Issuance and Availability of Draft Regulatory Guide, DG-5026, and Cancellation of Public Meeting, 58269-58270 [E8-23514]
Download as PDF
58269
Federal Register / Vol. 73, No. 194 / Monday, October 6, 2008 / Notices
(c) Information regarding topics to be
discussed, changes to the agenda,
whether the meeting has been canceled
or rescheduled, and the time allotted to
present oral statements can be obtained
by contacting the DFO.
(d) The use of still, motion picture,
and television cameras will be
permitted at the discretion of the
Chairman and subject to the condition
that the use of such equipment will not
interfere with the conduct of the
meeting. The DFO will have to be
notified prior to the meeting and will
authorize the use of such equipment
after consultation with the Chairman.
The use of such equipment will be
restricted as is necessary to protect
proprietary or privileged information
that may be in documents, folders, etc.,
in the meeting room. Electronic
recordings will be permitted only
during those portions of the meeting
that are open to the public.
(e) A transcript will be kept for certain
open portions of the meeting and will be
available in the NRC Public Document
Room (PDR), One White Flint North,
Room O–1F21, 11555 Rockville Pike,
Rockville, MD 20852–2738. A copy of
the certified minutes of the meeting will
be available at the same location 3
months following the meeting. Copies
may be obtained upon payment of
appropriate reproduction charges. ACRS
meeting agenda, transcripts, and letter
reports are available through the PDR at
pdr@nrc.gov, by calling the PDR at 1–
800–394–4209, or from the Publicly
Available Records System (PARS)
component of NRC’s document system
(ADAMS) which is accessible from the
NRC Web site at https://www.nrc.gov/
reading-rm/adams.html or https://
www.nrc.gov/reading-rm/doccollections/ (ACRS Mtg schedules/
agendas).
(f) Video teleconferencing service is
available for observing open sessions of
ACRS meetings. Those wishing to use
this service for observing ACRS
meetings should contact Mr. Theron
Brown, ACRS Audio Visual Specialist,
(301–415–8066) between 7:30 a.m.
and3:45 p.m. Eastern Time at least 10
days before the meeting to ensure the
availability of this service. Individuals
or organizations requesting this service
will be responsible for telephone line
charges and for providing the
equipment and facilities that they use to
establish the video teleconferencing
link. The availability of video
teleconferencing services is not
guaranteed.
ACRS Subcommittee Meetings
In accordance with the revised FACA,
the agency is no longer required to
apply the FACA requirements to
meetings conducted by the
Subcommittees of the NRC Advisory
Committees, if the Subcommittee’s
recommendations would be
independently reviewed by its parent
Committee.
The ACRS, however, chose to conduct
its Subcommittee meetings in
accordance with the procedures noted
above for ACRS full Committee
meetings, as appropriate, to facilitate
public participation, and to provide a
forum for stakeholders to express their
views on regulatory matters being
considered by the ACRS. When
Subcommittee meetings are held at
locations other than at NRC facilities,
reproduction facilities may not be
available at a reasonable cost.
Accordingly, 50 copies of the materials
to be used during the meeting should be
provided for distribution at such
meetings.
Special Provisions When Proprietary
Sessions Are To Be Held
If it is necessary to hold closed
sessions for the purpose of discussing
matters involving proprietary
information, persons with agreements
permitting access to such information
may attend those portions of the ACRS
meetings where this material is being
discussed upon confirmation that such
agreements are effective and related to
the material being discussed.
The DFO should be informed of such
an agreement at least 5 working days
prior to the meeting so that it can be
confirmed, and a determination can be
made regarding the applicability of the
agreement to the material that will be
discussed during the meeting. The
minimum information provided should
include information regarding the date
of the agreement, the scope of material
included in the agreement, the project
or projects involved, and the names and
titles of the persons signing the
agreement. Additional information may
be requested to identify the specific
agreement involved. A copy of the
executed agreement should be provided
to the DFO prior to the beginning of the
meeting for admittance to the closed
session.
Meeting Dates for Calendar Year 2009
The ACRS meeting dates for Calendar
Year 2009 are provided below:
Dates
(No Meeting) ..................................................
559 .................................................................
560 .................................................................
561 .................................................................
562 .................................................................
563 .................................................................
564 .................................................................
(No Meeting) ..................................................
565 .................................................................
566 .................................................................
567 .................................................................
568 .................................................................
jlentini on PROD1PC65 with NOTICES
Meeting number
January 2009 .....................................................................................
February 5–7, 2009 ...........................................................................
