Issuance and Availability of Draft Regulatory Guide, DG-5026, and Cancellation of Public Meeting, 58269-58270 [E8-23514]

Download as PDF 58269 Federal Register / Vol. 73, No. 194 / Monday, October 6, 2008 / Notices (c) Information regarding topics to be discussed, changes to the agenda, whether the meeting has been canceled or rescheduled, and the time allotted to present oral statements can be obtained by contacting the DFO. (d) The use of still, motion picture, and television cameras will be permitted at the discretion of the Chairman and subject to the condition that the use of such equipment will not interfere with the conduct of the meeting. The DFO will have to be notified prior to the meeting and will authorize the use of such equipment after consultation with the Chairman. The use of such equipment will be restricted as is necessary to protect proprietary or privileged information that may be in documents, folders, etc., in the meeting room. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. (e) A transcript will be kept for certain open portions of the meeting and will be available in the NRC Public Document Room (PDR), One White Flint North, Room O–1F21, 11555 Rockville Pike, Rockville, MD 20852–2738. A copy of the certified minutes of the meeting will be available at the same location 3 months following the meeting. Copies may be obtained upon payment of appropriate reproduction charges. ACRS meeting agenda, transcripts, and letter reports are available through the PDR at pdr@nrc.gov, by calling the PDR at 1– 800–394–4209, or from the Publicly Available Records System (PARS) component of NRC’s document system (ADAMS) which is accessible from the NRC Web site at https://www.nrc.gov/ reading-rm/adams.html or https:// www.nrc.gov/reading-rm/doccollections/ (ACRS Mtg schedules/ agendas). (f) Video teleconferencing service is available for observing open sessions of ACRS meetings. Those wishing to use this service for observing ACRS meetings should contact Mr. Theron Brown, ACRS Audio Visual Specialist, (301–415–8066) between 7:30 a.m. and3:45 p.m. Eastern Time at least 10 days before the meeting to ensure the availability of this service. Individuals or organizations requesting this service will be responsible for telephone line charges and for providing the equipment and facilities that they use to establish the video teleconferencing link. The availability of video teleconferencing services is not guaranteed. ACRS Subcommittee Meetings In accordance with the revised FACA, the agency is no longer required to apply the FACA requirements to meetings conducted by the Subcommittees of the NRC Advisory Committees, if the Subcommittee’s recommendations would be independently reviewed by its parent Committee. The ACRS, however, chose to conduct its Subcommittee meetings in accordance with the procedures noted above for ACRS full Committee meetings, as appropriate, to facilitate public participation, and to provide a forum for stakeholders to express their views on regulatory matters being considered by the ACRS. When Subcommittee meetings are held at locations other than at NRC facilities, reproduction facilities may not be available at a reasonable cost. Accordingly, 50 copies of the materials to be used during the meeting should be provided for distribution at such meetings. Special Provisions When Proprietary Sessions Are To Be Held If it is necessary to hold closed sessions for the purpose of discussing matters involving proprietary information, persons with agreements permitting access to such information may attend those portions of the ACRS meetings where this material is being discussed upon confirmation that such agreements are effective and related to the material being discussed. The DFO should be informed of such an agreement at least 5 working days prior to the meeting so that it can be confirmed, and a determination can be made regarding the applicability of the agreement to the material that will be discussed during the meeting. The minimum information provided should include information regarding the date of the agreement, the scope of material included in the agreement, the project or projects involved, and the names and titles of the persons signing the agreement. Additional information may be requested to identify the specific agreement involved. A copy of the executed agreement should be provided to the DFO prior to the beginning of the meeting for admittance to the closed session. Meeting Dates for Calendar Year 2009 The ACRS meeting dates for Calendar Year 2009 are provided below: Dates (No Meeting) .................................................. 