Environmental Impacts Statements; Notice of Availability, 60283-60284 [E8-24171]
Download as PDF
Federal Register / Vol. 73, No. 198 / Friday, October 10, 2008 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8586–5]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
mstockstill on PROD1PC66 with NOTICES
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 6, 2008 (73 FR 19833).
Draft EISs
EIS No. 20080309, ERP No. D–TVA–
E65082–00, Mountain Reservoirs Land
Management Plan, Implementation,
Proposes to Develop a Plan for
Managing Nine Mountain Reservoirs:
Chatuge, Hiwassee, Blue Ridge, Nottely,
Ocoees 1, 2, and 3, Apalachia, and
Fontana Reservoirs, Fannin, Towns, and
Union Counties, GA; Cherokee, Clay,
Graham, and Swain Counties, North
Carolina; and Polk County, TN.
Summary: EPA expressed
environmental concerns about shoreline
development and potential water
quality impacts. Rating EC2.
EIS No. 20080315, ERP No. DA–BLM–
K67011–NV, Betze Pit Expansion
Project, Development of New
Facilities and Expansion of Existing
Open-Pit Gold Mining, Eureka and
Elko Counties, NV.
Summary: EPA expressed
environmental concerns about impacts
from tailings closure and cessation of
mine dewatering, which could include
soil salinity accumulations, saline and/
or alkaline runoff conditions,
accelerated eolian or surface water
erosion, fire, and cheatgrass or other
weed infestations. Rating EC2.
EIS No. 20080239, ERP No. DS–UAF–
A10051–MA, Pave Paws Early
Warning Radar Operation Project,
Continued Operation of the SolidState Phased-Array Radar System
(SSPARS), also known as Pave,
Phased Array Warning Systems
(PAWS), Cape Cod Air Force Station,
MA.
Summary: EPA does not object to the
proposed project. Rating LO.
Final EISs
EIS No. 20080245, ERP No. F–FHW–
J40181–UT, I–15, Corridor Project,
VerDate Aug<31>2005
20:11 Oct 09, 2008
Jkt 217001
Transportation Improvement from
Utah County to Salt Lake County, UT.
Summary: EPA continues to express
environmental concerns about wetland
and air quality impacts.
EIS No. 20080317, ERP No. F–FHW–
E40815–00, Interstate 73 North
Project, Construct on New Alignment,
from I–95 to Future I–74 in NC,
Funding, U.S. Army COE Section 404
Permit, Dillon and Malboro Counties,
SC, and Richmond and Scotland
Counties, NC.
Summary: EPA continues to have
environmental concern about wetland
impacts and the compensatory
mitigation plan.
EIS No. 20080323, ERP No. F–CGD–
A99225–00, Rulemaking for Dry Cargo
Residue (DCR) Discharges in the Great
Lakes, To Regulate Nonhazardous and
Nontoxic DCR Sweeping from Vessels
in the Great Lakes that fall under the
Jurisdiction of the United States.
Summary: EPA does not object to the
proposed project.
EIS No. 20080335, ERP No. F–BLM–
E60016–00, Alabama and Mississippi
Resource Management Plan, Analyzes
Management Alternatives for the
Public Land and Resources, in
Portions of the States of Alabama and
Mississippi.
Summary: EPA continues to have
environmental concerns because the
FEIS presented minimal discussion of
how the preferred disposal method will
affect the ground water resources,
including the Southern Hills Regional
Sole Source Aquifer.
Dated: October 7, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–24172 Filed 10–9–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8586–4]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements Filed 09/29/2008
Through 10/03/2008 Pursuant to 40 CFR
1506.9
EIS No. 20080401, Draft Supplement,
FHW, OR, Sunrise Project, Proposes to
Build a New East-West Oriented,
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
60283
Limited-Access Highway between I–
205 to Rock Creek Junction, Funding
and U.S. Army COE Section 404
Permit, Clackamas County, Oregon,
Comment Period Ends: 11/28/2008,
Contact: Thomas Picco 503–731–
8230.
EIS No. 20080402, Final EIS, AFS, MT,
Whitetail-Pipestone Travel
Management, Develop Site-Specific
Travel Management Plan, Jefferson
and Butte Ranger Districts,
Beaverhead-Deerlodge National
Forest, Jefferson and Silver Bow
Counties, MT, Wait Period Ends: 11/
10/2008, Contact: Terry Sexton 406–
287–3223.
