Environmental Impacts Statements; Notice of Availability, 57619-57620 [E8-23385]
Download as PDF
Federal Register / Vol. 73, No. 193 / Friday, October 3, 2008 / Notices
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 23, 2008.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–23361 Filed 10–2–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EF08–3022–000]
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–23316 Filed 10–2–08; 8:45 am]
Southeastern Power Administration;
Notice of Filing
BILLING CODE 6717–01–P
mstockstill on PROD1PC66 with NOTICES
September 25, 2008.
Take notice that on September 16,
2008, the Deputy Secretary, U.S.
Department of Energy, pursuant to the
authority vested on the Deputy
Secretary by the Department of Energy’s
Delegation Order Nos. 00–001.00C and
00–037.00, and by sections 301(b) and
302(a) of the Department of Energy
Organization Act (Pub. L. 95091),
submitted to the Federal Energy
Regulatory Commission, pursuant to the
authority vested by Delegation Order
No. 00–37.00, for confirmation and
approval on a final basis, Rate
Schedules CBR–1–G, CSI–1–G, CEK–1–
G, CM–1–G, CC–1–G, CC–1–H, CK–1–G,
CTV–1–G, and Replacement–3, effective
October 1, 2008 through September 30,
2013.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
VerDate Aug<31>2005
23:33 Oct 02, 2008
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 16, 2008.
Jkt 217001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8586–3]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 6, 2008 (73 FR 19833).
Draft EISs
EIS No. 20080288, ERP No. DS–NOA–
E91023–00, Amendment 16 to the
Fishery Management Plan for the
Snapper Grouper Fishery, Additional
Information to Analyze Four New
Management Measures Alternatives
for Gag and Vermillion Snapper,
Implementation, South Atlantic
Region.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
57619
Summary: While EPA has no
objections to the proposed action, EPA
did request clarification of the SEDAR
data for the vermillion snapper. Rating
LO.
EIS No. 20080303, ERP No. DS–USN–
K11094–00, Developing Home Port
Facilities for Three NIMITZ-Class
Aircraft Carriers in Support of the
U.S. Pacific Fleet, New Circumstances
and Information to Supplements (the
1999 FEIS) Coronado, CA.
Summary: EPA does not object to the
proposed project. Rating LO.
Final EISs
EIS No. 20080324, ERP No. F–BLM–
J65331–WY, Kemmerer Field Office
Planning Area, Resource Management
Plan, Implementation, Lincoln,
Sweetwater and Uinta Counties, WY.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20080325, ERP No. F–NRC–
E06025–NC, Generic—License
Renewal of Nuclear Plants (GEIS)
Regarding Shearon Harris Nuclear
Power Plant, Unit 1, Plant-Specific
Supplement 33 to NUREG–1437,
Wake County, NC.
Summary: EPA continues to have
environmental concerns about
radiological monitoring of plant
effluents, and storage and disposition of
radioactive waste.
Dated: September 30, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–23389 Filed 10–2–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8586–2]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 09/22/2008 through 09/26/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080380, Draft EIS, AFS, CA,
Tahoe National Forest Motorized
Travel Management, Implementation,
Sierra Nevada Mountains, Nevada,
Placer, Plumas, Sierra and Yuba
Counties, CA, Comment Period Ends:
11/26/2008, Contact: David Arrasmith
530–478–6220.
EIS No. 20080381, Draft EIS, IBR, CA,
South Coast Conduit/Upper Reach
E:\FR\FM\03OCN1.SGM
03OCN1
mstockstill on PROD1PC66 with NOTICES
57620
Federal Register / Vol. 73, No. 193 / Friday, October 3, 2008 / Notices
Reliability Project, Construction of a
Second Water Pipeline for Improving
Water Supply, U.S. Army COE
Section 10 and 404 Permits, Santa
Barbara County, CA, Comment Period
Ends: 11/17/2008, Contact: Judi Tapia
559–487–5138.