March 5–7, 2009 ................................................................................
April 2–4, 2009 ...................................................................................
May 7–9, 2009 ...................................................................................
June 3–5, 2009 ..................................................................................
July 8–10, 2009 .................................................................................
August 2009 .......................................................................................
September 10–12, 2009 ....................................................................
October 8–10, 2009 ...........................................................................
November 5–7, 2009 .........................................................................
December 3–5, 2009 .........................................................................
Dated: September 30, 2008.
Annette L. Vietti-Cook,
Secretary of the Commission.
[FR Doc. E8–23539 Filed 10–3–08; 8:45 am]
BILLING CODE 7590–01–P
Issuance and Availability of Draft
Regulatory Guide, DG–5026, and
Cancellation of Public Meeting
Nuclear Regulatory
Commission.
VerDate Aug<31>2005
17:44 Oct 03, 2008
Jkt 217001
PO 00000
Frm 00160
Fmt 4703
Sfmt 4703
(No Meeting).
Thursday–Saturday.
Thursday–Saturday.
Thursday–Saturday.
Thursday–Saturday.
Wednesday–Friday.
Wednesday–Friday.
(No Meeting).
Thursday–Saturday.
Thursday–Saturday.
Thursday–Saturday.
Thursday–Saturday.
Rescheduling of Public Meeting
Associated with Notice of Issuance and
Availability of Draft Regulatory Guide
(DG) 5026.
ACTION:
NUCLEAR REGULATORY
COMMISSION
AGENCY:
Days
FOR FURTHER INFORMATION CONTACT:
Valerie Barnes, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
E:\FR\FM\06OCN1.SGM
06OCN1
58270
Federal Register / Vol. 73, No. 194 / Monday, October 6, 2008 / Notices
0001, telephone: (301) 415–5944 or email to Valerie.Barnes@nrc.gov.
SUPPLEMENTARY INFORMATION:
jlentini on PROD1PC65 with NOTICES
I. Introduction
The public meeting announced in 73
FR 56618 on September 29, 2008, has
been cancelled and will be rescheduled
for a later date. The public should go to
the U.S. Nuclear Regulatory
Commission’s (NRC’s) NRC’s Web site at
https://www.nrc.gov/public-involve.html
and watch for an announcement of the
rescheduled public meeting.
Also in 73 FR 56618, the NRC noticed
the issuance and availability of DG–
5026, ‘‘Fatigue Management for Nuclear
Power Plant Personnel,’’ for public
comment. This regulatory guide
provides a method that the staff of the
NRC considers acceptable for complying
with the Commission’s regulations for
managing personnel fatigue at nuclear
power plants.
The regulations established by the
NRC in Title 10, Part 26, of the Code of
Federal Regulations (10 CFR Part 26),
‘‘Fitness for Duty Programs,’’ establish
requirements for ensuring that
personnel are fit to safely and
competently perform their duties.
Subpart I, ‘‘Managing Fatigue,’’ of 10
CFR Part 26 establishes requirements for
managing personnel fatigue at nuclear
power plants. The regulations in
Subpart I provide a comprehensive and
integrated approach to fatigue
management, taking into account the
multiple causes and effects of worker
fatigue. The Commission recognizes that
the potential for excessive fatigue is not
solely based on extensive work hours,
but also on other causal factors, such as
stressful working conditions, sleep
disorders, accumulation of sleep debt
and the disruptions of circadian
rhythms associated with shift work.
These considerations are reflected in the
requirements of the rule in order to
ensure that licensees effectively manage
worker fatigue and provide reasonable
assurance that workers are able to safely
and competently perform their duties.
II. Further Information
The NRC staff is soliciting comments
on DG–5026. Comments may be
accompanied by relevant information or
supporting data, and should mention
DG–5026 in the subject line. Comments
submitted in writing or in electronic
form will be made available to the
public in their entirety through the
NRC’s Agencywide Documents Access
and Management System (ADAMS).
Personal information will not be
removed from the comments. Comments
may be submitted by any of the
following methods:
VerDate Aug<31>2005
17:44 Oct 03, 2008
Jkt 217001
1. Mail to: Rulemaking, Directives,
and Editing Branch, Office of
Administration, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
2. E-mail to: nrcrep.resource@nrc.gov
3. Hand-deliver to: Rulemaking,
Directives, and Editing Branch, Office of
Administration, U.S. Nuclear Regulatory
Commission, 11555 Rockville Pike,
Rockville, Maryland 20852, between
7:30 a.m. and 4:15 p.m. on Federal
workdays.