EIS No. 20080403, Final EIS, FHW, UT,
Layton Interchange Project,
Improvements on I–15 (Exit-330) to
Provide Unrestricted Access Across
the Unicon Pacific Railroad and to
Address Traffic Congestion on Gentile
St. in West Layton, Layton City, UT,
Wait Period Ends: 11/10/2008,
Contact: Doug Atkin 801–963–0182.
EIS No. 20080404, Draft EIS, DOI, 00,
Grand Staircase—Escalante National
Monument (GSENM), Draft
Monument Management Plan
Amendment & Draft Rangeland
Health, Implementation, Portions of
Kane and Garfield, Utah and
Coconino County, AZ, Comment
Period Ends: 01/08/2009, Contact:
Paul Chapman 435–644–4309.
EIS No. 20080405, Draft Supplement,
COE, LA, Inner Harbor Navigation
Canal (IHNC) Lock Replacement
Project, Proposal for Relieving
Navigation Traffic Congestion
Associated with IHNC Lock, Located
between the St. Claude Avenue and
North Claibone Avenue Bridge,
Orleans, LA, Comment Period Ends:
11/25/2008, Contact: Richard E. Boe
504–862–1505.
EIS No. 20080406, Final EIS, BIA, MT,
Absaloka Mine Crow Reservation
South Extension Coal Lease Approval,
Proposed Mine Development Plan,
and Related Federal and State
Permitting Actions, Crow Indian
Reservation, Crow Tribe, Bighorn
County, MT, Wait Period Ends: 11/10/
2008, Contact: Rick Stefanic 406–247–
7911.
EIS No. 20080407, Draft EIS, AFS, CA,
Moonridge Animal Park Relocation
Project, Application for a Special-UsePermit to Construct and Operate a
Wild Animal Park and Associated
Facilities, Mountaintop Ranger
District, San Bernardino National
Forest, San Bernardino County, CA,
Comment Period Ends: 11/24/2008,
Contact: Paul Bennett 909–382–2819.
EIS No. 20080408, Draft EIS, COE, GA,
Fort McPherson Project, Disposal and
E:\FR\FM\10OCN1.SGM
10OCN1
60284
Federal Register / Vol. 73, No. 198 / Friday, October 10, 2008 / Notices
Reuse, Implementation, in City Limits
of Atlanta, Fulton County, GA,
Comment Period Ends: 12/19/2008,
Contact: Bob Ross 703–602–2878.
EIS No. 20080409, Draft EIS, COE, CO,
Fort Carson Grow the Army
Stationing Decision, Constructing
New Facilities to Support Additional
Soldiers and their Families, Portions
of El Paso, Pueblo and Fremont
Counties, CO, Comment Period Ends:
11/24/2008, Contact: Michael
Ackerman 410–436–2522.
Dated: October 7, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–24171 Filed 10–9–08; 8:45 am]
BILLING CODE 6560–50–P
FEDERAL COMMUNICATIONS
COMMISSION
Notice of Public Information
Collection(s) Being Reviewed by the
Federal Communications Commission
for Extension Under Delegated
Authority, Comments Requested
mstockstill on PROD1PC66 with NOTICES
October 6, 2008.
SUMMARY: The Federal Communications
Commission, as part of its continuing
effort to reduce paperwork burden
invites the general public and other
Federal agencies to take this
opportunity to comment on the
following information collection(s), as
required by the Paperwork Reduction
Act of 1995, 44 U.S.C. 3501–3520. An
agency may not conduct or sponsor a
collection of information unless it
displays a currently valid control
number. No person shall be subject to
any penalty for failing to comply with
a collection of information subject to the
Paperwork Reduction Act (PRA) that
does not display a valid control number.
Comments are requested concerning (a)
whether the proposed collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information shall have practical utility;
(b) the accuracy of the Commission’s
burden estimate; (c) ways to enhance
the quality, utility, and clarity of the
information collected; and (d) ways to
minimize the burden of the collection of
information on the respondents,
including the use of automated
collection techniques or other forms of
information technology.