559 ................................................................. 560 ................................................................. 561 ................................................................. 562 ................................................................. 563 ................................................................. 564 ................................................................. (No Meeting) .................................................. 565 ................................................................. 566 ................................................................. 567 ................................................................. 568 ................................................................. jlentini on PROD1PC65 with NOTICES Meeting number January 2009 ..................................................................................... February 5–7, 2009 ........................................................................... March 5–7, 2009 ................................................................................ April 2–4, 2009 ................................................................................... May 7–9, 2009 ................................................................................... June 3–5, 2009 .................................................................................. July 8–10, 2009 ................................................................................. August 2009 ....................................................................................... September 10–12, 2009 .................................................................... October 8–10, 2009 ........................................................................... November 5–7, 2009 ......................................................................... December 3–5, 2009 ......................................................................... Dated: September 30, 2008. Annette L. Vietti-Cook, Secretary of the Commission. [FR Doc. E8–23539 Filed 10–3–08; 8:45 am] BILLING CODE 7590–01–P Issuance and Availability of Draft Regulatory Guide, DG–5026, and Cancellation of Public Meeting Nuclear Regulatory Commission. VerDate Aug<31>2005 17:44 Oct 03, 2008 Jkt 217001 PO 00000 Frm 00160 Fmt 4703 Sfmt 4703 (No Meeting). Thursday–Saturday. Thursday–Saturday. Thursday–Saturday. Thursday–Saturday. Wednesday–Friday. Wednesday–Friday. (No Meeting). Thursday–Saturday. Thursday–Saturday. Thursday–Saturday. Thursday–Saturday. Rescheduling of Public Meeting Associated with Notice of Issuance and Availability of Draft Regulatory Guide (DG) 5026. ACTION: NUCLEAR REGULATORY COMMISSION AGENCY: Days FOR FURTHER INFORMATION CONTACT: Valerie Barnes, U.S. Nuclear Regulatory Commission, Washington, DC 20555– E:\FR\FM\06OCN1.SGM 06OCN1 58270 Federal Register / Vol. 73, No. 194 / Monday, October 6, 2008 / Notices 0001, telephone: (301) 415–5944 or email to Valerie.Barnes@nrc.gov. SUPPLEMENTARY INFORMATION: jlentini on PROD1PC65 with NOTICES I. Introduction The public meeting announced in 73 FR 56618 on September 29, 2008, has been cancelled and will be rescheduled for a later date. The public should go to the U.S. Nuclear Regulatory Commission’s (NRC’s) NRC’s Web site at https://www.nrc.gov/public-involve.html and watch for an announcement of the rescheduled public meeting. Also in 73 FR 56618, the NRC noticed the issuance and availability of DG– 5026, ‘‘Fatigue Management for Nuclear Power Plant Personnel,’’ for public comment. This regulatory guide provides a method that the staff of the NRC considers acceptable for complying with the Commission’s regulations for managing personnel fatigue at nuclear power plants. The regulations established by the NRC in Title 10, Part 26, of the Code of Federal Regulations (10 CFR Part 26), ‘‘Fitness for Duty Programs,’’ establish requirements for ensuring that personnel are fit to safely and competently perform their duties. Subpart I, ‘‘Managing Fatigue,’’ of 10 CFR Part 26 establishes requirements for managing personnel fatigue at nuclear power plants. The regulations in Subpart I provide a comprehensive and integrated approach to fatigue management, taking into account the multiple causes and effects of worker fatigue. The Commission recognizes that the potential for excessive fatigue is not solely based on extensive work hours, but also on other causal factors, such as stressful working conditions, sleep disorders, accumulation of sleep debt and the disruptions of circadian rhythms associated with shift work. These considerations are reflected in the requirements of the rule