EIS No. 20080382, Final EIS, AFS, NM,
Surface Management of Gas Leasing
and Development, Proposes to Amend
the Forest Plan include Standard and
Guidelines Related to Gas Leasing and
Development in the Jicarilla Ranger
District, Carson National Forest, Rio
Arriba County, NM, Wait Period Ends:
11/03/2008, Contact: Audrey
Kuykerdall 505–758–6200.
EIS No. 20080383, Draft EIS, AFS, VT,
Deerfield Wind Project, Application
for a Land Use Authorization to
Construct and Operate a Wind Energy
Facility, Special Use Authorization
Permit, Towns of Searsburg and
Readsboro, Manchester Ranger
District, Green Mountain National
Forest, Bennington County, VT,
Comment Period Ends: 11/28/2008,
Contact: Bob Bayer 802–362–2307 Ext
218.
EIS No. 20080384, Final Supplement,
MMS, 00, Gulf of Mexico Outer
Continental Shelf Oil and Gas Lease
Sales: 2009–2012 Western Planning
Area Sales: 210 in 2009, 215 in 2010,
and 218 in 2011, and Central Planning
Area Sales: 208 in 2009, 213 in 2010,
216 in 2011, and 222 in 2012, TX, LA,
MS, AL and FL, Wait Period Ends: 11/
03/2008, Contact: Mary Boatman 703–
787–1662.
EIS No. 20080385, Draft EIS, FTA, MD,
Red Line Corridor Transit Study,
Alternatives Analysis,
Implementation of a New East-West
Transit Alignment through Baltimore,
Baltimore County, MD, Comment
Period Ends: 01/02/2009, Contact:
Gail McFadden-Roberts 215–656–
7100.
EIS No. 20080386, Draft EIS, COE, CA,
San Pedro Waterfront Project,
Proposed Specific Development
Project and Associated Infrastructure
Improvements on Approximately 400
Acres, Currently Operated by Los
Angeles Harbor Department (LAHD),
Located along the West Side of Los
Angeles Harbor’s Main Channel, from
the Vincent Thomas Bridge to Cabrillo
Beach, U.S. Army Section 10 and 404
and Section 103 Marine Protection,
Research, and Sanctuaries Act
Permits, (MPRSA) City of Los
Angeles, CA, Comment Period Ends:
12/08/2008, Contact: Dr. Spencer D.
MacNeil 805–585–2152.
EIS No. 20080387, Final EIS, NPS, CO,
Curecanti National Recreation Area
Resource Protection Study, Gunnison
VerDate Aug<31>2005
23:33 Oct 02, 2008
Jkt 217001
and Montrose Counties, CO, Wait
Period Ends: 11/03/2008, Contact:
Dave Roberts 970–240–5432.
EIS No. 20080388, Draft EIS, AFS, OR,
BLT Project, Proposed Vegetation
Management Activities, Crescent
Ranger District, Deschutes National
Forest, Deschutes County, OR,
Comment Period Ends: 11/17/2008,
Contact: Chris Mickle 541–433–3200.
EIS No. 20080389, Second Draft
Supplement, AFS, ID, Southwest
Idaho Ecogroup Land and Resource
Management Plan, Provide Additional
Information to Reanalyzes the Effects
of Current and Proposed Management
on Rock Mountain Bighorn Sheep
Viability in the Payette National
Forest 2003 FEIS, Boise National
Forest, Payette National Forest and
Sawtooth National Forest, Forest Plan
Revision, Implementation, Several
Counties, ID; Malhaur County, OR
and Box Elder County, UT, Comment
Period Ends: 01/02/2009, Contact:
Patricia Soucek 208–634–0812.
EIS No. 20080390, Final EIS, BLM, MT,
Montana Tunnels Mine Project,
Proposed M-Pit Mine Expansion to
Existing Mine Pit to Access and Mine
Additional Ore Resources, Jefferson
County, MT, Wait Period Ends: 11/03/
2008, Contact: David Williams 406–
533–7655.
EIS No. 20080391, Draft EIS, FHW, MN,
Trunk Highway 14 (US 14) Project,
Proposed Construction from Interstate
35 to Trunk Highway 56, Funding,
NPDES and U.S. Army COE Section
404 Permits, Steele and Doge
Counties, MN, Comment Period Ends:
11/17/2008, Contact: Cheryle Martin
651–291–6120.