4. Fax to: Rulemaking, Directives, and
Editing Branch, Office of
Administration, U.S. Nuclear Regulatory
Commission at (301) 415–5144.
Requests for technical information
about DG–5026 may be directed to
Valerie Barnes at (301) 415–5944 or email to Valerie Barnes.
Comments would be most helpful if
received by October 31, 2008.
Comments received after that date will
be considered if it is practical to do so,
but the NRC is able to ensure
consideration only for comments
received on or before this date.
Although a time limit is given,
comments and suggestions in
connection with items for inclusion in
guides currently being developed or
improvements in all published guides
are encouraged at any time.
Electronic copies of DG–5026 are
available through the NRC’s public Web
site under Draft Regulatory Guides in
the ‘‘Regulatory Guides’’ collection of
the NRC’s Electronic Reading Room at
https://www.nrc.gov/reading-rm/doccollections/. Electronic copies are also
available in ADAMS (https://
www.nrc.gov/reading-rm/adams.html),
under Accession No. ML081960515.
In addition, regulatory guides are
available for inspection at the NRC’s
Public Document Room (PDR), which is
located at 11555 Rockville Pike,
Rockville, Maryland. The PDR’s mailing
address is USNRC PDR, Washington, DC
20555–0001. The PDR can also be
reached by telephone at (301) 415–4737
or (800) 397–4205, by fax at (301) 415–
3548, and by e-mail to
pdr.resource@nrc.gov.
Regulatory guides are not
copyrighted, and Commission approval
is not required to reproduce them.
Dated at Rockville, Maryland, this 30th day
of September 2008.
For the Nuclear Regulatory Commission.
Andrea D. Valentin,
Chief, Regulatory Guide Development Branch,
Division of Engineering, Office of Nuclear
Regulatory Research.
[FR Doc. E8–23514 Filed 10–3–08; 8:45 am]
BILLING CODE 7590–01–P
PO 00000
Frm 00161
Fmt 4703
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS); Meeting of the
ACRS Subcommittee on US–APWR;
Notice of Meeting
The ACRS Subcommittee on the US–
APWR will hold a meeting on October
23–24, 2008, Room T–2B3, 11545
Rockville Pike, Rockville, Maryland.
The meeting will be open to public
attendance, with the exception of a
portion that may be closed to protect
information that is proprietary to
Mitsubishi Heavy Industries, Ltd., and
its contractors pursuant to 5 U.S.C.
552b(c)(4).
The agenda for the subject meeting
shall be as follows:
Thursday, October 23, 2008—8 a.m.–
5 p.m.
Friday, October 24, 2008—8 a.m.–12
noon.
The Subcommittee will review five
topical reports and a draft Safety
Evaluation Report associated with the
US–APWR Design Certification
Application. The Subcommittee will
hear presentations by and hold
discussions with representatives of the
NRC staff, Mitsubishi Heavy Industries,
Ltd., and other interested persons
regarding this matter. The
Subcommittee will gather information,
analyze relevant issues and facts, and
formulate proposed positions and
actions, as appropriate, for deliberation
by the full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official, Mr. Neil Coleman,
(Telephone: 301–415–7656) five days
prior to the meeting, if possible, so that
appropriate arrangements can be made.
Electronic recordings will be permitted.
Detailed procedures for the conduct of
and participation in ACRS meetings
were published in the Federal Register
on September 26, 2007 (72 FR 54695).
Further information regarding this
meeting can be obtained by contacting
the Designated Federal Official between
8 a.m. and 5 p.m. (ET). Persons planning
to attend this meeting are urged to
contact the above named individual at
least two working days prior to the
meeting to be advised of any potential
changes to the agenda.
Dated: September 29, 2008.
Girija Shukla,
Acting Chief, Reactor Safety Branch B,
Advisory Committee on Reactor Safeguards.
[FR Doc. E8–23537 Filed 10–3–08; 8:45 am]
BILLING CODE 7590–01–P
Sfmt 4703
E:\FR\FM\06OCN1.SGM
06OCN1
Agencies
[Federal Register Volume 73, Number 194 (Monday, October 6, 2008)]
[Notices]
[Pages 58269-58270]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-23514]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Issuance and Availability of Draft Regulatory Guide, DG-5026, and
Cancellation of Public Meeting
AGENCY: Nuclear Regulatory Commission.
ACTION: Rescheduling of Public Meeting Associated with Notice of
Issuance and Availability of Draft Regulatory Guide (DG) 5026.