in order to ensure that licensees effectively manage worker fatigue and provide reasonable assurance that workers are able to safely and competently perform their duties. II. Further Information The NRC staff is soliciting comments on DG–5026. Comments may be accompanied by relevant information or supporting data, and should mention DG–5026 in the subject line. Comments submitted in writing or in electronic form will be made available to the public in their entirety through the NRC’s Agencywide Documents Access and Management System (ADAMS). Personal information will not be removed from the comments. Comments may be submitted by any of the following methods: VerDate Aug<31>2005 17:44 Oct 03, 2008 Jkt 217001 1. Mail to: Rulemaking, Directives, and Editing Branch, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001. 2. E-mail to: nrcrep.resource@nrc.gov 3. Hand-deliver to: Rulemaking, Directives, and Editing Branch, Office of Administration, U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland 20852, between 7:30 a.m. and 4:15 p.m. on Federal workdays. 4. Fax to: Rulemaking, Directives, and Editing Branch, Office of Administration, U.S. Nuclear Regulatory Commission at (301) 415–5144. Requests for technical information about DG–5026 may be directed to Valerie Barnes at (301) 415–5944 or email to Valerie Barnes. Comments would be most helpful if received by October 31, 2008. Comments received after that date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date. Although a time limit is given, comments and suggestions in connection with items for inclusion in guides currently being developed or improvements in all published guides are encouraged at any time. Electronic copies of DG–5026 are available through the NRC’s public Web site under Draft Regulatory Guides in the ‘‘Regulatory Guides’’ collection of the NRC’s Electronic Reading Room at https://www.nrc.gov/reading-rm/doccollections/. Electronic copies are also available in ADAMS (https:// www.nrc.gov/reading-rm/adams.html), under Accession No. ML081960515. In addition, regulatory guides are available for inspection at the NRC’s Public Document Room (PDR), which is located at 11555 Rockville Pike, Rockville, Maryland. The PDR’s mailing address is USNRC PDR, Washington, DC 20555–0001. The PDR can also be reached by telephone at (301) 415–4737 or (800) 397–4205, by fax at (301) 415– 3548, and by e-mail to pdr.resource@nrc.gov. Regulatory guides are not copyrighted, and Commission approval is not required to reproduce them. Dated at Rockville, Maryland, this 30th day of September 2008. For the Nuclear Regulatory Commission. Andrea D. Valentin, Chief, Regulatory Guide Development Branch, Division of Engineering, Office of Nuclear Regulatory Research. [FR Doc. E8–23514 Filed 10–3–08; 8:45 am] BILLING CODE 7590–01–P PO 00000 Frm 00161 Fmt 4703 NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on US–APWR; Notice of Meeting The ACRS Subcommittee on the US– APWR will hold a meeting on October 23–24, 2008, Room T–2B3, 11545 Rockville Pike, Rockville, Maryland. The meeting will be open to public attendance, with the exception of a portion that may be closed to protect information that is proprietary to Mitsubishi Heavy Industries, Ltd., and its contractors pursuant to 5 U.S.C. 552b(c)(4). The agenda for the subject meeting shall be as follows: Thursday, October 23, 2008—8 a.m.– 5 p.m. Friday, October 24, 2008—8 a.m.–12 noon. The Subcommittee will review five topical reports and a draft Safety Evaluation Report associated with the US–APWR Design Certification Application. The Subcommittee will hear presentations by and hold discussions with representatives of the NRC staff, Mitsubishi Heavy Industries, Ltd., and other interested persons regarding this matter. The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Official, Mr. Neil Coleman, (Telephone: 301–415–7656) five days prior to the meeting, if possible, so that appropriate arrangements can be made. Electronic recordings will be permitted. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on September 26, 2007 (72 FR 54695). Further information regarding this meeting can be obtained by contacting the Designated Federal Official between 8 a.m. and 5 p.m. (ET). Persons planning to attend this meeting are urged to contact the above named individual at least two working days prior to the meeting to be advised of any potential changes to the agenda. Dated: September 29, 2008. Girija Shukla, Acting Chief, Reactor Safety Branch B, Advisory Committee on Reactor Safeguards. [FR Doc. E8–23537 Filed 10–3–08; 8:45 am] BILLING CODE 7590–01–P Sfmt 4703 E:\FR\FM\06OCN1.SGM 06OCN1

