clementine Dam Hydro, LLC; Notice of
Surrender of Preliminary Permit
jlentini on PROD1PC65 with NOTICES
October 17, 2008.
Take notice that Clementine Dam
Hydro, LLC, permittee for the proposed
Clementine Dam Hydroelectric Project,
has requested that its preliminary
permit be terminated. The permit was
issued on April 16, 2008, and would
have expired on March 31, 2011.1 The
project would have been located on the
1 123
FERC ¶ 62,053.
VerDate Aug<31>2005
16:48 Oct 23, 2008
American River in Placer County,
California.
The permittee filed the request on
October 15, 2008, and the preliminary
permit for Project No. 12948 shall
remain in effect through the thirtieth
day after issuance of this notice unless
that day is a Saturday, Sunday, part-day
holiday that affects the Commission, or
legal holiday as described in section 18
CFR 385.2007, in which case the
effective date is the first business day
following that day. New applications
involving this project site, to the extent
provided for under 18 CFR Part 4, may
be filed on the next business day.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–25343 Filed 10–23–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12946–002]
Goodwin Hydro, LLC; Notice of
Surrender of Preliminary Permit
October 17, 2008.
Take notice that Goodwin Hydro,
LLC, permittee for the proposed
Goodwin Dam Hydroelectric Project,
has requested that its preliminary
permit be terminated. The permit was
issued on April 16, 2008, and would
have expired on March 31, 2011.1 The
project would have been located on the
Stanislaus River in Tuolumne and
Calaveras Counties, California.
The permittee filed the request on
October 15, 2008, and the preliminary
permit for Project No. 12946 shall
remain in effect through the thirtieth
day after issuance of this notice unless
that day is a Saturday, Sunday, part-day
holiday that affects the Commission, or
legal holiday as described in section 18
CFR 385.2007, in which case the
effective date is the first business day
following that day. New applications
involving this project site, to the extent
provided for under 18 CFR Part 4, may
be filed on the next business day.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–25342 Filed 10–23–08; 8:45 am]
BILLING CODE 6717–01–P
1 123
Jkt 217001
PO 00000
FERC ¶ 62,055.
Frm 00045
Fmt 4703
Sfmt 4703
63469
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8586–9]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 6, 2008 (73 FR 19833).
Draft EISs
EIS No. 20070453, ERP No. D–BLM–
J65497–UT, Monticello Field Office
Resource Management Plan, To Guide
the Management of Public Land,
Southern two-third of San Juan
County and small portion on the
Northern boundary within Grand
County, UT.
Summary: EPA expressed
environmental concern about the air
quality analysis and proposed changes
in visual resource management. Rating
EC2.
EIS No. 20080290, ERP No. D–STB–
F53019–00, Elgin, Joliet & Eastern
Railroad (Finance Docket No. 35087)
Proposed Acquisition by Canadian
National (CN) Railway and Grand
Trunk Corporation to connect all Five
of CN’s Rail Lines, Chicago, Illinois
and Gary, Indiana.
Summary: EPA expressed
environmental concerns about
hazardous materials transport/rail
safety, air quality, surface water,
wetlands, floodplains, environmental
justice, noise, and habitat impacts.
EPA’s recommendations include an
adaptive management program, spill
prevention/containment mitigation, and
dropping one rail-to-rail connection.
Rating EC2.
EIS No. 20080313, ERP No. D–UAF–
J11024–UT, White Elk Military
Operations Area, Propose to Establish
a New Military Operations Area
(MOA) Linked to the Utah Test, Utah
and Training Range (UTTR) Airspaces
Nevada, Hill Air Force Base, UT and
Nevada.
Summary: EPA has no objections to
the proposed action. Rating LO.
