Northern States Power Company of Wisconsin, d/b/a Excel Energy Inc.; Notice of Availability of Environmental Assessment, 61416 [E8-24490]
Download as PDF
61416
Federal Register / Vol. 73, No. 201 / Thursday, October 16, 2008 / Notices
Number of respondents annually
Number of
responses per
respondent
Average burden hours per
response
Total annual burden hours
(1)
(2)
(3)
(1) × (2) × (3)
10
1
1
10
The estimated total cost to
respondents is $607.62. [10 hours
divided by 2080 hours 1 per year, times
$126,384 2 equals $607.62]. The average
cost per respondent is $60.76.
The reporting burden includes the
total time, effort, or financial resources
expended to generate, maintain, retain,
disclose, or provide the information
including: (1) Reviewing instructions;
(2) developing, acquiring, installing,
using technology and systems for the
purposes of collecting, validating,
verifying, processing, maintaining,
disclosing and providing information;
(3) adjusting the existing ways to
comply with any previously applicable
filing instructions and requirements; (4)
training personnel to respond to a
collection of information; (5) searching
data sources; (6) completing and
reviewing the collection of information;
and (7) transmitting, or otherwise
disclosing the information.
The cost estimate for respondents is
based upon salaries for professional and
clerical support, as well as direct and
indirect overhead costs. Direct costs
include all costs directly attributable to
providing this information, such as
administrative costs and the cost for
information technology. Indirect or
overhead costs are costs incurred by an
organization in support of its mission.
These costs apply to activities which
benefit the whole organization rather
than any one particular function or
activity.
Comments are invited on: (1) The
accuracy of the agency’s burden
estimate of the proposed information
collection, including the validity of the
methodology and assumptions used to
calculate the reporting burden; (2) ways
to enhance the quality, utility and
clarity of the information to be
collected.
Kimberly Bose,
Secretary.
[FR Doc. E8–24493 Filed 10–15–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2390–056]
Northern States Power Company of
Wisconsin, d/b/a Excel Energy Inc.;
Notice of Availability of Environmental
Assessment
October 8, 2008.
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s (Commission)
regulations (18 CFR Part 380), the Office
of Energy Projects has reviewed an
application for amendment of license
and has prepared an environmental
assessment (EA) regarding the licensee’s
request to amend the project license to
include the jurisdictional TurtleFlambeau Storage Reservoir as a project
feature of the Big Falls Project. The Big
Falls Project is located on the Flambeau
River in Rusk County, Wisconsin. This
EA concludes that the proposed action,
with recommended measures, would
not constitute a major Federal action
significantly affecting the quality of the
human environment.
Copies of the EA are available in the
Public Reference Room of the
Commission’s offices at 888 First Street,
NE., Room 1–A, Washington, DC
204265. The EA also may be viewed on
the Commission’s Internet Web site
(https://www.ferc.gov) using the
‘‘eLibrary’’ link. Enter the docket
number ‘‘P–2390’’ in the docket number
field to access the document. For
assistance with eLibrary, contact
FERCOnlineSupport@ferc.gov or call
toll-free at (866) 208–3372, or for TTY
contact (202) 502–8659.
For further information regarding this
notice, please contact CarLisa Linton at
(202) 502–8416.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–24490 Filed 10–15–08; 8:45 am]
BILLING CODE 6717–01–P
1 Number
2 Average
of hours an employee works each year.
annual salary per employee.
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8730–2; Docket ID No. EPA–HQ–ORD–
2008–00461]
Draft Toxicological Review of
Tetrachloroethylene
(Perchloroethylene): In Support of the
Summary Information in the Integrated
Risk Information System (IRIS)
Environmental Protection
Agency (EPA).
ACTION: Notice of peer-review meeting.
AGENCY:
SUMMARY: EPA is announcing that the
National Academy of Sciences (NAS)
will convene an independent panel of
experts and organize and conduct a
review of the draft document titled,
‘‘Toxicological Review of
Tetrachloroethylene
(Perchloroethylene): In Support of
Summary Information on the Integrated
Risk Information System (IRIS)’’ (EPA/
635/R–08/011A). The NAS is
organizing, convening, and conducting
this independent peer-review meeting.
A public meeting of the NAS peer
review panel will be held on November
13, 2008.
The draft document was prepared by
the National Center for Environmental
Assessment (NCEA) within EPA’s Office
of Research and Development and was
released on June 26, 2008, (73 FR 36321)
solely for the purpose of predissemination peer review under
applicable information quality
guidelines. This document has not been
formally disseminated by EPA. It does
not represent and should not be
construed to represent any Agency
policy or determination.
The draft ‘‘Toxicological Review of
Tetrachloroethylene
(Perchloroethylene): In Support of
Summary Information on the Integrated
Risk Information System (IRIS)’’ is
available on the Internet on NCEA’s
home page under a June 26, 2008,
Recent Additions entry and the Data
and Publications menus at https://
www.epa.gov/ncea. Copies are not
available from NAS.
In previous Federal Register notices
concerning this draft document, EPA
announced a 90-day public comment
period that ended September 24, 2008,
(73 FR 36321), as well as a public
Agencies
[Federal Register Volume 73, Number 201 (Thursday, October 16, 2008)]
[Notices]
[Page 61416]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-24490]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2390-056]
Northern States Power Company of Wisconsin, d/b/a Excel Energy
Inc.; Notice of Availability of Environmental Assessment
October 8, 2008.
In accordance with the National Environmental Policy Act of 1969,
as amended, and the Federal Energy Regulatory Commission's (Commission)
regulations (18 CFR Part 380), the Office of Energy Projects has
reviewed an application for amendment of license and has prepared an
environmental assessment (EA) regarding the licensee's request to amend
the project license to include the jurisdictional Turtle-Flambeau
Storage Reservoir as a project feature of the Big Falls Project. The
Big Falls Project is located on the Flambeau River in Rusk County,
Wisconsin. This EA concludes that the proposed action, with recommended
measures, would not constitute a major Federal action significantly
affecting the quality of the human environment.
Copies of the EA are available in the Public Reference Room of the
Commission's offices at 888 First Street, NE., Room 1-A, Washington, DC
204265. The EA also may be viewed on the Commission's Internet Web site
(https://www.ferc.gov) using the ``eLibrary'' link. Enter the docket
number ``P-2390'' in the docket number field to access the document.
For assistance with eLibrary, contact FERCOnlineSupport@ferc.gov or
call toll-free at (866) 208-3372, or for TTY contact (202) 502-8659.
For further information regarding this notice, please contact
CarLisa Linton at (202) 502-8416.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-24490 Filed 10-15-08; 8:45 am]
BILLING CODE 6717-01-P