-----------------------------------------------------------------------
FOR FURTHER INFORMATION CONTACT: Valerie Barnes, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-
[[Page 58270]]
0001, telephone: (301) 415-5944 or e-mail to Valerie.Barnes@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The public meeting announced in 73 FR 56618 on September 29, 2008,
has been cancelled and will be rescheduled for a later date. The public
should go to the U.S. Nuclear Regulatory Commission's (NRC's) NRC's Web
site at https://www.nrc.gov/public-involve.html and watch for an
announcement of the rescheduled public meeting.
Also in 73 FR 56618, the NRC noticed the issuance and availability
of DG-5026, ``Fatigue Management for Nuclear Power Plant Personnel,''
for public comment. This regulatory guide provides a method that the
staff of the NRC considers acceptable for complying with the
Commission's regulations for managing personnel fatigue at nuclear
power plants.
The regulations established by the NRC in Title 10, Part 26, of the
Code of Federal Regulations (10 CFR Part 26), ``Fitness for Duty
Programs,'' establish requirements for ensuring that personnel are fit
to safely and competently perform their duties. Subpart I, ``Managing
Fatigue,'' of 10 CFR Part 26 establishes requirements for managing
personnel fatigue at nuclear power plants. The regulations in Subpart I
provide a comprehensive and integrated approach to fatigue management,
taking into account the multiple causes and effects of worker fatigue.
The Commission recognizes that the potential for excessive fatigue is
not solely based on extensive work hours, but also on other causal
factors, such as stressful working conditions, sleep disorders,
accumulation of sleep debt and the disruptions of circadian rhythms
associated with shift work. These considerations are reflected in the
requirements of the rule in order to ensure that licensees effectively
manage worker fatigue and provide reasonable assurance that workers are
able to safely and competently perform their duties.
II. Further Information
The NRC staff is soliciting comments on DG-5026. Comments may be
accompanied by relevant information or supporting data, and should
mention DG-5026 in the subject line. Comments submitted in writing or
in electronic form will be made available to the public in their
entirety through the NRC's Agencywide Documents Access and Management
System (ADAMS).
Personal information will not be removed from the comments.
Comments may be submitted by any of the following methods:
1. Mail to: Rulemaking, Directives, and Editing Branch, Office of
Administration, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001.
2. E-mail to: nrcrep.resource@nrc.gov
3. Hand-deliver to: Rulemaking, Directives, and Editing Branch,
Office of Administration, U.S. Nuclear Regulatory Commission, 11555
Rockville Pike, Rockville, Maryland 20852, between 7:30 a.m. and 4:15
p.m. on Federal workdays.
4. Fax to: Rulemaking, Directives, and Editing Branch, Office of
Administration, U.S. Nuclear Regulatory Commission at (301) 415-5144.
Requests for technical information about DG-5026 may be directed to
Valerie Barnes at (301) 415-5944 or e-mail to Valerie Barnes.
Comments would be most helpful if received by October 31, 2008.
Comments received after that date will be considered if it is practical
to do so, but the NRC is able to ensure consideration only for comments
received on or before this date. Although a time limit is given,
comments and suggestions in connection with items for inclusion in
guides currently being developed or improvements in all published
guides are encouraged at any time.
Electronic copies of DG-5026 are available through the NRC's public
Web site under Draft Regulatory Guides in the ``Regulatory Guides''
collection of the NRC's Electronic Reading Room at https://www.nrc.gov/
reading-rm/doc-collections/. Electronic copies are also available in
ADAMS (https://www.nrc.gov/reading-rm/adams.html), under Accession No.
ML081960515.
In addition, regulatory guides are available for inspection at the
NRC's Public Document Room (PDR), which is located at 11555 Rockville
Pike, Rockville, Maryland. The PDR's mailing address is USNRC PDR,
Washington, DC 20555-0001. The PDR can also be reached by telephone at
(301) 415-4737 or (800) 397-4205, by fax at (301) 415-3548, and by e-
mail to pdr.resource@nrc.gov.
Regulatory guides are not copyrighted, and Commission approval is
not required to reproduce them.
Dated at Rockville, Maryland, this 30th day of September 2008.
For the Nuclear Regulatory Commission.
Andrea D. Valentin,
Chief, Regulatory Guide Development Branch, Division of Engineering,
Office of Nuclear Regulatory Research.
[FR Doc. E8-23514 Filed 10-3-08; 8:45 am]
BILLING CODE 7590-01-P