EIS No. 20080392, Final EIS, BLM, NV,
Cortez Hills Expansion Project,
Proposes to Construct and Operate a
New Facilities and Expansion of the
Existing Open-Pit Gold Mining and
Processing Operations, Crescent
Valley, Lander and Eureka Counties,
NV, Wait Period Ends: 11/03/2008,
Contact: Christopher Worthington
775–635–4000.
EIS No. 20080393, Draft EIS, NRC, PA,
Generic—License Renewal of Nuclear
Plants, Supplement 36 to NUREG–
1437, Regarding Beaver Valley Power
Station, Units 1 and 2, Plant-Specific,
Issuing Nuclear Power Plant
Operating License for an Additional
20-Year Period, PA, Comment Period
Ends: 12/10/2008, Contact: Emmanuel
Sayoc 301–415–1924
EIS No. 20080394, Final EIS, BLM, NV,
White Pine Energy Station Project,
Construction and Operation, Coalfired Electric Power Generating Plant,
White Pine County, NV, Wait Period
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Ends: 11/03/2008, Contact: Jane
Peterson 775–289–1800.
EIS No. 20080395, Draft EIS, AFS, 00,
Sioux Ranger District Travel
Management Project, To Designate the
Road and Trail and Areas Suitable for
Public Motorized Travel, Sioux
Ranger District, Custer National
Forest, Carter County of MT and
Harding County of South Dakota,
Comment Period Ends: 11/17/2008,
Contact: Doug Epperly 404–657–6205
Ext. 225
EIS No. 20080396, Draft EIS, AFS, MT,
Ashland Ranger District Travel
Management Project, Proposing to
Designate Routes for Public Motorized
Use, Ashland Ranger District, Custer
National Forest, Rosebud and Power
River Counties, MT, Comment Period
Ends: 11/17/2008, Contact: Doug
Epperly 406–657–6205 Ext. 225.
EIS No. 20080397, Draft EIS, AFS, CO,
Hermosa Landscape Grazing Analysis
Project, Proposes to Continue to
Authorize Livestock Grazing Cascade
Reservoir, Dutch Creek, Elbert Creek,
Hope Creek South Fork, and Upper
Hermosa Allotments, Columbine
Ranger District, San Juan National
Forest, LaPlata and San Juan
Counties, CO, Comment Period Ends:
11/17/2008, Contact: Cam Hooley
970–884–1414.
EIS No. 20080398, Draft EIS, NIH, MT,
Rocky Mountain Laboratories (RML)
Master Plan, Implementation,
Hamilton, Ravalli County, MT,
Comment Period Ends: 12/12/2008,
Contact: Mark Radtke 301–451–6467.
EIS No. 20080399, Final Supplement,
FTA, CA, Central Subway/Third
Street Light Rail Phase 2, Funding,
San Francisco Municipal
Transportation Agency, in the City
and County San Francisco, CA, Wait
Period Ends: 11/03/2008, Contact:
Ray Sukys 415–744–3133.
EIS No. 20080400, Final EIS, DOE, MT,
MATL 230–kV Transmission Line
Project, To Construct, Operate,
Maintain, and Connects a 230–kV
Electric Transmission Line, Issuance
of Presidential Permit for Right-toWay Grant, Cascade, Teton, Chouteau,
Pondera, Toole and Glacier Counties,
MT, Wait Period Ends: 11/03/2008,
Contact: Ellen Russell 202–596–9624.
Dated: September 30, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–23385 Filed 10–2–08; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\03OCN1.SGM
03OCN1
Agencies
[Federal Register Volume 73, Number 193 (Friday, October 3, 2008)]
[Notices]
[Pages 57619-57620]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-23385]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8586-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/22/2008 through 09/26/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080380, Draft EIS, AFS, CA, Tahoe National Forest Motorized
Travel Management, Implementation, Sierra Nevada Mountains, Nevada,
Placer, Plumas, Sierra and Yuba Counties, CA, Comment Period Ends: 11/
26/2008, Contact: David Arrasmith 530-478-6220.