DATES: Persons wishing to comment on
this information collection should
submit comments by December 9, 2008.
If you anticipate that you will be
submitting comments, but find it
VerDate Aug<31>2005
20:11 Oct 09, 2008
Jkt 217001
difficult to do so within the period of
time allowed by this notice, you should
advise the contact listed below as soon
as possible.
ADDRESSES: Direct all PRA comments to
Nicholas A. Fraser, Office of
Management and Budget (OMB), (202)
395–5887, or via fax at 202–395–5167,
or via the Internet at
Nicholas_A._Fraser@omb.eop.gov and
to Judith-B.Herman@fcc.gov, Federal
Communications Commission (FCC). To
submit your comments by e-mail send
them to: PRA@fcc.gov.
To view a copy of this information
collection request (ICR) submitted to
OMB: (1) Go to the web page https://
www.reginfo.gov/public/do/PRAMain,
(2) look for the section of the Web page
called ‘‘Currently Under Review’’, (3)
click the downward-pointing arrow in
the ‘‘Select Agency’’ box below the
‘‘Currently Under Review’’ heading, (4)
select ‘‘Federal Communications
Commission’’ from the list of agencies
presented in the ‘‘Select Agency’’ box,
(5) click the ‘‘Submit’’ button to the
right of the ‘‘Select Agency’’ box and (6)
when the list of FCC ICRs currently
under review appears, look for the title
of this ICR (or its OMB Control Number,
if there is one) and then click on the ICR
Reference Number to view detailed
information about this ICR.
FOR FURTHER INFORMATION CONTACT: For
additional information, send an e-mail
to Judith B. Herman at 202–418–0214.
SUPPLEMENTARY INFORMATION:
OMB Control No.: 3060–0812.
Title: Exemption from Payment of
Regulatory Fees When Claiming NonProfit Status.
Form No.: N/A.
Type of Review: Extension of a
currently approved collection.
Respondents: Not-for-profit
institutions and business or other forprofit.
Number of Respondents: 4,500
respondents; 4,950 responses.
Estimated Time per Response: .50
hours.
Frequency of Response: Annual, on
occasion and one time reporting
requirements and recordkeeping
requirement.
Obligation to Respond: Required to
obtain or retain benefits. Statutory
authority for this information collection
(IC) is contained in 47 U.S.C. 159.
Total Annual Burden: 2,475 hours.
Annual Cost Burden: N/A.
Privacy Act Impact Assessment: N/A.
Nature and Extent of Confidentiality:
Licensees or regulatees concerned about
disclosure of sensitive information in
any submissions to the Commission
may request confidential treatment
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
pursuant to 47 CFR 0.459 of the
Commission’s rules.
Needs and Uses: The Commission
will submit this information collection
as an extension (no change in reporting
and recordkeeping requirements) after
this 60 day comment period in order to
obtain the full three year clearance from
the OMB. There is no change in the
estimated burden hours.
The Federal Communications
Commission (FCC) in accordance with
the Communications Act of 1934, as
amended, is required to assess and
collect regulatory fees from its licensees
and regulatees in order to recover its
costs incurred in conducting
enforcement, policy and rulemaking,
and international and user information
services.
The purposes for these requirements
are to facilitate: (1) The statutory
provisions that non-profit entities be
exempt from payment of regulatory fees;
and the FCC’s ability to audit regulatory
fee payment compliance.
In order to develop a Schedule of
Regulatory Fees, the FCC must as
accurately as possible, estimate the
number of payment units and distribute
the costs. These estimates must be
adjusted to account for any licensees or
regulatees that are exempt from
payment of regulatory fees. The FCC,
therefore, requires all licensees and
regulatees that claim exemption as nonprofit entities to provide one-time only
documentation sufficient to establish
their non-profit status. Further, the FCC
is requesting that it be similarly notified
if for any reason that status changes.
The documentation necessary to
provide to the Commission will likely
take the form of an Internal Revenue
Service (IRS) ‘‘Determination Letter’’, a
state charter indicating non-profit
status, proof of church affiliation
indicating tax exempt status, etc.
The FCC is requiring licensees or
regulatees to maintain and to make
available, upon request, for inspection
such records that they would normally
keep in the course of doing business.