Agencies

[Federal Register Volume 73, Number 194 (Monday, October 6, 2008)]
[Notices]
[Pages 58269-58270]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-23514]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Issuance and Availability of Draft Regulatory Guide, DG-5026, and 
Cancellation of Public Meeting

AGENCY: Nuclear Regulatory Commission.

ACTION: Rescheduling of Public Meeting Associated with Notice of 
Issuance and Availability of Draft Regulatory Guide (DG) 5026.

-----------------------------------------------------------------------

FOR FURTHER INFORMATION CONTACT: Valerie Barnes, U.S. Nuclear 
Regulatory Commission, Washington, DC 20555-

[[Page 58270]]

0001, telephone: (301) 415-5944 or e-mail to Valerie.Barnes@nrc.gov.

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The public meeting announced in 73 FR 56618 on September 29, 2008, 
has been cancelled and will be rescheduled for a later date. The public 
should go to the U.S. Nuclear Regulatory Commission's (NRC's) NRC's Web 
site at https://www.nrc.gov/public-involve.html and watch for an 
announcement of the rescheduled public meeting.
    Also in 73 FR 56618, the NRC noticed the issuance and availability 
of DG-5026, ``Fatigue Management for Nuclear Power Plant Personnel,'' 
for public comment. This regulatory guide provides a method that the 
staff of the NRC considers acceptable for complying with the 
Commission's regulations for managing personnel fatigue at nuclear 
power plants.
    The regulations established by the NRC in Title 10, Part 26, of the 
Code of Federal Regulations (10 CFR Part 26), ``Fitness for Duty 
Programs,'' establish requirements for ensuring that personnel are fit 
to safely and competently perform their duties. Subpart I, ``Managing 
Fatigue,'' of 10 CFR Part 26 establishes requirements for managing 
personnel fatigue at nuclear power plants. The regulations in Subpart I 
provide a comprehensive and integrated approach to fatigue management, 
taking into account the multiple causes and effects of worker fatigue. 
The Commission recognizes that the potential for excessive fatigue is 
not solely based on extensive work hours, but also on other causal 
factors, such as stressful working conditions, sleep disorders, 
accumulation of sleep debt and the disruptions of circadian rhythms 
associated with shift work. These considerations are reflected in the 
requirements of the rule in order to ensure that licensees effectively 
manage worker fatigue and provide reasonable assurance that workers are 
able to safely and competently perform their duties.

II. Further Information

    The NRC staff is soliciting comments on DG-5026. Comments may be 
accompanied by relevant information or supporting data, and should 
mention DG-5026 in the subject line. Comments submitted in writing or 
in electronic form will be made available to the public in their 
entirety through the NRC's Agencywide Documents Access and Management 
System (ADAMS).
    Personal information will not be removed from the comments. 
Comments may be submitted by any of the following methods:
    1. Mail to: Rulemaking, Directives, and Editing Branch, Office of 
Administration, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.
    2. E-mail to: nrcrep.resource@nrc.gov
    3. Hand-deliver to: Rulemaking, Directives, and Editing Branch, 
Office of Administration, U.S. Nuclear Regulatory Commission, 11555 
Rockville Pike, Rockville, Maryland 20852, between 7:30 a.m. and 4:15 
p.m. on Federal workdays.
    4. Fax to: Rulemaking, Directives, and Editing Branch, Office of 
Administration, U.S. Nuclear Regulatory Commission at (301) 415-5144.
    Requests for technical information about DG-5026 may be directed to 
Valerie Barnes at (301) 415-5944 or e-mail to Valerie Barnes.
    Comments would be most helpful if received by October 31, 2008. 
Comments received after that date will be considered if it is practical 
to do so, but the NRC is able to ensure consideration only for comments 
received on or before this date. Although a time limit is given, 
comments and suggestions in connection with items for inclusion in 
guides currently being developed or improvements in all published 
guides are encouraged at any time.
    Electronic copies of DG-5026 are available through the NRC's public 
Web site under Draft Regulatory Guides in the ``Regulatory Guides'' 
collection of the NRC's Electronic Reading Room at https://www.nrc.gov/
reading-rm/doc-collections/. Electronic copies are also available in 
ADAMS (https://www.nrc.gov/reading-rm/adams.html), under Accession No. 
ML081960515.
    In addition, regulatory guides are available for inspection at the 
NRC's Public Document Room (PDR), which is located at 11555 Rockville 
Pike, Rockville, Maryland. The PDR's mailing address is USNRC PDR, 
Washington, DC 20555-0001. The PDR can also be reached by telephone at 
(301) 415-4737 or (800) 397-4205, by fax at (301) 415-3548, and by e-
mail to pdr.resource@nrc.gov.
    Regulatory guides are not copyrighted, and Commission approval is 
not required to reproduce them.

    Dated at Rockville, Maryland, this 30th day of September 2008.

    For the Nuclear Regulatory Commission.
Andrea D. Valentin,
Chief, Regulatory Guide Development Branch, Division of Engineering, 
Office of Nuclear Regulatory Research.
 [FR Doc. E8-23514 Filed 10-3-08; 8:45 am]