EIS No. 20080381, Draft EIS, IBR, CA, South Coast Conduit/Upper Reach
[[Page 57620]]
Reliability Project, Construction of a Second Water Pipeline for
Improving Water Supply, U.S. Army COE Section 10 and 404 Permits, Santa
Barbara County, CA, Comment Period Ends: 11/17/2008, Contact: Judi
Tapia 559-487-5138.
EIS No. 20080382, Final EIS, AFS, NM, Surface Management of Gas Leasing
and Development, Proposes to Amend the Forest Plan include Standard and
Guidelines Related to Gas Leasing and Development in the Jicarilla
Ranger District, Carson National Forest, Rio Arriba County, NM, Wait
Period Ends: 11/03/2008, Contact: Audrey Kuykerdall 505-758-6200.
EIS No. 20080383, Draft EIS, AFS, VT, Deerfield Wind Project,
Application for a Land Use Authorization to Construct and Operate a
Wind Energy Facility, Special Use Authorization Permit, Towns of
Searsburg and Readsboro, Manchester Ranger District, Green Mountain
National Forest, Bennington County, VT, Comment Period Ends: 11/28/
2008, Contact: Bob Bayer 802-362-2307 Ext 218.
EIS No. 20080384, Final Supplement, MMS, 00, Gulf of Mexico Outer
Continental Shelf Oil and Gas Lease Sales: 2009-2012 Western Planning
Area Sales: 210 in 2009, 215 in 2010, and 218 in 2011, and Central
Planning Area Sales: 208 in 2009, 213 in 2010, 216 in 2011, and 222 in
2012, TX, LA, MS, AL and FL, Wait Period Ends: 11/03/2008, Contact:
Mary Boatman 703-787-1662.
EIS No. 20080385, Draft EIS, FTA, MD, Red Line Corridor Transit Study,
Alternatives Analysis, Implementation of a New East-West Transit
Alignment through Baltimore, Baltimore County, MD, Comment Period Ends:
01/02/2009, Contact: Gail McFadden-Roberts 215-656-7100.
EIS No. 20080386, Draft EIS, COE, CA, San Pedro Waterfront Project,
Proposed Specific Development Project and Associated Infrastructure
Improvements on Approximately 400 Acres, Currently Operated by Los
Angeles Harbor Department (LAHD), Located along the West Side of Los
Angeles Harbor's Main Channel, from the Vincent Thomas Bridge to
Cabrillo Beach, U.S. Army Section 10 and 404 and Section 103 Marine
Protection, Research, and Sanctuaries Act Permits, (MPRSA) City of Los
Angeles, CA, Comment Period Ends: 12/08/2008, Contact: Dr. Spencer D.
MacNeil 805-585-2152.
EIS No. 20080387, Final EIS, NPS, CO, Curecanti National Recreation
Area Resource Protection Study, Gunnison and Montrose Counties, CO,
Wait Period Ends: 11/03/2008, Contact: Dave Roberts 970-240-5432.
EIS No. 20080388, Draft EIS, AFS, OR, BLT Project, Proposed Vegetation
Management Activities, Crescent Ranger District, Deschutes National
Forest, Deschutes County, OR, Comment Period Ends: 11/17/2008, Contact:
Chris Mickle 541-433-3200.
EIS No. 20080389, Second Draft Supplement, AFS, ID, Southwest Idaho
Ecogroup Land and Resource Management Plan, Provide Additional
Information to Reanalyzes the Effects of Current and Proposed
Management on Rock Mountain Bighorn Sheep Viability in the Payette
National Forest 2003 FEIS, Boise National Forest, Payette National
Forest and Sawtooth National Forest, Forest Plan Revision,
Implementation, Several Counties, ID; Malhaur County, OR and Box Elder
County, UT, Comment Period Ends: 01/02/2009, Contact: Patricia Soucek
208-634-0812.
