Portland General Electric Company; Notice of Extension of Time for Filing Comments on Settlement Agreement Modification, 58578 [E8-23622]
Download as PDF
58578
Federal Register / Vol. 73, No. 195 / Tuesday, October 7, 2008 / Notices
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–23707 Filed 10–6–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2195–011]
Portland General Electric Company;
Notice of Extension of Time for Filing
Comments on Settlement Agreement
Modification
mstockstill on PROD1PC66 with NOTICES
October 1, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: New Major
License.
b. Project No.: P–2195–011.
c. Date filed: August 26, 2004.
d. Applicant: Portland General
Electric Company.
e. Name of Project: Clackamas River
Hydroelectric Project.
f. Location: Clackamas River and Oak
Grove Fork in Clackamas County,
Oregon.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)—825(r).
h. Applicant Contact: Julie A. Kiel,
Director of Hydro Licensing, 121 SW
Salmon Street, Portland, Oregon 97204.
i. FERC Contact: Nicholas Jayjack,
202–502–6073;
Nicholas.Jayjack@ferc.gov.
j. Deadline for filing comments:
October 21, 2008. Reply comments due
by October 31, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
VerDate Aug<31>2005
18:23 Oct 06, 2008
Jkt 217001
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all interveners filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Comments may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
k. Background: On March 30, 2006,
Portland General Electric Company
(PGE) filed a settlement agreement
signed by it and 32 other parties,
including federal and state resource
agencies, Indian tribes, and nongovernmental organizations to address
issues associated with the relicensing of
the Clackamas River Hydroelectric
Project. The settlement agreement
includes proposed license articles for
the protection and enhancement of
water quality, fishery resources,
terrestrial resources, recreation
resources, land uses, project area
aesthetics, and cultural resources.
On July 21, 2008, PGE filed a
modification of Proposed License
Article 14 to make the settlement
agreement consistent with its proposal
in a June 28, 2008, application to
Oregon Department of Environmental
Quality for certification pursuant to
section 401 of the Clean Water Act.
Specifically, the parties modified
Proposed License Article 14 to stipulate
that PGE file a plan for achieving certain
water temperature reductions below the
Faraday development tailrace through
either seasonal drawdowns or
channelization of Faraday Lake.
Pursuant to 18 CFR 385.602,
comments on the settlement agreement
modification were required to be filed
by August 11, 2008 (i.e., not later than
20 days after the filing of the settlement
agreement modification) with reply
comments due 10 days later. There were
no comments filed.
By this notice and pursuant to 18 CFR
385.602, additional opportunity is
provided to submit comments and reply
comments concerning the modified
provisions of the settlement agreement.
The deadline is as specified in item j
above.
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–23622 Filed 10–6–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AC08–161–000]
Florida Gas Transmission Company,
LLC; Notice of Filing
October 1, 2008.
Take notice that on September 30,
2008, Florida Gas Transmission
Company, LLC filed a response to the
Chief Accountant’s September 16, 2008,
Data Request.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
E:\FR\FM\07OCN1.SGM
07OCN1
Agencies
[Federal Register Volume 73, Number 195 (Tuesday, October 7, 2008)]
[Notices]
[Page 58578]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-23622]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2195-011]
Portland General Electric Company; Notice of Extension of Time
for Filing Comments on Settlement Agreement Modification
October 1, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: New Major License.
b. Project No.: P-2195-011.
c. Date filed: August 26, 2004.
d. Applicant: Portland General Electric Company.
e. Name of Project: Clackamas River Hydroelectric Project.
f. Location: Clackamas River and Oak Grove Fork in Clackamas
County, Oregon.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)--825(r).
h. Applicant Contact: Julie A. Kiel, Director of Hydro Licensing,
121 SW Salmon Street, Portland, Oregon 97204.
i. FERC Contact: Nicholas Jayjack, 202-502-6073;
Nicholas.Jayjack@ferc.gov.
j. Deadline for filing comments: October 21, 2008. Reply comments
due by October 31, 2008.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all interveners filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervener files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Comments may be filed electronically via the Internet in lieu of
paper. The Commission strongly encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-Filing'' link.
k. Background: On March 30, 2006, Portland General Electric Company
(PGE) filed a settlement agreement signed by it and 32 other parties,
including federal and state resource agencies, Indian tribes, and non-
governmental organizations to address issues associated with the
relicensing of the Clackamas River Hydroelectric Project. The
settlement agreement includes proposed license articles for the
protection and enhancement of water quality, fishery resources,
terrestrial resources, recreation resources, land uses, project area
aesthetics, and cultural resources.
On July 21, 2008, PGE filed a modification of Proposed License
Article 14 to make the settlement agreement consistent with its
proposal in a June 28, 2008, application to Oregon Department of
Environmental Quality for certification pursuant to section 401 of the
Clean Water Act. Specifically, the parties modified Proposed License
Article 14 to stipulate that PGE file a plan for achieving certain
water temperature reductions below the Faraday development tailrace
through either seasonal drawdowns or channelization of Faraday Lake.
Pursuant to 18 CFR 385.602, comments on the settlement agreement
modification were required to be filed by August 11, 2008 (i.e., not
later than 20 days after the filing of the settlement agreement
modification) with reply comments due 10 days later. There were no
comments filed.
By this notice and pursuant to 18 CFR 385.602, additional
opportunity is provided to submit comments and reply comments
concerning the modified provisions of the settlement agreement. The
deadline is as specified in item j above.
l. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at (866)
208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8-23622 Filed 10-6-08; 8:45 am]
BILLING CODE 6717-01-P