These records are used to compute the
amount of regulatory fee payment for
period of two years from the time the fee
payment was made. This will allow
adequate time for the FCC to conduct
any audits deemed appropriate to
determine whether fee payments were
made correctly.
Federal Communications Commission.
Marlene H. Dortch,
Secretary.
[FR Doc. E8–24192 Filed 10–9–08; 8:45 am]
BILLING CODE 6712–01–P
E:\FR\FM\10OCN1.SGM
10OCN1
Agencies
[Federal Register Volume 73, Number 198 (Friday, October 10, 2008)]
[Notices]
[Pages 60283-60284]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-24171]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8586-4]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly Receipt of Environmental Impact Statements Filed 09/29/2008
Through 10/03/2008 Pursuant to 40 CFR 1506.9
EIS No. 20080401, Draft Supplement, FHW, OR, Sunrise Project, Proposes
to Build a New East-West Oriented, Limited-Access Highway between I-205
to Rock Creek Junction, Funding and U.S. Army COE Section 404 Permit,
Clackamas County, Oregon, Comment Period Ends: 11/28/2008, Contact:
Thomas Picco 503-731-8230.
EIS No. 20080402, Final EIS, AFS, MT, Whitetail-Pipestone Travel
Management, Develop Site-Specific Travel Management Plan, Jefferson and
Butte Ranger Districts, Beaverhead-Deerlodge National Forest, Jefferson
and Silver Bow Counties, MT, Wait Period Ends: 11/10/2008, Contact:
Terry Sexton 406-287-3223.
EIS No. 20080403, Final EIS, FHW, UT, Layton Interchange Project,
Improvements on I-15 (Exit-330) to Provide Unrestricted Access Across
the Unicon Pacific Railroad and to Address Traffic Congestion on
Gentile St. in West Layton, Layton City, UT, Wait Period Ends: 11/10/
2008, Contact: Doug Atkin 801-963-0182.
EIS No. 20080404, Draft EIS, DOI, 00, Grand Staircase--Escalante
National Monument (GSENM), Draft Monument Management Plan Amendment &
Draft Rangeland Health, Implementation, Portions of Kane and Garfield,
Utah and Coconino County, AZ, Comment Period Ends: 01/08/2009, Contact:
Paul Chapman 435-644-4309.
EIS No. 20080405, Draft Supplement, COE, LA, Inner Harbor Navigation
Canal (IHNC) Lock Replacement Project, Proposal for Relieving
Navigation Traffic Congestion Associated with IHNC Lock, Located
between the St. Claude Avenue and North Claibone Avenue Bridge,
Orleans, LA, Comment Period Ends: 11/25/2008, Contact: Richard E. Boe
504-862-1505.
EIS No. 20080406, Final EIS, BIA, MT, Absaloka Mine Crow Reservation
South Extension Coal Lease Approval, Proposed Mine Development Plan,
and Related Federal and State Permitting Actions, Crow Indian
Reservation, Crow Tribe, Bighorn County, MT, Wait Period Ends: 11/10/
2008, Contact: Rick Stefanic 406-247-7911.
EIS No. 20080407, Draft EIS, AFS, CA, Moonridge Animal Park Relocation
Project, Application for a Special-Use-Permit to Construct and Operate
a Wild Animal Park and Associated Facilities, Mountaintop Ranger
District, San Bernardino National Forest, San Bernardino County, CA,
Comment Period Ends: 11/24/2008, Contact: Paul Bennett 909-382-2819.
EIS No. 20080408, Draft EIS, COE, GA, Fort McPherson Project, Disposal
and
[[Page 60284]]
Reuse, Implementation, in City Limits of Atlanta, Fulton County, GA,
Comment Period Ends: 12/19/2008, Contact: Bob Ross 703-602-2878.
EIS No. 20080409, Draft EIS, COE, CO, Fort Carson Grow the Army
Stationing Decision, Constructing New Facilities to Support Additional
Soldiers and their Families, Portions of El Paso, Pueblo and Fremont
Counties, CO, Comment Period Ends: 11/24/2008, Contact: Michael
Ackerman 410-436-2522.
Dated: October 7, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-24171 Filed 10-9-08; 8:45 am]
BILLING CODE 6560-50-P