EIS No. 20080327, ERP No. D–FHW–
J40183–MT, Russell Street/South 3rd
Street Reconstruction Project, To
Address Current and Projected Safety
E:\FR\FM\24OCN1.SGM
24OCN1
63470
Federal Register / Vol. 73, No. 207 / Friday, October 24, 2008 / Notices
jlentini on PROD1PC65 with NOTICES
and Operational Needs, Funding and
U.S. Army COE Section 404 Permit,
City of Missoula, Missoula County,
MT.
Summary: EPA expressed concern
about air and water construction
impacts and recommended additional
analysis and information to fully assess
and mitigate impacts of the proposed
action. Rating EC2.
EIS No. 20080365, ERP No. D–NPS–
C61012–NY, Fort Stanwix National
Monument General Management Plan,
Implementation, Funding, City of
Rome, Oneida County, NY.
Summary: EPA has no objections to
the preferred alternative. Rating LO.
Final EISs
EIS No. 20080339, ERP No. F–BLM–
J65497–UT, Monticello Field Office
Resource Management Plan, To Guide
the Management of Public Land,
Southern two-third of San Juan
County and small portion on the
Northern boundary within Grand
County, UT.
Summary: While the Preferred
Alternative should increase the level of
overall resource protection, EPA
continues to have environmental
concerns with potential adverse impacts
to air quality from reasonably
foreseeable oil and gas development and
a reduction of landscape acres in the
Class I and II of the Visual Resource
Inventory.
EIS No. 20080354, ERP No. F–NPS–
D61058–VA, Manassas National
Battlefield Park General Management
Plan, Implementation, Fairfax and
Prince William Counties, VA.
Summary: EPA continues to have
environmental concerns about impacts
to wetlands and riparian areas,
especially forested wetlands, impacts to
interior trees and habitat and mitigation
for wetlands and removed forested
acres.
EIS No. 20080359, ERP No. F–BIA–
J65498–WY, Riverton Dome Coal Bed
Natural Gas (CBNG) and Conventional
Gas Development Project,
Construction of Well Pads, Roads,
Pipelines, and Production Facilities,
Wind River Indian Reservation
(WRIR), Fremont Count, WY.
Summary: EPA continues to have
environmental concern about surface
water impacts if the water management
strategy changes.
EIS No. 20080366, ERP No. F–AFS–
J65483–MT, Butte Resource
Management Plan, Implementation,
Beaverhead, Broadwater, Deerlodge,
Gallatin, Jefferson, Lewis and Clark,
Silver Bow and Park Counties, MT.
VerDate Aug<31>2005
16:48 Oct 23, 2008
Jkt 217001
Summary: EPA continues to have
environmental concern about riparian
impacts and impacts from motorized
uses.
EIS No. 20080368, ERP No. F–AFS–
J65508–MT, Debaugan Fuels
Reduction Project, Proposed Fuels
Reduction Activities, Lolo National
Forest, Superior Ranger District,
Mineral County, MT.
Summary: EPA continues to express
concern about water quality impacts,
and noted the need for continuing road
maintenance in the project area, and the
need for consistency with TMDLs.
EIS No. 20080377, ERP No. F–AFS–
J65514–MT, Sheppard Creek Post-Fire
Project, Timber Salvage,
Implementation, Flathead National
Forest, Flathead and Lincoln
Counties, MT.
Summary: EPA continues to have
environmental concern about water
quality impacts to Sheppard Creek.