EIS No. 20080390, Final EIS, BLM, MT, Montana Tunnels Mine Project,
Proposed M-Pit Mine Expansion to Existing Mine Pit to Access and Mine
Additional Ore Resources, Jefferson County, MT, Wait Period Ends: 11/
03/2008, Contact: David Williams 406-533-7655.
EIS No. 20080391, Draft EIS, FHW, MN, Trunk Highway 14 (US 14) Project,
Proposed Construction from Interstate 35 to Trunk Highway 56, Funding,
NPDES and U.S. Army COE Section 404 Permits, Steele and Doge Counties,
MN, Comment Period Ends: 11/17/2008, Contact: Cheryle Martin 651-291-
6120.
EIS No. 20080392, Final EIS, BLM, NV, Cortez Hills Expansion Project,
Proposes to Construct and Operate a New Facilities and Expansion of the
Existing Open-Pit Gold Mining and Processing Operations, Crescent
Valley, Lander and Eureka Counties, NV, Wait Period Ends: 11/03/2008,
Contact: Christopher Worthington 775-635-4000.
EIS No. 20080393, Draft EIS, NRC, PA, Generic--License Renewal of
Nuclear Plants, Supplement 36 to NUREG-1437, Regarding Beaver Valley
Power Station, Units 1 and 2, Plant-Specific, Issuing Nuclear Power
Plant Operating License for an Additional 20-Year Period, PA, Comment
Period Ends: 12/10/2008, Contact: Emmanuel Sayoc 301-415-1924
EIS No. 20080394, Final EIS, BLM, NV, White Pine Energy Station
Project, Construction and Operation, Coal-fired Electric Power
Generating Plant, White Pine County, NV, Wait Period Ends: 11/03/2008,
Contact: Jane Peterson 775-289-1800.
EIS No. 20080395, Draft EIS, AFS, 00, Sioux Ranger District Travel
Management Project, To Designate the Road and Trail and Areas Suitable
for Public Motorized Travel, Sioux Ranger District, Custer National
Forest, Carter County of MT and Harding County of South Dakota, Comment
Period Ends: 11/17/2008, Contact: Doug Epperly 404-657-6205 Ext. 225
EIS No. 20080396, Draft EIS, AFS, MT, Ashland Ranger District Travel
Management Project, Proposing to Designate Routes for Public Motorized
Use, Ashland Ranger District, Custer National Forest, Rosebud and Power
River Counties, MT, Comment Period Ends: 11/17/2008, Contact: Doug
Epperly 406-657-6205 Ext. 225.
EIS No. 20080397, Draft EIS, AFS, CO, Hermosa Landscape Grazing
Analysis Project, Proposes to Continue to Authorize Livestock Grazing
Cascade Reservoir, Dutch Creek, Elbert Creek, Hope Creek South Fork,
and Upper Hermosa Allotments, Columbine Ranger District, San Juan
National Forest, LaPlata and San Juan Counties, CO, Comment Period
Ends: 11/17/2008, Contact: Cam Hooley 970-884-1414.
EIS No. 20080398, Draft EIS, NIH, MT, Rocky Mountain Laboratories (RML)
Master Plan, Implementation, Hamilton, Ravalli County, MT, Comment
Period Ends: 12/12/2008, Contact: Mark Radtke 301-451-6467.
EIS No. 20080399, Final Supplement, FTA, CA, Central Subway/Third
Street Light Rail Phase 2, Funding, San Francisco Municipal
Transportation Agency, in the City and County San Francisco, CA, Wait
Period Ends: 11/03/2008, Contact: Ray Sukys 415-744-3133.
EIS No. 20080400, Final EIS, DOE, MT, MATL 230-kV Transmission Line
Project, To Construct, Operate, Maintain, and Connects a 230-kV
Electric Transmission Line, Issuance of Presidential Permit for Right-
to-Way Grant, Cascade, Teton, Chouteau, Pondera, Toole and Glacier
Counties, MT, Wait Period Ends: 11/03/2008, Contact: Ellen Russell 202-
596-9624.
Dated: September 30, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-23385 Filed 10-2-08; 8:45 am]
BILLING CODE 6560-50-P