Dated: October 21, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E8–25454 Filed 10–23–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8585–8]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/
Weekly Receipt of Environmental
Impact Statements
Filed 10/13/2008 Through 10/17/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080423, Final EIS, AFS, SD,
West Rim Project, Proposes to
Implement Multiple Resource
Management Actions, Northern Hills
Ranger District, Black Hills National
Forest, Lawrence County, SD, Wait
Period Ends: 11/24/2008, Contact:
Chris Stores 605–642–4622
EIS No. 20080424, Final EIS, NOA, 00,
Reef Fish Amendment 30B: Gag-End
Overfishing and Set Management
Thresholds and Targets; Red
Grouper—Set Optimum Yield, Total
Allowable Catch (TAC), and
Management Measures: Area
Closures: and Federal Regulatory
Compliance, Implementation, Gulf of
Mexico, Wait Period Ends:
11/24/2008, Contact: Roy E. Crabtree
727–824–5305
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
EIS No. 20080425, Final EIS, NOA, 00,
Amendment 4 to the Spiny Lobster
Fishery Management Plan of Puerto
Rico and the U.S. Virgin Islands and
Amendment 8 to the Spiny Lobster
Fishery Management Plan of the Gulf
of Mexico and South Atlantic, To
Address the Harvest and Exportation
of Undersized Lobster Tails to the
United States, Wait Period Ends:
11/24/2008, Contact: Roy E. Crabtree
727–824–5301
EIS No. 20080426, Draft EIS, BLM, WY,
South Gillette Area Coal Lease
Applications, WYW172585,
WYW173360, WYW172657,
WYW161248, Proposal to Lease Four
Tracts of Federal Coal Reserves, Belle
Ayr, Coal Creek, Caballo, and Cordero
Rojo Mines, Wyoming Powder River
Basin, Campbell County, WY,
Comment Period Ends: 12/23/2008,
Contact: Sarah Bucklin 307–261–7587
EIS No. 20080427, Final EIS, AFS, WI,
Medford Aspen Project, Preferred
Alternative is Alternative 3, To
Implement a Number of Vegetation
and Transportation Management
Activities, Medford-Park Falls Ranger
District, Chequamegon-Nicolet
National Forest, Taylor County, WI,
Wait Period Ends: 11/24/2008,
Contact: Jane Darnell 715–748–4875
Ext. 38
EIS No. 20080428, Final EIS, OSM, 00,
Excess Spoil Minimization Stream
Buffer Zones, Proposed Revisions to
the Permanent Program Regulations
Implementing the Surface Mining
Control and Reclamation Act of 1977
Concerning the Creation and Disposal
of Excess Spoil and Coal Mine Waste
and Stream Buffer Zones, Permit
Application, Wait Period Ends: 11/24/
2008, Contact: David Hartos 412–937–
2909
EIS No. 20080429, Final EIS, BLM, 00,
PROGRAMMATIC—Geothermal
Leasing in the Western United States,
Wait Period Ends: 11/24/2008,
Contact: Jack G. Peterson 208–373–
4048
EIS No. 20080430, Final EIS, COE, CA,
Three Rivers Levee Improvement
Authority, proposes construct and
maintain the Feather River Levee
Repair Project, Segment 2, Issuing 408
Permission and 404 Permit, Yuba
County, CA, Wait Period Ends:
11/24/2008, Contact: John Suazo 916–
557–6719
EIS No. 20080431, Final EIS, NSA, 00,
PROGRAMMATIC—EIS—Complex
Transformation, To Make the US
Nuclear Weapon Complex Smaller,
and more Responsive, Efficient and
Secure in Order to Meet National
Security Requirements, CA, NV, NM,
SC, TN and TX, Wait Period Ends:
E:\FR\FM\24OCN1.SGM
24OCN1
Agencies
[Federal Register Volume 73, Number 207 (Friday, October 24, 2008)]
[Notices]
[Pages 63469-63470]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-25454]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8586-9]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 6, 2008 (73 FR 19833).
Draft EISs
EIS No. 20070453, ERP No. D-BLM-J65497-UT, Monticello Field Office
Resource Management Plan, To Guide the Management of Public Land,
Southern two-third of San Juan County and small portion on the Northern
boundary within Grand County, UT.
Summary: EPA expressed environmental concern about the air quality
analysis and proposed changes in visual resource management. Rating
EC2.
EIS No. 20080290, ERP No. D-STB-F53019-00, Elgin, Joliet & Eastern
Railroad (Finance Docket No. 35087) Proposed Acquisition by Canadian
National (CN) Railway and Grand Trunk Corporation to connect all Five
of CN's Rail Lines, Chicago, Illinois and Gary, Indiana.
Summary: EPA expressed environmental concerns about hazardous
materials transport/rail safety, air quality, surface water, wetlands,
floodplains, environmental justice, noise, and habitat impacts. EPA's
recommendations include an adaptive management program, spill
prevention/containment mitigation, and dropping one rail-to-rail
connection. Rating EC2.
EIS No. 20080313, ERP No. D-UAF-J11024-UT, White Elk Military
Operations Area, Propose to Establish a New Military Operations Area
(MOA) Linked to the Utah Test, Utah and Training Range (UTTR) Airspaces
Nevada, Hill Air Force Base, UT and Nevada.
Summary: EPA has no objections to the proposed action. Rating LO.
EIS No. 20080327, ERP No. D-FHW-J40183-MT, Russell Street/South 3rd
Street Reconstruction Project, To Address Current and Projected Safety
[[Page 63470]]
and Operational Needs, Funding and U.S. Army COE Section 404 Permit,
City of Missoula, Missoula County, MT.
Summary: EPA expressed concern about air and water construction
impacts and recommended additional analysis and information to fully
assess and mitigate impacts of the proposed action. Rating EC2.
EIS No. 20080365, ERP No. D-NPS-C61012-NY, Fort Stanwix National
Monument General Management Plan, Implementation, Funding, City of
Rome, Oneida County, NY.
Summary: EPA has no objections to the preferred alternative. Rating
LO.
Final EISs
EIS No. 20080339, ERP No. F-BLM-J65497-UT, Monticello Field Office
Resource Management Plan, To Guide the Management of Public Land,
Southern two-third of San Juan County and small portion on the Northern
boundary within Grand County, UT.
Summary: While the Preferred Alternative should increase the level
of overall resource protection, EPA continues to have environmental
concerns with potential adverse impacts to air quality from reasonably
foreseeable oil and gas development and a reduction of landscape acres
in the Class I and II of the Visual Resource Inventory.
EIS No. 20080354, ERP No. F-NPS-D61058-VA, Manassas National
Battlefield Park General Management Plan, Implementation, Fairfax and
Prince William Counties, VA.
Summary: EPA continues to have environmental concerns about impacts
to wetlands and riparian areas, especially forested wetlands, impacts
to interior trees and habitat and mitigation for wetlands and removed
forested acres.
EIS No. 20080359, ERP No. F-BIA-J65498-WY, Riverton Dome Coal Bed
Natural Gas (CBNG) and Conventional Gas Development Project,
Construction of Well Pads, Roads, Pipelines, and Production Facilities,
Wind River Indian Reservation (WRIR), Fremont Count, WY.
Summary: EPA continues to have environmental concern about surface
water impacts if the water management strategy changes.
EIS No. 20080366, ERP No. F-AFS-J65483-MT, Butte Resource Management
Plan, Implementation, Beaverhead, Broadwater, Deerlodge, Gallatin,
Jefferson, Lewis and Clark, Silver Bow and Park Counties, MT.
Summary: EPA continues to have environmental concern about riparian
impacts and impacts from motorized uses.
EIS No. 20080368, ERP No. F-AFS-J65508-MT, Debaugan Fuels Reduction
Project, Proposed Fuels Reduction Activities, Lolo National Forest,
Superior Ranger District, Mineral County, MT.
Summary: EPA continues to express concern about water quality
impacts, and noted the need for continuing road maintenance in the
project area, and the need for consistency with TMDLs.
EIS No. 20080377, ERP No. F-AFS-J65514-MT, Sheppard Creek Post-Fire
Project, Timber Salvage, Implementation, Flathead National Forest,
Flathead and Lincoln Counties, MT.
Summary: EPA continues to have environmental concern about water
quality impacts to Sheppard Creek.
Dated: October 21, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E8-25454 Filed 10-23-08; 8:45 am]
BILLING CODE 6560-50-P